Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹80,000
Closing Date
20 Jul 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ADDITIONAL COLLECTOR (D) MADURAI
0/0 ADDITIONAL COLLECTOR (D) DRDA MADURAI
Providing Infrastructure facilities in Schools and construction of other public _ 13 nos. in AGAMT-II-2021-22 Village panchayats of T.Kallupatti Block in Madurai District in Package no. TKALL _04
2022_RDTN_238359_2
568/2022/D7 /tkal04/24.06.22
Open Tender
Civil Works
Item Rate
180 days
TKALLUPATTI
REFER TENDER DOCUMENT
4 documents required · 4 mandatory
₹0
₹80,000
1 Aug 2022
5 Jul 2022
20 Jul 2022
5 Jul 2022
20 Jul 2022
6 Jul 2022
Amount
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Supplying andSand filling with M.Sand inculding all cost and conveyance etc complete
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete complying with standard specification.
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Cement Concrete 1:2:4 mix Using 20 mm Iss HBG Metal Inculding all charges etc complete
Cost and supplyof steel door of size 0.90 x 2.10 m including cost and all labour charges etc complete
Cost and supply of Steel windows with two shutters of various sizes including cost conveyance and all albour charges etc complete.
Cost and supply of Steel ventilator with rat proof mesh with hung of various sizes including cost conveyance and all albour charges etc complete.
Cost and supply of Rcc Jolly in proper position including all maetials and all labour charges
Ceilling plastering with CM 1:3 mix using 10mm thick including cost, conveyance and all labour charges etc., completed
Plastering with CM 1:5 mix, 12mm thick including cost, conveyance and all labour charges etc., completed.
Gronolithick floor finish floor finish using metal chips including cost and coneyance and all labour charges
Paving with Ceramic tiles using 20x20x2 cm including cost andconveyance and all labour charges etc complete
Finishing with pressed tiles of size 20x20x2 cm and pointing with cm 1:3 mix using water proof powder including cost and conveyance of all materials and all labour charges etc.,
Distembering with two coats over primer coat using best shell lime including cost and conveyance of all materials and all labour charges etc complete
Painting two coats with ready mixed Plastic emulsion of first class quality paint and of approved colour over a priming coat inculding through scrapping, clean removal of dirt etc
Painting two coats over new Iron work including cost, conveyance and all labour charges etc, complete
Providing for Chullah and Chimney arrangements
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Filling the basement With Excavated earth filling inculding all cost and conveyance etc complete
Supplying andSand filling with M.Sand inculding all cost and conveyance etc complete
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete complying with standard specification.
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Fabrication of and supply of Mild steel door (0.75x1.80)
Towards the labour charges for Fixing in Position of steel Doors
Plastering with CM 1:5 mix, 12mm thick including cost, conveyance and all labour charges etc., completed.
Ceilling plastering with CM 1:3 mix using 10mm thick including cost, conveyance and all labour charges etc., completed
Paving with Ceramic tiles using 20x20x2 cm including cost andconveyance and all labour charges etc complete
Dadoing using 200x300 any colour glazed tiles fixed over 12 mm thick cement plaster cm 1:2 inculding all charges etc completeincluding cost and coneyance and all labour charges
Painting two coats with ready mixed Plastic emulsion of first class quality paint and of approved colour over a priming coat inculding through scrapping, clean removal of dirt etc
Painting two coats over new Iron work including cost, conveyance and all labour charges etc, complete
Paving the flooring with step tiles in cm 1:3 20 mm thick inculding all coast and conveyance etc complete
Towards the cost and supply of EWC with rest and P trap EWC with 10 lit tank inculding all charges etc complete
Towards the cost and supply of IWC with rest and P trap IWC with 10 lit tank inculding all charges etc complete
Incinetaor for ladies Toilet Bath Room
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Filling the basement With Excavated earth filling inculding all cost and conveyance etc complete
Supplying andSand filling with M.Sand inculding all cost and conveyance etc complete
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete complying with standard specification.
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Fabrication of and supply of Mild steel door (0.75x1.80)
Towards the labour charges for Fixing in Position of steel Doors
Plastering with CM 1:5 mix, 12mm thick including cost, conveyance and all labour charges etc., completed.
Ceilling plastering with CM 1:3 mix using 10mm thick including cost, conveyance and all labour charges etc., completed
Paving with Ceramic tiles using 20x20x2 cm including cost andconveyance and all labour charges etc complete
Dadoing using 200x300 any colour glazed tiles fixed over 12 mm thick cement plaster cm 1:2 inculding all charges etc completeincluding cost and coneyance and all labour charges
Painting two coats with ready mixed Plastic emulsion of first class quality paint and of approved colour over a priming coat inculding through scrapping, clean removal of dirt etc
Painting two coats over new Iron work including cost, conveyance and all labour charges etc, complete
Paving the flooring with step tiles in cm 1:3 20 mm thick inculding all coast and conveyance etc complete
Towards the cost and supply of EWC with rest and P trap EWC with 10 lit tank inculding all charges etc complete
Towards the cost and supply of IWC with rest and P trap IWC with 10 lit tank inculding all charges etc complete
Incinetaor for ladies Toilet Bath Room
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Filling the basement With Excavated earth filling inculding all cost and conveyance etc complete
Supplying andSand filling with M.Sand inculding all cost and conveyance etc complete
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete complying with standard specification.
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Fabrication of and supply of Mild steel door (0.75x1.80)
Towards the labour charges for Fixing in Position of steel Doors
Plastering with CM 1:5 mix, 12mm thick including cost, conveyance and all labour charges etc., completed.
Ceilling plastering with CM 1:3 mix using 10mm thick including cost, conveyance and all labour charges etc., completed
Paving with Ceramic tiles using 20x20x2 cm including cost andconveyance and all labour charges etc complete
Dadoing using 200x300 any colour glazed tiles fixed over 12 mm thick cement plaster cm 1:2 inculding all charges etc completeincluding cost and coneyance and all labour charges
Painting two coats with ready mixed Plastic emulsion of first class quality paint and of approved colour over a priming coat inculding through scrapping, clean removal of dirt etc
Painting two coats over new Iron work including cost, conveyance and all labour charges etc, complete
GronolithicFlooring 25 mm thickusing 10-12 mm Size Chips Inculding cost and convetance etc complete
Towards the cost and supply of EWC with rest and P trap EWC with 10 lit tank inculding all charges etc complete
Towards the cost and supply of IWC with rest and P trap IWC with 10 lit tank inculding all charges etc complete
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Filling the basement With Excavated earth filling inculding all cost and conveyance etc complete
Supplying andSand filling with M.Sand inculding all cost and conveyance etc complete
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete complying with standard specification.
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Fabrication of and supply of Mild steel door (0.75x1.80)
Towards the labour charges for Fixing in Position of steel Doors
Plastering with CM 1:5 mix, 12mm thick including cost, conveyance and all labour charges etc., completed.
Ceilling plastering with CM 1:3 mix using 10mm thick including cost, conveyance and all labour charges etc., completed
Paving with Ceramic tiles using 20x20x2 cm including cost andconveyance and all labour charges etc complete
Dadoing using 200x300 any colour glazed tiles fixed over 12 mm thick cement plaster cm 1:2 inculding all charges etc completeincluding cost and coneyance and all labour charges
Painting two coats with ready mixed Plastic emulsion of first class quality paint and of approved colour over a priming coat inculding through scrapping, clean removal of dirt etc
Painting two coats over new Iron work including cost, conveyance and all labour charges etc, complete
GronolithicFlooring 25 mm thickusing 10-12 mm Size Chips Inculding cost and convetance etc complete
Towards the cost and supply of EWC with rest and P trap EWC with 10 lit tank inculding all charges etc complete
Towards the cost and supply of IWC with rest and P trap IWC with 10 lit tank inculding all charges etc complete
Earthwork excavation in all classes of siol with initial load and lift as per SS20B for foundation
Supplying and filling of conveyed earth with a lead of 5Km for basement filling complying to standard specification.
Filling with M. sand including cost and conveyance of all materials to site for foundation and flooring.
Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site for foundation and flooring.
Centring charges including strutting including cost and convyance of casurina props and wood for planks for all RCC items
Supplying, fabricating and placing in position mild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rod
R.C.C. 1:1.5 :3 using 20mm HBG metal including cost and conveyance of all materials to site for Plinth Beam.
Brickwork in CM 1:5 using country bricks of size 8 3/4" x 1/4" x 2 3/4" including cost of conveyance of all materials to site for superstructure
Granaolithic floor finish of 25 mm thick in PCC 1:2:4 using 10-12 mmHBGS Jelly inculding curing ete.complete.,
Weathering coarse with brickjelly concrete using 20mm size using slaked lime 32:12.5 ratio including cost and convyance etc complete
Finishing the top of roof with one coarse pressed tiles 23x23x2cm size laid in CM 1:3 12 mm thick and pointing with 1:3 mix using water proof compound including all labour charges etc
Special ceiling Plastering with cm CM 1:3 10 mm thick including cost and conveyance and all labour charges etc complete
Cost and Supply of New Steel Door of Size (0.75 x 1.80)
Cost and Supply of New Steel Door 1 of Size (1.10 x 2.10 )
Cost and Supply of New Rcc Jolly 1 of Size ( 0.60 x 0.45 )
Labour charges for fixing of Steel Door's Charges
Labour charges for fixing of Steel Door's Charges
Labour charges for fixing of RCC Jolly Charges
Paving the flooring with special type of flooring tiles (Cement based Hydraulically pressed Anti skid tiles (20mm thick) in CM 1:3, 20mm thick
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 K
Plastering with cm 1:5 12 mm thick including cost and conveyance and all labour charges etc complete
Painting two coats with oil bound Distember over one coat of Primier (using White Cement as primer ) in all floors including brushes etc ., complete etc
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putt
Painting with enamel synthetic paint in new iron works including cost and conveyance and all labour charges etc complete
Supplying & Fixing of Wash Hand Basin of size 550x400mm of approved quality (with out pedastal)
Supplying & Fixing in position of Indian type Water closet 580x440mm of approved quality
Supplying & Fixing in position of European type Water closet 580x440mm of approved quality
Supply delivery of HDPE Water tank of 500 liters capacity with I st Mark.
Incinerator for Ladies Bathroom (For School Works) Page no-72 SI No 292
Earthwork excavation in all classes of siol with initial load and lift as per SS20B for foundation
Supplying and filling of conveyed earth with a lead of 5Km for basement filling complying to standard specification.
Filling with M. sand including cost and conveyance of all materials to site for foundation and flooring.
Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site for foundation and flooring.
Centring charges including strutting including cost and convyance of casurina props and wood for planks for all RCC items
Supplying, fabricating and placing in position mild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rod
R.C.C. 1:1.5 :3 using 20mm HBG metal including cost and conveyance of all materials to site for Plinth Beam.
Brickwork in CM 1:5 using country bricks of size 8 3/4" x 1/4" x 2 3/4" including cost of conveyance of all materials to site for superstructure
Granaolithic floor finish of 25 mm thick in PCC 1:2:4 using 10-12 mmHBGS Jelly inculding curing ete.complete.,
Weathering coarse with brickjelly concrete using 20mm size using slaked lime 32:12.5 ratio including cost and convyance etc complete
Finishing the top of roof with one coarse pressed tiles 23x23x2cm size laid in CM 1:3 12 mm thick and pointing with 1:3 mix using water proof compound including all labour charges etc
Special ceiling Plastering with cm CM 1:3 10 mm thick including cost and conveyance and all labour charges etc complete
Cost and Supply of New Steel Door of Size (0.75 x 1.80)
Cost and Supply of New Steel Door 1 of Size (1.10 x 2.10 )
Cost and Supply of New Rcc Jolly 1 of Size ( 0.60 x 0.45 )
Labour charges for fixing of Steel Door's Charges
Labour charges for fixing of Steel Door's Charges
Labour charges for fixing of RCC Jolly Charges
Paving the flooring with special type of flooring tiles (Cement based Hydraulically pressed Anti skid tiles (20mm thick) in CM 1:3, 20mm thick
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 K
Plastering with cm 1:5 12 mm thick including cost and conveyance and all labour charges etc complete
Painting two coats with oil bound Distember over one coat of Primier (using White Cement as primer ) in all floors including brushes etc ., complete etc
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putt
Painting with enamel synthetic paint in new iron works including cost and conveyance and all labour charges etc complete
Supplying & Fixing of Wash Hand Basin of size 550x400mm of approved quality (with out pedastal)
Supplying & Fixing in position of Indian type Water closet 580x440mm of approved quality
Supplying & Fixing in position of European type Water closet 580x440mm of approved quality
Supply delivery of HDPE Water tank of 500 liters capacity with I st Mark.
Earthwork excavation in all classes of siol with initial load and lift as per SS20B for foundation
Supplying and filling of conveyed earth with a lead of 5Km for basement filling complying to standard specification.
Filling with M. sand including cost and conveyance of all materials to site for foundation and flooring.
Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site for foundation and flooring.
Centring charges including strutting including cost and convyance of casurina props and wood for planks for all RCC items
Supplying, fabricating and placing in position mild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rod
R.C.C. 1:1.5 :3 using 20mm HBG metal including cost and conveyance of all materials to site for Plinth Beam.
Brickwork in CM 1:5 using country bricks of size 8 3/4" x 1/4" x 2 3/4" including cost of conveyance of all materials to site for superstructure
Granaolithic floor finish of 25 mm thick in PCC 1:2:4 using 10-12 mmHBGS Jelly inculding curing ete.complete.,
Weathering coarse with brickjelly concrete using 20mm size using slaked lime 32:12.5 ratio including cost and convyance etc complete
Finishing the top of roof with one coarse pressed tiles 23x23x2cm size laid in CM 1:3 12 mm thick and pointing with 1:3 mix using water proof compound including all labour charges etc
Special ceiling Plastering with cm CM 1:3 10 mm thick including cost and conveyance and all labour charges etc complete
Cost and Supply of New Steel Door of Size (0.75 x 1.80)
Cost and Supply of New Steel Door 1 of Size (1.10 x 2.10 )
Cost and Supply of New Rcc Jolly 1 of Size ( 0.60 x 0.45 )
Labour charges for fixing of Steel Door's Charges
Labour charges for fixing of Steel Door's Charges
Labour charges for fixing of RCC Jolly Charges
Paving the flooring with special type of flooring tiles (Cement based Hydraulically pressed Anti skid tiles (20mm thick) in CM 1:3, 20mm thick
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 K
Plastering with cm 1:5 12 mm thick including cost and conveyance and all labour charges etc complete
Painting two coats with oil bound Distember over one coat of Primier (using White Cement as primer ) in all floors including brushes etc ., complete etc
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putt
Painting with enamel synthetic paint in new iron works including cost and conveyance and all labour charges etc complete
Supplying & Fixing of Wash Hand Basin of size 550x400mm of approved quality (with out pedastal)
Supplying & Fixing in position of Indian type Water closet 580x440mm of approved quality
Supplying & Fixing in position of European type Water closet 580x440mm of approved quality
Supply delivery of HDPE Water tank of 500 liters capacity with I st Mark.
Earthwork excavation in all classes of siol with initial load and lift as per SS20B for foundation
Supplying and filling of conveyed earth with a lead of 5Km for basement filling complying to standard specification.
Filling with M. sand including cost and conveyance of all materials to site for foundation and flooring.
Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site for foundation and flooring.
Centring charges including strutting including cost and convyance of casurina props and wood for planks for all RCC items
Supplying, fabricating and placing in position mild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rod
R.C.C. 1:1.5 :3 using 20mm HBG metal including cost and conveyance of all materials to site for Plinth Beam.
Brickwork in CM 1:5 using country bricks of size 8 3/4" x 1/4" x 2 3/4" including cost of conveyance of all materials to site for superstructure
Granaolithic floor finish of 25 mm thick in PCC 1:2:4 using 10-12 mmHBGS Jelly inculding curing ete.complete.,
Weathering coarse with brickjelly concrete using 20mm size using slaked lime 32:12.5 ratio including cost and convyance etc complete
Finishing the top of roof with one coarse pressed tiles 23x23x2cm size laid in CM 1:3 12 mm thick and pointing with 1:3 mix using water proof compound including all labour charges etc
Special ceiling Plastering with cm CM 1:3 10 mm thick including cost and conveyance and all labour charges etc complete
Cost and Supply of New Steel Door of Size (0.75 x 1.80)
Cost and Supply of New Steel Door 1 of Size (1.10 x 2.10 )
Cost and Supply of New Rcc Jolly 1 of Size ( 0.60 x 0.45 )
Labour charges for fixing of Steel Door's Charges
Labour charges for fixing of Steel Door's Charges
Labour charges for fixing of RCC Jolly Charges
Paving the flooring with special type of flooring tiles (Cement based Hydraulically pressed Anti skid tiles (20mm thick) in CM 1:3, 20mm thick
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 K
Plastering with cm 1:5 12 mm thick including cost and conveyance and all labour charges etc complete
Painting two coats with oil bound Distember over one coat of Primier (using White Cement as primer ) in all floors including brushes etc ., complete etc
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putt
Painting with enamel synthetic paint in new iron works including cost and conveyance and all labour charges etc complete
Supplying & Fixing of Wash Hand Basin of size 550x400mm of approved quality (with out pedastal)
Supplying & Fixing in position of Indian type Water closet 580x440mm of approved quality
Supplying & Fixing in position of European type Water closet 580x440mm of approved quality
Supply delivery of HDPE Water tank of 500 liters capacity with I st Mark.
Earthwork excavation in all classes of siol with initial load and lift as per SS20B for foundation
Supplying and filling of conveyed earth with a lead of 5Km for basement filling complying to standard specification.
Filling with M. sand including cost and conveyance of all materials to site for foundation and flooring.
Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site for foundation and flooring.
Centring charges including strutting including cost and convyance of casurina props and wood for planks for all RCC items
Supplying, fabricating and placing in position mild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rod
R.C.C. 1:1.5 :3 using 20mm HBG metal including cost and conveyance of all materials to site for Plinth Beam.
Brickwork in CM 1:5 using country bricks of size 8 3/4" x 1/4" x 2 3/4" including cost of conveyance of all materials to site for superstructure
Granaolithic floor finish of 25 mm thick in PCC 1:2:4 using 10-12 mmHBGS Jelly inculding curing ete.complete.,
Weathering coarse with brickjelly concrete using 20mm size using slaked lime 32:12.5 ratio including cost and convyance etc complete
Finishing the top of roof with one coarse pressed tiles 23x23x2cm size laid in CM 1:3 12 mm thick and pointing with 1:3 mix using water proof compound including all labour charges etc
Special ceiling Plastering with cm CM 1:3 10 mm thick including cost and conveyance and all labour charges etc complete
Cost and Supply of New Steel Door of Size (0.75 x 1.80)
Cost and Supply of New Steel Door 1 of Size (1.10 x 2.10 )
Cost and Supply of New Rcc Jolly 1 of Size ( 0.60 x 0.45 )
Labour charges for fixing of Steel Door's Charges
Labour charges for fixing of Steel Door's Charges
Labour charges for fixing of RCC Jolly Charges
Paving the flooring with special type of flooring tiles (Cement based Hydraulically pressed Anti skid tiles (20mm thick) in CM 1:3, 20mm thick
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 K
Plastering with cm 1:5 12 mm thick including cost and conveyance and all labour charges etc complete
Painting two coats with oil bound Distember over one coat of Primier (using White Cement as primer ) in all floors including brushes etc ., complete etc
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putt
Painting with enamel synthetic paint in new iron works including cost and conveyance and all labour charges etc complete
Supplying & Fixing of Wash Hand Basin of size 550x400mm of approved quality (with out pedastal)
Supplying & Fixing in position of Indian type Water closet 580x440mm of approved quality
Supplying & Fixing in position of European type Water closet 580x440mm of approved quality
Supply delivery of HDPE Water tank of 500 liters capacity with I st Mark.
Incinerator for Ladies Bathroom (For School Works) Page no-72 SI No 292
Earthwork excavation in all classes of siol with initial load and lift as per SS20B for foundation
Supplying and filling of conveyed earth with a lead of 5Km for basement filling complying to standard specification.
Filling with M. sand including cost and conveyance of all materials to site for foundation and flooring.
Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site for foundation and flooring.
Centring charges including strutting including cost and convyance of casurina props and wood for planks for all RCC items
Supplying, fabricating and placing in position mild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rod
R.C.C. 1:1.5 :3 using 20mm HBG metal including cost and conveyance of all materials to site for Plinth Beam.
Brickwork in CM 1:5 using country bricks of size 8 3/4" x 1/4" x 2 3/4" including cost of conveyance of all materials to site for superstructure
Granaolithic floor finish of 25 mm thick in PCC 1:2:4 using 10-12 mmHBGS Jelly inculding curing ete.complete.,
Weathering coarse with brickjelly concrete using 20mm size using slaked lime 32:12.5 ratio including cost and convyance etc complete
Finishing the top of roof with one coarse pressed tiles 23x23x2cm size laid in CM 1:3 12 mm thick and pointing with 1:3 mix using water proof compound including all labour charges etc
Special ceiling Plastering with cm CM 1:3 10 mm thick including cost and conveyance and all labour charges etc complete
Cost and Supply of New Steel Door of Size (0.75 x 1.80)
Cost and Supply of New Steel Door 1 of Size (1.10 x 2.10 )
Cost and Supply of New Rcc Jolly 1 of Size ( 0.60 x 0.45 )
Labour charges for fixing of Steel Door's Charges
Labour charges for fixing of Steel Door's Charges
Labour charges for fixing of RCC Jolly Charges
Paving the flooring with special type of flooring tiles (Cement based Hydraulically pressed Anti skid tiles (20mm thick) in CM 1:3, 20mm thick
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 K
Plastering with cm 1:5 12 mm thick including cost and conveyance and all labour charges etc complete
Painting two coats with oil bound Distember over one coat of Primier (using White Cement as primer ) in all floors including brushes etc ., complete etc
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putt
Painting with enamel synthetic paint in new iron works including cost and conveyance and all labour charges etc complete
Supplying & Fixing of Wash Hand Basin of size 550x400mm of approved quality (with out pedastal)
Supplying & Fixing in position of Indian type Water closet 580x440mm of approved quality
Supplying & Fixing in position of European type Water closet 580x440mm of approved quality
Supply delivery of HDPE Water tank of 500 liters capacity with I st Mark.
