Loading…
Loading…
Tender Value
₹14.4 L
EMD Value
₹14,500
Closing Date
14 Oct 2026, 3:00 pm6d left
Executive Engineer (Central Tender Cell)
Central Tender Cell, BMC, ICOMC Tower, Unit-9, Satyanagar
Repair and Renovation including P.H. and Sanitation Works with Painting Works to the Existing Truss Members etc. and Infrastructure Development of Kanan Vihar MCC in Ward No. 03
2026_ORULB_141915_2
BMC-EE-Tender Cell-73/2026-27 dt. 25.09.2026
Open Tender
Civil Works - Others
Percentage
90 days
BMC, AREA
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹14,500
Yes
Office Chamber of EE(Central Tender Cell)
29 Sept 2026
29 Sept 2026
14 Oct 2026
29 Sept 2026
14 Oct 2026
29 Sept 2026
29 Sept 2026 - 6 Oct 2026
6 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling B.M. in cement mortar under 3mtr height including stacking the useful materials for re-use & removing the debries away from work site within | 41.3 | Cum | 1,646.62 | ₹68,005.41 |
| 2 | Dismantling and removing old tiled flooring including removing the base coarse and stacking the useful materials for re-use and removing the debries within 50mtr lead | 58 | Sqm | 209.95 | ₹12,177.1 |
| 3 | Earth work excavation in all kinds of soil in water upto 0.60 mtr depth requiring the aid of pan & vessel within 50mtr initial lead and 1.50mtr initial lift. | 4.8 | Cum | 209.95 | ₹1,007.76 |
| 4 | Supplying and filling F&P with river sand with well watering and ramming etc. complete. | 1.2 | Cum | 588.9 | ₹706.68 |
| 5 | Supplying all materials, labour, T&P and providing Cement Concrete (1:4:8) using 4 cm size CBHG metal etc. complete. | 3.34 | Cum | 5,856.52 | ₹19,560.78 |
| 6 | Supplying all materials, labour, T&P and providing Cement Concrete M20 using 12mm to 20mm size BHGCB chips including centering and shuttering etc. complete. | 25.78 | Cum | 6,201.98 | ₹1,59,887.04 |
| 7 | Supplying all materials, labour, T&P and providing Flyash brick masonry in cement mortar (1:6) in Foundation etc. complete. | 35.11 | Cum | 5,543.7 | ₹1,94,611.59 |
| 8 | Supplying all materials, labour, T&P and providing Reinforced Cement Concrete M20 using A) Plinth | 6.2 | Cum | 7,459.18 | ₹46,209.62 |
| 9 | Supplying, fitting & placing uncoated HYSD reinforcement including cutting, | 7.11 | Qntl | 9,552.47 | ₹67,918.06 |
| 10 | 12mm thick C:P (1:4) over brick work | 324.8 | Sqm | 188.91 | ₹61,357.97 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
DTCN_73.pdf
Tender Documents • 0.91 MB
BOQ_611230.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .