| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr Quoted ₹1.3 Cr | L1 | Accepted-AOC Lowest offer accepted for AOC. |
| 2 | L2₹1.5 Cr+₹20.5 L (15.8%)Rejected-Finance | ₹1.5 Cr+₹20.5 L (15.8%) | L2 | Rejected-Finance Not lowest. |
| 3 | L3₹1.5 Cr+₹24.1 L (18.6%)Rejected-Finance PLOT N0 28 SECTOR 25 FARIDABAD FARIDABAD FARIDABAD HARYANA 121004 | FARIDABAD | HARYANA | 121004 | ₹1.5 Cr+₹24.1 L (18.6%) | L3 | Rejected-Finance Not lowest. |
| 4 | L4₹1.7 Cr+₹40.4 L (31.1%)Rejected-Finance 307 ANAND CHAMBERS NEAR OLD HIGH COURT RLY CROSSING NAVRANGPURA AHMEDABAD 380009 GUJARAT INDIA | AHMEDABAD | AHMEDABAD | GUJARAT | 380009 | ₹1.7 Cr+₹40.4 L (31.1%) | L4 | Rejected-Finance Not lowest. |
| 5 | Rejected-Technical | - | - | Rejected-Technical The bidder does not fulfilled the required EQC |
Tender Value
₹1.1 Cr
EMD Value
₹2.1 L
Closing Date
29 Apr 2019, 3:00 pmClosed
Chief General Manager
Office of the Chief General Manager IRCON INTERNATIONAL LIMITED, 5th Floor, Mehta Mahal, 15, Mathew Road, Opera House, Mumbai 400004,
Design, fabrication, supply, installation and commissioning of electric hoists, motors and all electric an electronic parts for fixed gantries system at Palghar Main Depot of Vaitarana Sachin Section in connection with const. of WDFC CTP12 Project.
2019_IRCON_25285_1
IRCON/3018/DFCCILCTP12/ eTender/GantryHoist/08-231
Open Tender
Electrical Works
Item Rate
30 days
Vangaon
Please refer tender document
2 documents required · 2 mandatory
₹10,000
Yes
Payable To IRCON INTERNATIONAL LIMITED
₹2.1 L
Yes
Mumbai
14 Jun 2022
15 Apr 2019
30 Apr 2019
15 Apr 2019
29 Apr 2019
16 Apr 2019
16 Apr 2019 - 17 Apr 2019
23 Apr 2019
Amount
Design , Supply ,testing , installation and commissioning of Electric Hoists (4 Fall , Lifting capacity 2 T ).
Design , Supply, testing , installation and commissioning of 7 nos Electric Hoists (4 Fall with lifting capacity 5 T)
Design , Supply of Shaft mounted Gear Box with electric motor along with Motor for movable gantries with 5 T lifting load . The gear boxes shall be compatible with Drive Wheels of Gantry provided by IRCON . Self weight of each Gantry is about 18 MT
Design , Supply, testing and installation of Complete Shrouded DSL system (Aluminium) including Web bracket , current collector , Power Kit ( 4 nos) and any other accessories for 4 nos of movable gantries for rail handling system
Design , Supply, testing and installation of Complete Shrouded DSL system (Aluminium) including Web bracket , current collector , Power Kit ( 4 nos) and any other accessories for 3 nos of movable gantries for sleeper handling system .
Design, Supply, testing and installation and commissioning of complete festoon Cross Travel DSL system , Web bracket, electric cables , limit switches etc and any other accessories for 4 nos of movable gantries for Rail handling . Panel of each gantry shall be installed at ground level .
Design , Supply, testing and installation and commissioning of complete festoon Cross Travel DSL system , Web bracket, electric cables , limit switches etc and any other accessories for 3 nos of movable gantries for Rail handling . Panel of each gantry shall be installed at ground level .
Supply, testing and installation and commissioning of complete festoon Cross Travel DSL system , Web bracket, electric cables , limit switches etc any other accessories for 20 nos of movable gantries for Rail handling . Panel of each gantry shall be installed at ground level .
Design , supply , installation and commissioning of all kind of Electrical cables ( Power cables as well as control cables ) from Distribution panel to individual panel board and from individual panel board to hoist control and motor system for 20 nos Fixed Gantries .