Incinerator for Ladies Bathroom (For School Works) Page no-72 SI No 292
Earth work excavation for foundation in all soils and sub soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Filling in well gravel with well rammed, watered and consolidated complying with standard specifications etc., complete.
Supplying and filling foundation and basement with filling M.sand layers not more than 15 cm thick, well rammed, watered and compacted complete complying with standard specification.
Cement concrete 1 : 4: 8 mix using 40 mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick compacting etc., complete complying with standard specifications and as directed.
Brick work in CM 1:5 mix using country bricks ground moulded of size 83/4"x41/4"x21/4" for the following including curing etc., complete complying with standard specifications. Rate for 10m3
Supplying and fabricating and placing in position MS steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standard specification.
Supplying and Erecting centering for sides and soffits including necessary supports and strutting upto 3.29m height for plane surface in all floors with all cross bracing using mild steel sheets of size 90x60cm and 10 gauge stiffened, welded with steel angle of size 25x25x3 mm for boarding laid over silver oak joists (Country wood) of size 10x6.5cm spaced @ about 90cm c/c and supported by casurina props of 10-13cm dia spaced @ 75cm c/c etc., complete complying with standard specifications
Column
Grade Beam
Above Basement
Reinforced Cement concrete 1:11/2:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Paving the floor with Kotta Green tiles of size 60cm X 60cm X 1.8 to 2 cm thick in Cement mortar 1:3 etc., complete complying with standard specifications and as directed by the departmental officers.
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum.
Paving the Floor with Vitrified tiles in CM 1:3 20mm thick etc complete
Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
Dadooing of walls with colour glazed tiles of size 300x200x6 mm of best quality including cost and conveyance of all materials to site and all labour charges etc complete.
Finishing the top of roof with one course of PRESSED TILES of size 20 cm X 20 cm X 2 cm laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight of cement including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete
Plastering with CM 1 : 5, 12mm thick over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Plastering with CM 1 : 3, 10mm thick over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Distembering two coats including cost and conveyance of all materials to site and all labour charges etc comoplete for 100 Sqm
Emulsion two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats over new iron works such as steel door, windows, ventilators, window bars, balustrades etc., with best approved colour over the existing priming coat etc., complete complying with standard specifications and as directed by the departmental officers.
Supply and Fixing of Cuddapah slab for Shelf including cost and conveyace of allmaterials to site complete
Rolling shutterD RS (2.10x2.40)m (5.04x2150=10836)
Rolling shutterD RS (1.80x2.40)m (4.32x2150=9288)
Door 1.00m x 2.10m
Door 0.90m x 2.10m
Window (1.00x1.30)m
Ventilator (0.90x0.60)m
Labour charges for fixing door etc., complete
Labour charges for fixing Windows and Ventilator etc., complete
Provision for Water Supply & Sanitary Arrangements etc complete
Earth work excavation for in all soils classification SS20B including refilling the trenches after PVC line laying etc complete
Refilling with excavated earth etc complete
63 mm PVC Pipe (4KSC)
25mm UPVC Pipe
20mm UPVC Pipe
25mm Tee
25mm Elbow
25mm Bend
25x20mm Reducer
20mm Tee
20mm Elbow
20mm Bend
20x15mm Reducer
110mm dia PVC Pipe
75mm dia PVC Pipe
110mm Tee
110mm Elbow
110mm Bend
75mm Tee
75mm Elbow
75mm Bend
IWC (S.NO 177 ii)
Wash basin (S.NO 184 iii)
15mm brass tap (S.NO 159)
100mm dia Stoneware pipe (S.NO 207 ii)
500 litre sintex
Provision for Electrical Arrangements etc complete
Wiring with 2x1.5 sqmm (22/0.3) PVC insulated SC unsheathed copper conductor cable of 1100V grade in suitable heavy gauge MS conduit pipe on wall and ceiling with MS accessories with switch box with 5A F.T. switch inflush with wall and covered with hylum sheet of 3mm thick with painting of suitable colour with continuous earth wire connection of 14 SWG TC wire for light point.
Wiring with 2x1.5 sqmm (22/0.3) PVC insulated SC unsheathed copper conductor cable of 1100V grade in suitable heavy gauge MS conduit pipe on wall and ceiling with MS accessories with switch box with 5A F.T. switch inflush with wall and covered with hylum sheet of 3mm thick with painting of suitable colour with continuous earth wire connection of 14 SWG TC wire for Fan point (For electronic Regulator)
Wiring with 2x1.5sqmm (22/0.3) PVC insulated SC unsheathed Cu.Conductor of 1100 V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories, in flush with wall, with 150mm x 100mm x 113mm TW switch box with 3 mm thick Hylem sheet cover for 5 A 3 pin non inter lockingWall socket with 5A Flush type switch with continuous earth wire connection of 14 SWG TC wire and making good of the concealed portion with suitable colour for concealed PVC plug point.
Supply and fixing of TNEB meter Board suitable for 32A Three Phase service connection with 3 Nos. 32A Fuse unit (500V) 32A neutral link and earth link (1" x 1/8" Copper flat) on TW plank of size 600mm x 450mm x 19mm with supporting TW reepers of 1" thick an either side with painting with suitable bolt and nuts for fixing the TW plank on wall with earth connection and inter connection with 7/20 PVC insulated copper wire from EB meter to fuse unit.
Supply and fixing of 1200mm sweep AC Ceiling fan complete with stepped electronic 300w regulator with 300mm down rod on the existing clamps (crompton make).
Supply and run of 4 x 6 sq.mm (84/0.3) PVC insulated SC unsheathed Cu.Conductor of 1100V on 7/20 GI bearer wire for service connection mains
Towards the cost of Provision for EB deposit including all cost & conveyance etc., complete.
Supply and fixing of WT bulk head fitting with guard (Philips / Bajaj / Crompton / K. Lite) suitable for11W CFL lamp with CFL
Supply and fixing of 32 Amps DP Switch of 500 V with metal clad with fuse and neutral (Side Handle) on suitable TW Board , with earth connection only
Supply and run of 4 x 6 sq.mm (84/0.3) PVC insulated SC unsheathed Cu.Conductor of 1100V grade in 32mm dia GI pipe (Class 'B') suitably bent at both ends with necessary angle iron up right and end supports for mains
Supply and fixing of single box type 4'40 W flu fitting complete with copper choke and condensor with TW round blocks on wall or ceiling with flu tube with PVC unsheathed Copper leads from terminals to the fitting.
Earth work excavation for foundation in all soils and sub soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Filling in well gravel with well rammed, watered and consolidated complying with standard specifications etc., complete.
Supplying and filling foundation and basement with filling M.sand layers not more than 15 cm thick, well rammed, watered and compacted complete complying with standard specification.
Cement concrete 1 : 4: 8 mix using 40 mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick compacting etc., complete complying with standard specifications and as directed.
Brick work in CM 1:5 mix using country bricks ground moulded of size 83/4"x41/4"x21/4" for the following including curing etc., complete complying with standard specifications. Rate for 10m3
Supplying and fabricating and placing in position MS steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standard specification.
Supplying and Erecting centering for sides and soffits including necessary supports and strutting upto 3.29m height for plane surface in all floors with all cross bracing using mild steel sheets of size 90x60cm and 10 gauge stiffened, welded with steel angle of size 25x25x3 mm for boarding laid over silver oak joists (Country wood) of size 10x6.5cm spaced @ about 90cm c/c and supported by casurina props of 10-13cm dia spaced @ 75cm c/c etc., complete complying with standard specifications
Column
Grade Beam
Above Basement
Reinforced Cement concrete 1:11/2:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Paving the floor with Kotta Green tiles of size 60cm X 60cm X 1.8 to 2 cm thick in Cement mortar 1:3 etc., complete complying with standard specifications and as directed by the departmental officers.
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum.
Paving the Floor with Vitrified tiles in CM 1:3 20mm thick etc complete
Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
Dadooing of walls with colour glazed tiles of size 300x200x6 mm of best quality including cost and conveyance of all materials to site and all labour charges etc complete.
Finishing the top of roof with one course of PRESSED TILES of size 20 cm X 20 cm X 2 cm laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight of cement including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete
Plastering with CM 1 : 5, 12mm thick over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Plastering with CM 1 : 3, 10mm thick over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Distembering two coats including cost and conveyance of all materials to site and all labour charges etc comoplete for 100 Sqm
Emulsion two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats over new iron works such as steel door, windows, ventilators, window bars, balustrades etc., with best approved colour over the existing priming coat etc., complete complying with standard specifications and as directed by the departmental officers.
Supply and Fixing of Cuddapah slab for Shelf including cost and conveyace of allmaterials to site complete
Rolling shutterD RS (2.10x2.40)m (5.04x2150=10836)
Rolling shutterD RS (1.80x2.40)m (4.32x2150=9288)
Door 1.00m x 2.10m
Door 0.90m x 2.10m
Window (1.00x1.30)m
Ventilator (0.90x0.60)m
Labour charges for fixing door etc., complete
Labour charges for fixing Windows and Ventilator etc., complete
Provision for Water Supply & Sanitary Arrangements etc complete
Earth work excavation for in all soils classification SS20B including refilling the trenches after PVC line laying etc complete
Refilling with excavated earth etc complete
63 mm PVC Pipe (4KSC)
25mm UPVC Pipe
20mm UPVC Pipe
25mm Tee
25mm Elbow
25mm Bend
25x20mm Reducer
20mm Tee
20mm Elbow
20mm Bend
20x15mm Reducer
110mm dia PVC Pipe
75mm dia PVC Pipe
110mm Tee
110mm Elbow
110mm Bend
75mm Tee
75mm Elbow
75mm Bend
IWC (S.NO 177 ii)
Wash basin (S.NO 184 iii)
15mm brass tap (S.NO 159)
100mm dia Stoneware pipe (S.NO 207 ii)
500 litre sintex
Provision for Electrical Arrangements etc complete
Wiring with 2x1.5 sqmm (22/0.3) PVC insulated SC unsheathed copper conductor cable of 1100V grade in suitable heavy gauge MS conduit pipe on wall and ceiling with MS accessories with switch box with 5A F.T. switch inflush with wall and covered with hylum sheet of 3mm thick with painting of suitable colour with continuous earth wire connection of 14 SWG TC wire for light point.
Wiring with 2x1.5 sqmm (22/0.3) PVC insulated SC unsheathed copper conductor cable of 1100V grade in suitable heavy gauge MS conduit pipe on wall and ceiling with MS accessories with switch box with 5A F.T. switch inflush with wall and covered with hylum sheet of 3mm thick with painting of suitable colour with continuous earth wire connection of 14 SWG TC wire for Fan point (For electronic Regulator)
Wiring with 2x1.5sqmm (22/0.3) PVC insulated SC unsheathed Cu.Conductor of 1100 V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories, in flush with wall, with 150mm x 100mm x 113mm TW switch box with 3 mm thick Hylem sheet cover for 5 A 3 pin non inter lockingWall socket with 5A Flush type switch with continuous earth wire connection of 14 SWG TC wire and making good of the concealed portion with suitable colour for concealed PVC plug point.
Supply and fixing of TNEB meter Board suitable for 32A Three Phase service connection with 3 Nos. 32A Fuse unit (500V) 32A neutral link and earth link (1" x 1/8" Copper flat) on TW plank of size 600mm x 450mm x 19mm with supporting TW reepers of 1" thick an either side with painting with suitable bolt and nuts for fixing the TW plank on wall with earth connection and inter connection with 7/20 PVC insulated copper wire from EB meter to fuse unit.
Supply and fixing of 1200mm sweep AC Ceiling fan complete with stepped electronic 300w regulator with 300mm down rod on the existing clamps (crompton make).
Supply and run of 4 x 6 sq.mm (84/0.3) PVC insulated SC unsheathed Cu.Conductor of 1100V on 7/20 GI bearer wire for service connection mains
Towards the cost of Provision for EB deposit including all cost & conveyance etc., complete.
Supply and fixing of WT bulk head fitting with guard (Philips / Bajaj / Crompton / K. Lite) suitable for11W CFL lamp with CFL
Supply and fixing of 32 Amps DP Switch of 500 V with metal clad with fuse and neutral (Side Handle) on suitable TW Board , with earth connection only
Supply and run of 4 x 6 sq.mm (84/0.3) PVC insulated SC unsheathed Cu.Conductor of 1100V grade in 32mm dia GI pipe (Class 'B') suitably bent at both ends with necessary angle iron up right and end supports for mains
Supply and fixing of single box type 4'40 W flu fitting complete with copper choke and condensor with TW round blocks on wall or ceiling with flu tube with PVC unsheathed Copper leads from terminals to the fitting.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
S P V CONSTRUCTION
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .