Jacketing of bridges including design & launching of PSC slabs and other allied works of bridges in c/w Replacement of steel girder of PSC slab at bridge no. 7, 38 ,39 (MB-CH) , Br. No 106 ,121A (CH- ALJN) and Br. No. 20(JNPT-CH) & 6 on (RJK- SHTS) under Sr.DEN/HQ/MB
86-DRM-MB-26-27
86-DRM-MB-26-27
Open
6 Months
Raigad, Maharashtra
₹0
₹7.3 L
16 Jun 2026
16 Jun 2026
26 Jun 2026
IR for making lighting arrangement to work during nighthour/block as and when required ,with generator set of minimum5 KVA capacity 6 halogen lamps of 500 watt,operation 1 &maintenance of generator set &Halogen lamps with labour &material including all necessary lighting, cables, fuel, operator,transporting of all men and machine, all taxes etc. complete.Payment shall be made as per actual working hours of generator.So nothing extra shal be paid to the contractor except theaccepted rates whatsoever the case may be.
Putting of ballast in track uniformly from the stack lying alongthe cess/ground as per 2 requirement including boxing , dressing as per latest specifications or as per directions of engineer - in -charge at all heights , depths , ascends , descends , all type ofxings , or any other obstruction with contractors own tools and plants , labour complete job . Lead 0 to 200 M and Lift upto 30m Note: Removing existing ballast from track and stacking at site included in this.
Hiring of heavy earth machinery or heavy excavator like Poclain for dredging of river for making coffer dam/any other work where required including all labour , leading etc. all complete
Preparation and submission of assessment of the strength/ adequacy of the Pier,Abutment & Foundation to cater for the load upto 12.2m Span PSC Slab in replacement of existing Plate Girder Bridge as per site data with RDSO Standard of 25T Loading -2008 Standard PSC 4 Slab, as per latest relevant IRS Codes based on data for existing pier/abutment to be supplied by Railway, followed by recommendation for required modification /strengthening along with detailed design & drawings (2 copies each & 1 copy of each drawing in original tracing). The design and drawings shall have to be proof-checked by IIT or similar Govt. reputed institute and approved by the Competent Authority of the Railway. The rate is inclusive of all to complete the work." (NOTE :UNIT job means per bridge)
Deduction for Non Schedule Item i.e. straightening, cutting, bending, placing in 5 position and binding of reinforcement steel included in NS item of RCC Box including cost of straightening, cutting, bending, placing in position and binding of reinforcement steel paid in common in NS item and USSOR-Item No. 045010
Item Breakup - A-DSR Items
Item Breakup - B-USSOR Items
cum Earthwork in cutting in formation, trolley refuges, side drains, level crossing approaches, platforms, catch water drains, diversion of nallah & finishing to required dimension and slopes to obtain a neat appearance to standard profile inclusive of all labour, materials, plant & machinery, leading all cut spoils either to make spoil dumps or for filling in embankment with leads within 2 km on either side of edge of the cutting(s) including all lifts, ascent, descent, loading, unloading, bailing & pumping out water, if required, clearance of site and all other works incidental thereto for completing the work as per RDSO Specification No. RDSO/2020/GE: IRS-0004 with latest updated correction slips and to the satisfaction of the Engineer-in-Charge. Note: (i) All usable earth arising from cut spoils shall be led into bank formation and Unusable spoils shall be dumped / stacked away from toe of embankment. (ii) All hard rock /and boulders not fit for filling will be stacked by the contractor and will be property of the Railways. (iii)Cut trees shall be property of Railways and to be deposited in the railway godown unless specified otherwise in the Conditions of Contract.
566.00 except rock MORADABAD DIVISION-ENGINEERING/NORTHERN RLY Providing portable fencing along running track where work is to be done in close vicinity of track, maintaining during execution of work and removing after completion of the work as per direction of the Engineer. Fencing shall consist of self supporting steel angles of size 50mm x 50mm x 6mm, 1.5m long provided with hooks etc. and embedded in CC 1:2:4 block of size 0.23m x 0.23m x 0.23m placed at c/c distance of 2m along track. 12mm dia rods in three horizontal layers shall be tack welded with angle posts. Note : Released material will be property of the contractor after completion of work. Cost of cement required for CC blocks shall be paid separately.
1113.00 reflective tape in horizontal direction, duly secured/tight with vertical posts. Total 1097726.45 Item- 2 All items of Ch.02(Bridge Works-Substructure) SOR 2021 S No. Item Description of Item Unit Qty Rate Amount No Exploratory drilling of Boreholes down to required depth, drilling of 150mm diameter boreholes in all type of soils except hard rock and large boulders (boulder core more than 30cm), including refilling, reinstating surface and disposing off surplus material including use of mechanical rigs with power operated winches as well as percussion / chiselling tool for advancing through occasional seams of hard strata to be employed where necessary in River bed area including standing/flowing w a t e r with all necessary arrangements except making of platform under water which shall be paid under relevant item of SOR.
66.00 Boulder at all levels
7.00 undisturbed samples of soil from bore holes, including provision of air tight containers for packing and, labeling incl. transporting the samples to laboratory. Piston sampler shall be used for extracting undisturbed samples where necessary. Samples shall be collected as per IS:2720.
7.00 disturbed samples of soil from bore holes, including provision of air tight containers for packing, labeling and transporting the samples to laboratory. Samples shall be collected as per IS:2720.
7.00 IS:2131 at approximate1.5m intervals in bore holes, as directed by the Engineer in charge Conducting laboratory Tests on collected soil samples as per relevant IS code
Each Conducting Laboratory tests on collected ROCK SAMPLES as per relevant IS code
Each MORADABAD DIVISION-ENGINEERING/NORTHERN RLY
Each Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines.
cum Providing and laying in position Plain cement concrete of specified Nominal Mix for miscellaneous works like side drains, foundation for OHE masts and other miscellaneous structures excluding the cost of Cement, centering and shuttering - All work up to plinth level :
296.00 graded stone aggregate 40 mm nominal size). Providing and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the following Reinforced cement concrete structural elements up to height of 9.0 m from foundation top level, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as p e r specifications and direction of the Engineer in charge. N o t e : 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item.
299.00 1:3:6 with graded stone aggregate of 40mm nominal size, in foundation and floors, retaining walls of bridges including mechanical mixing, vibrating, pumping and bailing out water where ever required with all materials and labour complete but excluding the cost of cement and shuttering as per drawings and technical specifications as directed by Engineer. MORADABAD DIVISION-ENGINEERING/NORTHERN RLY Centering and shuttering including strutting, propping etc. and removal of form for :
3449.00 abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to 5m above ground level
542.00 batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site using 20mm graded crushed stone aggregate and coarse sand of approved quality in jacketing of piers and abutments from bottom of foundation up to a height of 10m for designed thickness of jacketing including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as p e r specifications and direction of the Engineer in charge. N o t e : 1. Payment for cement, reinforcement and shuttering shall be paid extra under relevant item. 2. Plasticizer shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticisers at the stage of Mix Design and in that case deduction shall be made as per relevant item. Extra over 025040 for drilling of holes and insertion of dowel bars in case of Jacketing
dia. jacketing / anchoring
1013.00 dia. (cost of rods to be paid extra) Supply and using Cement at Worksite
35.00 brands/makes
53 approved brands/makes Supply of steel reinforcement of approved brands/makes for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.
125000.00 Fe-500D or more of approved brands/makes. Total 25244049.21 Item- 3 All items of Ch.03(Bridge Works - Super Structure (RCC) SOR 2021 S No. Item Description of Item Unit Qty Rate Amount No MORADABAD DIVISION-ENGINEERING/NORTHERN RLY
50.00 batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the Precast Prestressed (Post-tensioned) Concrete Girder/Box Girders/Slabs in contactor's casting yard in the vicinity of worksite, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability, complete as per drawings, specifications and direction of the Engineer. Note: 1. Payment for Shuttering, Cement, Reinforcement, HTS cables, Sheathing, Anchorage Cones, stressing of cables, grouting of the ducts and launching of girder/slab in position shall be made extra under relevant items. However, deduction shall be made in case of slab as per relevant item. 2. For pre-cast item, loading in transport vehicle in casting yard is included and shall not be paid extra. 3. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons at the stage of Mix Design and in that case deduction shall be made as per relevant item. Loading, transportation of Precast RCC Girders / Slabs / Ballast retainers / Steel Girders etc. from Casting Yard to Site of Work, unloading and stacking at site of work at prescribed location as directed by Engineer-in-Charge above 60 kms.
MT- Above 200 km Km
165.00 and piers, made by 20mm thick 1:4 cement plaster for a width of not less than 300mm, duly engraving markings & figures in metres, divided into 10 parts commencing from under-side of girders towards bed, painting markings & figures with black enamel paint in three coats on white background including painting HFL Mark in white by side of gauge with year of occurrence with all Contractor's materials, labour, tools, scaffolding and supports, lead & lifts, curing etc. complete as per approved drawing and as directed by the Engineer in- charge excluding cost of cement which shall be paid extra. Total 772921.40 Item- 4 All items of Ch.04(Bridge Works - Super Structure (Steel ) SOR 2021 S No. Item Description of Item Unit Qty Rate Amount No Providing road crane of specified lifting capacity with specified jib length revolving type for material handling, assembly & erection of girders/slab/RCC Box etc.
Day MORADABAD DIVISION-ENGINEERING/NORTHERN RLY Removing of existing bed plate from existing bed block, supply, fabrication and erection of new bed plate of approved sizes in exact position over bed block of pier/abutments by giving full and even bearing, setting them on the layer of free flow non-shrinkable grouting compound, scrapping or chipping of bed block, if required, fabrication and fixing of holding down HTS bolts of suitable sizes along with nuts, washers etc., drilling holes of required size, grouting of holes by epoxy mortar after fixing holding down bolts. Total work to be done during traffic block. Cost of holding down HTS bolts shall be paid extra under relevant item for supply of HTS holding down bolts.
Kg Total 3300938.31 Item- 5 All items of Ch.05(Bridge Works - Misc ) SOR 2021 S No. Item Description of Item Unit Qty Rate Amount No Grouting of masonry/concrete by injection process duly Sealing of cracks, through nipples complete as per Technical Specification and procedure given in IRBM Para No 209 including necessary admixture. Payment shall be as per use of cement by weight in case of neat cement/cement mortar grouting and weight of Epoxy in case of Epoxy Grouting. (Cement will be paid extra).
468.00 compound w.r.t. cement.
264.00 mark, year of HFL on bridge abutments and piers with ready mixed paint as per standard in two coats over one coat of primer with all materials, labour, tools, scaffolding, all lead and lift etc. including writing complete.
137.00 as per Railway drawing in cement concrete 1:2:4 mix using 20mm hard stone aggregate embedded in 30mm notch in Bridge parapet coping duly engraving the letter and figures and an arrow indicating the direction of flow and finishing the top exposed surface with cement mortar 1:3, painting letters and figures with two coats of black enamel paint on two coats of white background with all labour, tools, cement, paint etc. with all leads and lifts.
879.00 from any location. Payment to be done for Hour Horse power of pump multiplied by pumping hours. Total 1893695.91 Item- 6 All items of Ch.08 (Deep Screening and Ballast Related Activities.) SOR 2021 S No. Item Description of Item Unit Qty Rate Amount No MORADABAD DIVISION-ENGINEERING/NORTHERN RLY Manufacturing, supply and stacking of machine crushed Track Ballast conforming to RDSO Specification (IRS-GE-1) with latest correction slips at Railway depot or nominated location. Note: Distance of nearest quarry mentioned in each sub-item is only for the purpose of selecting the items for preparation of estimates/tender schedule, based on the minimum distance between nearest quarry and centre of supply points and will not affect the selection of quarry during physical supply in any way till prescribed specification is met fully.
436.20 than 150 km and up to 200 km Total 1127127.71 Item- 7 All items of Ch.11(Formation Rehabilitation) SOR 2021 S No. Item Description of Item Unit Qty Rate Amount No
1642.00 Specifications and guidelines RDSO/2020/GE: IRS-0004 or latest in running line with suitable soil to the designed profile The work shall include uprooting and disposing of all the vegetation, benching at every 30 Cm vertical height, earthwork in benching portion and compaction using suitable slope vibratory Rollers/Compactors etc. to achieve prescribed MDD. Note: 1. Payment of cess repairs shall be based on the quantities worked out from the cross sectional calculations only and worked out from the initial ground levels before doing benching and final levels as done for new embankment. The earth work in benching portion shall not be paid extra as the same has been included in the rate. 2. The earth work shall be started only after Completing of the benching and certified. 3. The benching Work shall be done for a maximum height of 1.50 m at any time based on the progress of earthwork starting from toe of the embankment. Total 719540.82 Item- 8 All items of Ch.12(Activities at Construction Sites) SOR 2021 S No. Item Description of Item Unit Qty Rate Amount No
255.00 structure, removing rails, sleepers, fish plates, cutting of rails, segregation and stacking of released Rails, Sleepers and fitting at nominated location in countable manner within a free lead of 500m, levelling of ballast to correct profile for laying new track over it, all as per direction of Engineer- in-Charge. MORADABAD DIVISION-ENGINEERING/NORTHERN RLY
260.00 ballasted deck bridges with any type of rail section and PSC sleeper including leading free rails/welded panels available along the alignment on to bridge, leading and spreading all fittings and fastenings, leading & spreading of sleepers at specified spacing, squaring, placing of rails over sleepers and fixing rails & guard rails to sleepers with all types of fittings and fastenings to correct gauge & alignment, lubrication of fittings and fastenings with contractor's grease as per IRPWM standards with contractors labour, tools, consumables, with all lead, lifts etc. complete and raising, levelling and initial packing of track to make it fit for 30 kmph and meet other prerequisites prescribed in Indian Railway Track Machine Manual for deployment of Tamping Machine. Note: 1.Rail cutting and Hole drilling shall be paid separately. 2.Spreading of ballast and compaction shall be paid separately under relevant item. 3. This item shall be applicable only when track is with Guard Rail. Linking without guard rail be paid under relevant item for plain track linking. Total 172308.65 Item- 9 All items of Ch.13 (Maintenance Activities) SOR 2021 S No. Item Description of Item Unit Qty Rate Amount No First or Second Through Packing of track of all sleeper density including giving a general lift, as desired to eliminate sag after Deep Screening work, lifting of track, lowering of track and major realignment of curves and formation rehabilitation as per procedure prescribed in latest edition of IRPWM. Note: General lift is normally 25 mm and isolated lift may be up to 50 mm.
250.00 of 1660 Total 39520.00 Item- 10 All items of Ch.17 (Handling of Materials) SOR 2021 S No. Item Description of Item Unit Qty Rate Amount No Loading, leading and unloading of all types of P.Way fittings and all other miscellaneous material except Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: Lead shall be the shortest motorable road length between the points of loading and unloading.
MT Transportation of Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: 1 . Lead shall be the shortest motorable road length between the points of loading and unloading. 2. Loading and unloading shall be paid extra under relevant items.
MT Total 155201.32 MORADABAD DIVISION-ENGINEERING/NORTHERN RLY Item- 11 All items of Ch.19 (Bridge Related Activities) SOR 2021 S No. Item Description of Item Unit Qty Rate Amount No
436.00 by removing weeds / shrubs / bushes, removing silt deposit, filling scours, if any up to 10 metre from centre of bridge on either side including disposing waste and silt away from waterway. Note: Rate is for a single line and per metre of bridge span.
63.00 450mm Bridge Board made from 16 SWG MS Sheet duly welded or riveted to back support of two 600mm long horizontal angles of size 25mm x 25mm x 3mm & two numbers 2.5 metre long vertical support of MS Angle of size 50mm x 50mm x 5mm, welded / rivetted to board. Vertical supports shall have split ends for proper fixing in ground. Vertical supports of board shall be embedded in ground in M 20 Cement Concrete blocks of size 300mm x 300mm x 300mm, complete job including painting & writing of subject matter on bridge board, as directed by Engineer - In charge Note: Excavation & concrete work will be paid separately. Total 348609.52 Item- 12 All items of Ch.21(Miscellaneous Items) SOR 2021 S No. Item Description of Item Unit Qty Rate Amount No Hiring of machinery for minor miscellaneous works for short duration including operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site.
247.00 minimum 1.10 cum bucket capacity
247.00 crane of 12T capacity for misc. works of handling of material
3075.00 cement polythene bags with Rly. Ballast/moorum/earth/Sand/quarry dust etc. placing the filled bags on the high banks /bridge approaches/nominated place etc. dumping and spreading at the nominated locations to profile under block period with all contractor's labour, tools, plants, loading, unloading, filling, spreading including all lead/lift etc. complete and as directed by the Engineer in charge at site including crossing of track where necessary. Total 478075.12
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC-2022.pdf
ATTACHMENT
HQletterdated10.02.2025.pdf HQ letter
ATTACHMENT
GCC-2022ACSUPTO11NOS.pdf GCC correction slips
ATTACHMENT
STDUptoACS11.pdf
ATTACHMENT
GCC-2022ACSUPTO11NOS.pdf
ATTACHMENT
HQletterdated10.02.2025.pdf
ATTACHMENT
Download all tender documents and submit your bid