Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹15.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹16.6 L+₹1.6 L (11.0%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹17.5 L+₹2.5 L (16.7%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹17.6 L+₹2.7 L (17.7%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹20.4 L+₹5.5 L (36.5%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹21.1 L
EMD Value
₹42,200
Closing Date
26 Dec 2025, 6:00 pmClosed
EO MB Bijainagar
EO MB Bijainagar
perapheri kshetra me nirashrit govansho ke liye char diwari nirman va vikas karya
2025_DLB_520495_1
NIT-23/2025-26/5015 BIJAINAGAR
Open Tender
Civil Works
Percentage
90 days
Bijainagar
Please refer Tender Document
2 documents required · 2 mandatory
₹1,000
EO MB Bijainagar/ MD RISL Jaipur
₹42,200
Yes
26 Jan 2026
15 Dec 2025
30 Dec 2025
15 Dec 2025
26 Dec 2025
15 Dec 2025
Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt,clay, black cotton soil,kankar, etc. Depth upto 1.5 m
Carriage of Materials by mechanical transport including loading, unloading and stacking ::Earth 2 Km.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : . 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size).
Random rubble masonry with hard stone in foundation and plinth :Cement mortar 1:6 (1 cement : 6 coarse sand)
Brick work with machine moulded perforated bricks of class designation 125 conforming to IS: 2222 -1991 in superstructure above plinth level upto two stories in cement mortar 1:6 (1 cement : 6 coarse sand) : With Modular bricks.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size).
Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of compensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km)
Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix : 1:6 (1 cement : 6 fine/ coarse sand)
Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete
Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade: Two or more coats on new work
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
Tendernotice_2.pdf
PDF • 0.48 MB
BOQ_928684.xls
BOQ • 1.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .