Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹70.2 LAccepted-AOC 286 SECTOR 32 A CHANDIGARH | ₹70.2 L | L1 | Accepted-AOC Lowest 1 |
| 2 | L2₹71.6 L+₹1.4 L (1.95%)Rejected-Finance PLOT NO 713 INDI AREA PH LL CHANDIGARH | NA | NA | 160001 | ₹71.6 L+₹1.4 L (1.95%) | L2 | Rejected-Finance The rates quoted by the agency on higher side |
| 3 | L3₹72.2 L+₹2.0 L (2.84%)Rejected-Finance 105 B MOTIA CITI ZIRAKPUR 140603 | S A S NAGAR | PUNJAB | 140603 | ₹72.2 L+₹2.0 L (2.84%) | L3 | Rejected-Finance The rates quoted by the agency on higher side |
| 4 | L4₹74.0 L+₹3.8 L (5.35%)Rejected-Finance CHANDIGARH | ₹74.0 L+₹3.8 L (5.35%) | L4 | Rejected-Finance The rates quoted by the agency on higher side |
| 5 | L5₹75.1 L+₹4.9 L (6.93%)Rejected-Finance 1296 SECTOR 41 B CHANDIGARH 160036 | CHANDIGARH | CHANDIGARH | 160036 | ₹75.1 L+₹4.9 L (6.93%) | L5 | Rejected-Finance The rates quoted by the agency on higher side |
Tender Value
₹1.0 Cr
EMD Value
₹2.1 L
Closing Date
28 Apr 2026, 2:00 pmClosed
E.E.C.P.-1
Executive Engineer, C.P. Division No.1, 4th Floor, Deluxe Building Sec 9, Chandigarh
PROVISION AND FIXING THE HEAT RESISTANT TILES ON ALL HOSTELS ROOFS AT POST GRADUATE GOVT. COLLEGE FOR GIRLS, SECTOR 11, CHANDIGARH
2026_CHD_91844_1
CP1/2026/2392768
Open Tender
Civil Works - Buildings
Percentage
120 days
Chandigarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2.1 L
22 Jun 2026
21 Apr 2026
28 Apr 2026
21 Apr 2026
28 Apr 2026
21 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Providing and fixing Heat Resistant Terrace Tiles (300 mm x 300 mm x 20 mm) with SRI (solar refractive index) > 78, solar reflection > 0.70 and initial emittance> 0.75 on waterproof and sloped surface of terrace, laid on 20 mm thick cement sand mortar in the ratio of 1 :4 (1 cement : 4 coarse sand) and grouting the joints with mix of white cement & marble powder in ratio of 1 :1, including rubbing and polishing of the surface upto 3 cuts complete, including providing skirting upto 150 mm height along the parapet walls in the same manner. (DSR 12.55) | - | Sqm. | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.89 MB
BOQ_112368.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .