| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹58,386Accepted-AOC A 4 SIDCO INDUSTRIAL ESTATE METTUR DAM 636402 | METTUR DAM | SALEM | TAMIL NADU | 636402 | 1 | Accepted-AOC L1 |
Tender Value
Refer Docs
Closing Date
31 Oct 2023, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM Inspection Overhauling and top up of resin in Strong Acid Cation Ion Exchanger II of Stage II DM Plant
2023_EB_379852_1
CE / MTPS-I / SE / M-I / BM / OT. 322 / 2023-24
Open Tender
Power/Energy Projects/Products
Works
15 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specification
4 documents required · 4 mandatory
₹0
Yes
17 Dec 2024
17 Oct 2023
1 Nov 2023
17 Oct 2023
31 Oct 2023
17 Oct 2023
Amount
Charges for manhole door opening, back washing, cleaning of internals by Air Scouring
Charges for removal of entire resins from ion exchanger tank manually, cleaning & checking the organic fouling and re filling of resins after completion of work
Charges for dismantling Inlet distribution Header & its bends and re - assembling the same, after completion of work
Charges for dismantling of MSRL Lateral Support Members, PVC Laterals & Middle collection Header, Cleaning & checking the healthiness of PP short strainer buttons & rubber grommet, renewing the above if necessary & assembling all the strainer buttons & rubber grommet and re - assembling Middle collection Header, PVC Laterals & MSRL Lateral Support Members., after completion of work
Charges for dismantling of bottom collecting deflector plate & out let pipe, Cleaning & checking the healthiness of PP Double Decker Strainer buttons & Resin Trap, renewing the Strainer buttons & Resin Trap if necessary, assembling all Strainer buttons & Resin Trap and then closing the bottom collecting deflector plate & out let pipe
Charges for Air Scouring, Acid Chocking & washing, open back washing & water draining. Measuring resin level after water draining, to top up resins for required level if necessary, and lifting the man hole dummy from ground and closing
Charges for removal of existing rubber lining
Coating of adhesive compound providing 8 hour gap between each coating before patching of natural rubber. (4 coating required)
Charges for rubber lining (Vulcanizing) by hot banding process and stream centering
Adhesive compound
T & Ps and consumables
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .