| Sl No | Description | Qty | Unit | S.PALRAJ L2 | karthik s L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for foundation in all soils and sub soils except in hard rock requiring blasting and depositing on bank with initial lead of 10m and initial lift of 2m inclusive of shoring, shuttering, bailing out water wherever necessary, refilling the foundation with excavated earth other than sandy soil in layers of not more than 150mm thick layers well rammed and depositing the surplus earth within the compound in place shown by the departmental officers and clearing and levelling the site etc,. complete. | 8 | 1 M³ | 117 ₹936 | 112 ₹896 Lowest |
| 2.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers - Mixing by mechanical means | 5 | 1 M³ | 5,597 ₹27,985 | 5,375 ₹26,875 Lowest |
| 3.00 | R.R.Masonry in Cement mortar 1:5 for Foundation and Basement (New stone) including simultaneously pointing above ground level with the same mortar, Cost of Mortar Plasticizer used etc.,complete complying with standard specification and as directed by the Departmental Officers. | 6 | 1 M³ | 6,171 ₹37,026 | 5,926 ₹35,556 Lowest |
| 4.00 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 19 | 1 M³ | 651 ₹12,369 | 625 ₹11,875 Lowest |
| 5.00 | Brick work In CM 1:5 mix using best Second Class Table Moulded Chamber Burnt Bricks 9"x4½"x3" having 350 kg/cm² compressive strength and 15% or less water absorbent in the period of 24hours immersement and confirming to ISI specifications including finishing, curing etc., complete complying with standard specification. | 8 | 1 M³ | 7,706 ₹61,648 | 7,401 ₹59,208 Lowest |
| 6.00 | Supplying and erecting centering including necessary supports for the plane surfaces such as RCC Column Footing, Plinth Beam, & Sill Beam etc., using mild steel sheets of size 90cm x 60cm and BG 10 stiffened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding supported by casurina props of 10cm to 13cm dia spaced at suitable intervals etc., complete complying with standard specification. | 5 | 1 M² | 543 ₹2,715 | 521 ₹2,605 Lowest |
| 7.00 | Supplying and erecting centering for plane surfaces such as RCC Floor/Roof Beam, Lintels, Cantilever Beams, Bed Blocks etc., with necessary supports and strutting above 3.60m upto 4.90m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over Steel adjustable Span of Size 2m x 2m (expandable upto 3.60m) and Silver Oak Joists of Size 10 x 5 cm spaced at 50cm to 60cm c/c and supported by Steel Adjustable Telescopic Props of Size 2.40 x 3.0m (expandable upto 4.90m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) Spaced at not more than 50 to 60cm c/c and with Cross bracings provided at two levels at a spacing of 1.80m etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 6 | 1 M² | 1,129 ₹6,774 | 1,084 ₹6,504 Lowest |
| 8.00 | Supplying, fabricating and placing in position of Steel Reinforcement using Mild Steel or Ribbed Tor steel bars for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete complying with standard specification. | 2 | 1 Qtl | 9,779 ₹19,558 | 9,392 ₹18,784 Lowest |
| 9.00 | Reinforced cement concrete 1:1½:3 [one cement, one and half M-Sand and three course aggregates] using 20mm size Hard Broken/Machine crushed Granite Stone Jelly for all RCC items of works excluding centering, shuttering and cost of reinforcement, including curing, fixing fan clamp and fixtures if necessary etc., complete complying with standard specification. By Machine Mix | 2 | 1 M³ | 9,234 ₹18,468 | 8,868 ₹17,736 Lowest |
| 10.00 | Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three Plastering Sand) 10mm thick including mortar plasticizer at 200ml per 50Kg of cement used , hacking the surfaces and curing, etc., in all floors complying with standard specification and as directed by the departmental officers | 6 | 1 M² | 348 ₹2,088 | 334 ₹2,004 Lowest |
Tender Value
₹6.8 L
EMD Value
₹13,500
Closing Date
24 Feb 2026, 3:00 pmClosed
Commissioner
Tiruppur City Municipal Corporation Office, Tiruppur
Providing Basic Amenites to Sanitary Workers For Sanitary Meal Scheme Ward No. 28,29.
2026_MAWS_659738_5
E1 / 3434 / 2025 / Z4
Open Tender
Civil Works
Works
90 days
Tiruppur City Municipal Corporation, Main Office
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹13,500
24 Jul 2026
17 Feb 2026
24 Feb 2026
17 Feb 2026
24 Feb 2026
17 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation for foundation in all soils and sub soils except in hard rock requiring blasting and depositing on bank with initial lead of 10m and initial lift of 2m inclusive of shoring, shuttering, bailing out water wherever necessary, refilling the foundation with excavated earth other than sandy soil in layers of not more than 150mm thick layers well rammed and depositing the surplus earth within the compound in place shown by the departmental officers and clearing and levelling the site etc,. complete. | 8 | 1 M³ | - | - |
| 2 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers - Mixing by mechanical means | 5 | 1 M³ | - | - |
| 3 | R.R.Masonry in Cement mortar 1:5 for Foundation and Basement (New stone) including simultaneously pointing above ground level with the same mortar, Cost of Mortar Plasticizer used etc.,complete complying with standard specification and as directed by the Departmental Officers. | 6 | 1 M³ | - | - |
| 4 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 19 | 1 M³ | - | - |
| 5 | Brick work In CM 1:5 mix using best Second Class Table Moulded Chamber Burnt Bricks 9"x4½"x3" having 350 kg/cm² compressive strength and 15% or less water absorbent in the period of 24hours immersement and confirming to ISI specifications including finishing, curing etc., complete complying with standard specification. | 8 | 1 M³ | - | - |
| 6 | Supplying and erecting centering including necessary supports for the plane surfaces such as RCC Column Footing, Plinth Beam, & Sill Beam etc., using mild steel sheets of size 90cm x 60cm and BG 10 stiffened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding supported by casurina props of 10cm to 13cm dia spaced at suitable intervals etc., complete complying with standard specification. | 5 | 1 M² | - | - |
| 7 | Supplying and erecting centering for plane surfaces such as RCC Floor/Roof Beam, Lintels, Cantilever Beams, Bed Blocks etc., with necessary supports and strutting above 3.60m upto 4.90m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over Steel adjustable Span of Size 2m x 2m (expandable upto 3.60m) and Silver Oak Joists of Size 10 x 5 cm spaced at 50cm to 60cm c/c and supported by Steel Adjustable Telescopic Props of Size 2.40 x 3.0m (expandable upto 4.90m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) Spaced at not more than 50 to 60cm c/c and with Cross bracings provided at two levels at a spacing of 1.80m etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 6 | 1 M² | - | - |
| 8 | Supplying, fabricating and placing in position of Steel Reinforcement using Mild Steel or Ribbed Tor steel bars for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete complying with standard specification. | 2 | 1 Qtl | - | - |
| 9 | Reinforced cement concrete 1:1½:3 [one cement, one and half M-Sand and three course aggregates] using 20mm size Hard Broken/Machine crushed Granite Stone Jelly for all RCC items of works excluding centering, shuttering and cost of reinforcement, including curing, fixing fan clamp and fixtures if necessary etc., complete complying with standard specification. By Machine Mix | 2 | 1 M³ | - | - |
| 10 | Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three Plastering Sand) 10mm thick including mortar plasticizer at 200ml per 50Kg of cement used , hacking the surfaces and curing, etc., in all floors complying with standard specification and as directed by the departmental officers | 6 | 1 M² | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.57 MB
5_Conditions.pdf
Tender Documents • 0.86 MB
BOQ_791652.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].