Design , supply , installation and commissioning of Electrical cable (Power cables as well as control cables) from Distribution panel to panel board of hoist control through DSL and motor system for 4 nos movable Gantries for Rail Handling system .
Design , supply , installation and commissioning of Electrical cable ( Power cables as well as control cables) from Distribution panel to panel board of hoist control through DSL and motor system for 3 nos movable Gantries for Sleeper Handling system .
Design , Supply , testing and installation of hoist control Electrical and electronics panel ( weather Proof) , at Ground level consisting of 1) Suitable capacity MCB- panel main start and stop function , sequence controller- function phase loss protection & phase reverse protection, contactors , function UP-DOWN for hoist motor, transformer-440/110 AC function- step down the voltage for controlling of remote, power indicator-220v AC- function indication of phase in panel power and loss phase indications, Variable Frequency Drive (VFD) panel and any other items required for hoist control , both CT & Up-Down movement for 20 Nos Fixed gantries Each 2 T Capacity and Relay units including Emergency stop switches .
Design , Supply , testing and installation of hoist control Electrical and electronics panel ( Weather proof) , at Ground level consisting of 1) Suitable capacity MCB- panel main start and stop function, sequence controller- function phase loss protection & phase reverse protection, contactors , function UP-DOWN for hoist motor, transformer-440/110 AC function- step down the voltage for controlling of remote, power indicator-220v AC- function indication of phase in panel power and loss phase indications, Variable Frequency Drive (VFD) panel and any other items required for hoist control , both CT & Up-Down movement for 7 Nos Fixed gantries Each 5 T Capacity and Relay units including Emergency stop switches .
Supply , installation and testing of electric cable from Transformer to Distribution panel required of 4 Set of Movable Gantry for rail Handling system. Minimum cable size shall be 35 Sq mm Aluminum armored
Supply , installation and testing of electric cable from Transformer to Distribution panel required of 3 Set of Movable Gantry for sleeper handling system . Minimum Cable size shall be 35 Sq mm Aluminum armored
Supply , installation and testing of electric cable from Transformer to Panels of 20 Set of Fixed Gantry system . Minimum Cable size shall be 50 Sq mm aluminum armored cable
Supply , testing and installation of suitable capacity Electric distribution panel Panels ( Weather proof) including MCCB including phase sequence controller , phase loss protection and phase reverse protection for 20 nos Fixed gantry system . This will be connected to panels of all hoists of 20 nos Fixed Gantries and another 20 Motors ( each 1.5 KW capacity ) of a separate Roller conveyor system
Supply , testing and installation of suitable capacity Electric distribution Panels ( weather proof) including MCCB including phase sequence controller , phase loss protection and phase reverse protection for 4 nos movable gantry system for rail handling . This will be connected to Shrouded DSL for Supply of electricity to all Motors of Hoists and travelling motors .
Supply , testing and installation of suitable capacity Electric distribution Panels ( weather proof) including MCCB including phase sequence controller , phase loss protection and phase reverse protection for 3 nos movable gantry system for Sleeper handling . This will be connected to Shrouded DSL for Supply of electricity to all Motors of Hoists and travelling motors .
Remote Control Device and manual control device for synchronized movement of all gantries as well as individual manual control of each gantry in 20 Nos Fixed gantry system
Remote Control Device as well as Manual for synchronized movement and individual control of each gantry for 2 pairs of movable gantry system for rail handling system
Remote Control Device as well as manual control device for movement of each gantry in each movable gantry system for sleeper handling system
Supply , testing , installation and Earthing including all material for Main distributional panels and other places as required .
Supply, testing and installation D clamps of Minimum capacity 3 T
Supply, testing and installation D clamps of Minimum capacity 5 T
Supply, testing and installation D clamps of Minimum capacity 8 T
Supply testing and installation of lifting belts of capacity 4 T and Length 4 Meter
Supply testing and installation of lifting belts of capacity 2 T and Length 2 Meter
SMACO ENGINEERING PVT. LTD.
Endeavour Instrument Pvt. Ltd.
REVA INDUSTRIES LIMITED
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .