Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.4 LAccepted-Finance | ₹31.4 L | L1 | Accepted-Finance OK |
| 2 | L2₹31.4 L+₹8,824.16 (0.28%)Rejected-Finance | ₹31.4 L+₹8,824.16 (0.28%) | L2 | Rejected-Finance Reject |
| 3 | L3₹31.5 L+₹12,921.09 (0.41%)Rejected-Finance | ₹31.5 L+₹12,921.09 (0.41%) | L3 | Rejected-Finance Reject |
Tender Value
₹31.5 L
EMD Value
₹94,530
Closing Date
20 Aug 2026, 1:00 pmClosed
Executive Officer NP Thanabhawan
Nagar Panchayat Thanabhawan
Ward No 02 Mohalla Nabipura me Frends colony ke pass Barat Ghar ka nirman karye
2026_DOLBU_1173837_1
1104/NPT/ET/2026-27
Open Tender
Civil Works
Percentage
90 days
Thanabhawan
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,151
Executive Officer NP Thanabhawan
₹94,530
24 Aug 2026
31 Jul 2026
20 Aug 2026
31 Jul 2026
20 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. as directed by the Engineer-in charge upto a distance of 30 M. from the foundation trenches. S.I No-251, Foundation of wall , column footing foundation, Toilet wall, Stair case | 92.83 | cum | 90 | ₹8,354.7 |
| 1.02 | Cement Concrete with 40mm gauge stone ballast, fine sand and cement in proportion of 8:4:1 including supply of all materials, labour, T&P etc. required for proper completion of the work as per site direction of engineer in charge. (S.1-281), Wall foundation, column footing foundation, Toilet wall, Stair case | 8.56 | cum | 4,850 | ₹41,516 |
| 1.03 | M-150 Brick Work in 1:4 cement & fine sand mortar in foundation and plinth including supply of all materials, Labour and T&P etc. Required for proper completion of the work. (S.I-305), Hall & Kitchen, Toilet | 59.44 | cum | 4,520 | ₹2,68,668.8 |
| 1.04 | RCC work with cement, approved coarse sand and 20mm gauge approved stone ballast, coarse sand and cement, in the proportion of 3:1.5:1 including supply of all materials, labour, T&P etc. required for proper completion of the work. S.I Chap 20 SI 287 a, Plinth beam, Footing | 25.44 | cum | 6,310 | ₹1,60,526.4 |
| 2.01 | M-150 Brick Work with cement and fine sand in proportion of 1:4 in superstructure including supply of all materials labour. Tools & plants etc. required for proper completion of the work S.I No 305 and 310, Deduction for column (-), Deduction for Door (-), Toilet, Deduction for window (-) | 74.49 | cum | 4,730 | ₹3,52,337.7 |
| 2.02 | RCC work with cement, approved coarse sand and 20mm gauge approved stone ballast, coarse sand and cement, in the proportion of 3:1.5:1 including supply of all materials, labour, T&P etc. required for proper completion of the work. S.I Chap 20 SI 289, Column | 11.25 | cum | 7,800 | ₹87,750 |
| 3 | RCC work with cement, approved coarse sand and 20mm gauge approved stone ballast, coarse sand and cement, in the proportion of 3:1.5:1 including supply of all materials, labour, T&P etc. required for proper completion of the work. S.I Chap 20 SI 284 A, Slab, Tee beam, Deduction for Column (-) , Stair case landing | 36.18 | cum | 7,400 | ₹2,67,732 |
| 4 | M.S reinforcement work in R.C.C work. Qty of R.C.C item | 62.92 | Qtl | 7,860 | ₹4,94,551.2 |
| 5 | 12mm thick plaster with cement and fine sand 1:4 over brick work minimum thickness not to be less than lem. Including supply of all materials, labour, tools & plants etc. required for proper completion of the work as per site direction of engineer in charge. (S.1-584), Hall & Kitchen, Toilet, Deduction for window (-) , Vent, Deduction for Door (-) | 662.66 | sqm | 160 | ₹1,06,025.6 |
| 6 | Finishing wall with weather coat paint of approved make and quality on new work with two coat to give an even shade including supply of all materials, labour, Tools & plant etc. required for proper completion of the work. SI No 662 New Item, Qty As item No . 10, celling | 909.51 | sqm | 98 | ₹89,131.98 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_2204975.xls
BOQ • 0.32 MB
Nivida.pdf
Tender Documents • 0.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .