| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.3 LAccepted-AOC | ₹12.3 L | L1 | Accepted-AOC Agreement With L1 |
| 2 | L2₹13.2 LRejected-Finance | ₹13.2 L | L2 | Rejected-Finance Agreement With L1 |
| 3 | L3₹13.5 LRejected-Finance | ₹13.5 L | L3 | Rejected-Finance Agreement With L1 |
| 4 | L4₹13.6 LRejected-Finance M 287 MAWANA ROAD GANGA NAGAR MEERUT | ₹13.6 L | L4 | Rejected-Finance Agreement With L1 |
| 5 | Rejected-Technical | - | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | NARENDRA CONTRACTORS L4 | M/S A.N. ENTERPRISES L3 | M/S YOGESH ENTERPRISES L2 | M/S SHREE JI CONTRACTOR L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling reinforced cement concrete including stacking of material, labour, T&P etc. complete. | 2.05 | CuM | 633 ₹1,297.65 | 633 ₹1,297.65 | 610.84 ₹1,252.22 | 514 ₹1,053.70 |
| 2.00 | Dismantling brick work or stone work and cement concrete incement mortar & including stacking of materialas material, labour, T&P etc. complete. | 6.76 | CuM | 518 ₹3,501.68 | 518 ₹3,501.68 | 499.87 ₹3,379.12 | 514 ₹3,474.64 |
| 3.00 | Earth work in foundation in all types of soil including all lift and all lead and including filling, watering and ramming excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge. | 54.13 | CuM | 67 ₹3,626.71 | 67 ₹3,626.71 | 64.65 ₹3,499.50 | 61 ₹3,301.93 |
| 4.00 | Providing & laying C.C. 1:2:4(M-15) with cement, coarse sand & aggregate (25mm to 10mm) i/c all cost of material, labour T&P etc complete (Per CuM.) | 21.12 | CuM | 5,544.95 ₹1.2 L | 5,544.95 ₹1.2 L | 5,393.91 ₹1.1 L | 4,800 ₹1.0 L |
| 5.00 | Providing & laying R.C.C. 1:1:2 (M-25) with cement, coarse sand & aggregate (25mm to 10mm) and also excluding centering and shuttering and reinforcement i/c all cost of material, labour T&P etc complete (Per CuM.) | 49.04 | CuM | 7,786.8 ₹3.8 L | 7,786.8 ₹3.8 L | 7,553.77 ₹3.7 L | 7,300 ₹3.6 L |
| 6.00 | Providing & laying 1st class (M-150) brick work with 1:4 cement mortar using cement and coarse snad including cost of all material, T&P & labours complete (Per CuM.) | 42.94 | CuM | 5,506.85 ₹2.4 L | 5,506.85 ₹2.4 L | 5,314.11 ₹2.3 L | 5,100 ₹2.2 L |
| 7.00 | Providing Cement pointing (Struck Deep) on brick masonary in 1:2 Cement Mortar including cost of all material, T&P & labours complete( per SqM.) | 53.81 | SqM | 134.65 ₹7,245.52 | 134.65 ₹7,245.52 | 129.93 ₹6,991.53 | 145 ₹7,802.45 |
| 8.00 | Centering and shuttering for RCC/RB work including cost of centering & shuttering up to 3.0m height. including cost of all material, T&P & labours complete( per SqM.) | 86.97 | SqM | 805 ₹70,010.85 | 805 ₹70,010.85 | 776.82 ₹67,560.04 | 650 ₹56,530.50 |
| 9.00 | Supplying & Laying TMT Steel bar Reinforcement (Fe 550D) including removing of rust, cutting, binding with 24BWG wire, bending, placing with proper overlapping providing chair i/c all cost of material, labour, T&P etc. complete (per M.T.) | 3.55 | M.T | 71,600 ₹2.5 L | 71,600 ₹2.5 L | 69,094 ₹2.5 L | 66,000 ₹2.3 L |
| 10.00 | Providing and fixing P.V.C. pipe 100mm dia & 6Kg./cm Sq. I.S.I. Mark i/c all cost of material, labour, T&P etc. complete | 2.4 | R.M | 280 ₹672 | 280 ₹672 | 270.2 ₹648.48 | 279 ₹669.60 |
Tender Value
₹13.6 L
EMD Value
₹27,240
Closing Date
3 Sept 2025, 5:00 pmClosed
Executive Engineer
EE ABDGC MEERUT NEAR MAWANA BUS STAND MEERUT
TN-01/EE/2025-26 Reconstruction work of damaged bridge (box culvert) located at Km 7.802 of Minor Akbarpur.Lot No-37
2025_UPIDC_1068448_37
TN-01/EE/2025-26
Open Tender
Civil Works
90 days
As Per Tender Document
As Per Tender Document
2 documents required · 2 mandatory
₹944
₹27,240
EE ABDGC MEERUT NEAR MAWANA BUS STAND MEERUT
5 Feb 2026
26 Aug 2025
4 Sept 2025
26 Aug 2025
3 Sept 2025
26 Aug 2025
27 Aug 2025
Amount
Dismantling reinforced cement concrete including stacking of material, labour, T&P etc. complete.
Dismantling brick work or stone work and cement concrete incement mortar & including stacking of materialas material, labour, T&P etc. complete.
Earth work in foundation in all types of soil including all lift and all lead and including filling, watering and ramming excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge.
Providing & laying C.C. 1:2:4(M-15) with cement, coarse sand & aggregate (25mm to 10mm) i/c all cost of material, labour T&P etc complete (Per CuM.)
Providing & laying R.C.C. 1:1:2 (M-25) with cement, coarse sand & aggregate (25mm to 10mm) and also excluding centering and shuttering and reinforcement i/c all cost of material, labour T&P etc complete (Per CuM.)
Providing & laying 1st class (M-150) brick work with 1:4 cement mortar using cement and coarse snad including cost of all material, T&P & labours complete (Per CuM.)
Providing Cement pointing (Struck Deep) on brick masonary in 1:2 Cement Mortar including cost of all material, T&P & labours complete( per SqM.)
Centering and shuttering for RCC/RB work including cost of centering & shuttering up to 3.0m height. including cost of all material, T&P & labours complete( per SqM.)
Supplying & Laying TMT Steel bar Reinforcement (Fe 550D) including removing of rust, cutting, binding with 24BWG wire, bending, placing with proper overlapping providing chair i/c all cost of material, labour, T&P etc. complete (per M.T.)
Providing and fixing P.V.C. pipe 100mm dia & 6Kg./cm Sq. I.S.I. Mark i/c all cost of material, labour, T&P etc. complete
Providing and laying Thermacol sheet in expention joint including i/c all cost of material, labour, T&P etc. complete
Earth work for filling in approch road & strengthening of banks including all lift and all lead with rammimg & dressing, proper i/c all cost of material, labour, T&P etc. complete
Earthwork in removing Diversion/Bandha including all lift and all lead with ramming & dressing,proper i/c all cost of material, labour, T&P etc. complete
Providing and fixing of (30x90 cm left/right Object Hazard) retro-reflectorised cautionary, mandatory and informatory sign i/c all cost of material, labour, T&P etc. complete.
Distempering Two coat with oil bound distemper of approved brand and manufacture and of required shade on undercoated wall surface to give an even shade over an including a priming coat cement primer of approved brand and manufacture such as Berger, J&N, Shalimar, Asian Paints after thoroughly brushing the surface free from mortar dropping and other foreign matters and also including preparing the surface even with plaster of paris or approved synthetic material and sand papered smoothi/c all cost of material, labour, T&P etc. complete.
Painting letters including cost of material for writing chainage on V.R.B. i/c all cost of material, labour, T&P etc. complete.
M/S YOGESH ENTERPRISES (BID ID -5506843)
M/S A.N. ENTERPRISES (BID ID -5513337)
NARENDRA CONTRACTORS (BID ID -5513313)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid