Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Finance 46C RAIPUR KHURD CHANDIGARH | -5.00% | ₹1.6 L | L1 | Admitted-Finance |
| 2 | L2₹1.6 L+₹238.72 (0.15%)Admitted-Finance | -4.86% | ₹1.6 L+₹238.72 (0.15%) | L2 | Admitted-Finance |
| 3 | L3₹1.6 L+₹2,070.01 (1.28%)Admitted-Finance 708 14 B D COLONY SECTOR 26 CHANDIGARH | -3.79% | ₹1.6 L+₹2,070.01 (1.28%) | L3 | Admitted-Finance |
| 4 | L4₹1.6 L+₹2,557.67 (1.58%)Admitted-Finance 222 HSIDC BARWALA PANCHKULA | -3.50% | ₹1.6 L+₹2,557.67 (1.58%) | L4 | Admitted-Finance |
| 5 | L5₹1.7 L+₹3,393.18 (2.09%)Admitted-Finance | -3.01% | ₹1.7 L+₹3,393.18 (2.09%) | L5 | Admitted-Finance |
Tender Value
₹1.7 L
EMD Value
₹3,500
Closing Date
4 Jun 2026, 4:00 pmClosed
Executive Eng. II
Construction office,P.U. Campus
Flooring tiles at PU-ISSER of Guru Teg Bahadur Building in P.U. Campus Sector-14 Chandigarh.
2026_PU_92529_1
6852/EE/Mtc.
Open Tender
Civil Works
Percentage
120 days
P.U. Campus Sector-14 Chandigarh.
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,500
12 Jun 2026
19 May 2026
5 Jun 2026
19 May 2026
4 Jun 2026
19 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | |||||
| 1.01 | All kinds of soil. (Ref:-2.8.1) | 4.08 | Cum | 286 | ₹1,166.88 |
| 2Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level | |||||
| 2.01 | 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal siz (Ref:-4.1.10) | 1.34 | Cum | 5,734 | ₹7,683.56 |
| 3Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | |||||
| 3.01 | 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) (Ref:-5.1.3) | 1.66 | Cum | 8,795 | ₹14,599.7 |
| 4Centering and shuttering including strutting, propping etc. and removal of form for : | |||||
| 4.01 | Shelves (Cast in situ) (Ref:-5.9.4) | 7.02 | Sqm | 680 | ₹4,773.6 |
| 5Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. | |||||
| 5.01 | Thermo-Mechanically Treated bars. (Ref:-5.22.6) | 100 | Kg | 102 | ₹10,200 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.64 MB
BOQ_113221.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .