Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.3 CrAdmitted-Finance AT KHARIAR PO KHARLAR DIST NUAPADA | -22.60% | ₹7.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹7.4 CrAdmitted-Finance A CLASS ENGG CONTRACTOR AT LATHORE PO HARISHANKAR ROAD PS KHAPRAKHOL DIST BALANGIR | -22.03% | ₹7.4 Cr | L2 | Admitted-Finance |
| 3 | L3₹8.2 CrAdmitted-Finance ODISHA OB | -12.99% | ₹8.2 Cr | L3 | Admitted-Finance |
| 4 | L4₹8.5 CrAdmitted-Finance | -9.99% | ₹8.5 Cr | L4 | Admitted-Finance |
| 5 | L5₹9.4 CrAdmitted-Finance | +0.00% | ₹9.4 Cr | L5 | Admitted-Finance |
Tender Value
₹9.4 Cr
EMD Value
₹9.4 L
Closing Date
15 Apr 2026, 5:00 pmClosed
CGM PC
IDCO Towers Janpath Bhubaneswar
Construction of SFRC Pre Cast, Pretensioned Compound Wall for Paradeep Petrochemical Complex at Fatehpur and Pratappur under Kujanga Tahasil of Jagatsinghpur.
2026_IDCO_127714_1
PC/EST/45/2025-26
Open Tender
Civil Works - Others
365 days
Kujanga, Paradeep
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
₹9.4 L
Yes
25 May 2026
31 Mar 2026
16 Apr 2026
31 Mar 2026
15 Apr 2026
31 Mar 2026
31 Mar 2026 - 13 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Earth work in ordinary soil in embankments, roads etc. within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30m in depth and as per specification approved by the Deptt. along with proper compaction with PRR including hire & running charges of PRR, all labour, T&P, sundries etc all complete as directed by the Engineer-in-Charge. | - | cum | 1 | - |
| 3Filling foundation with excavated material and compacted and top surface dressed and levelled to proper level & slope as per direction of the Engineer in charge including cost of all labour sundries T&P etc complete as directed by the Engineer-in-Charge. | |||||
| 4Construction and boring 300 mm dia single under reamed pile foundation in cement concrete of M-25 grade using 20mm & down grade crusher broken hard granite chips of approved quality,etc complete as directed by the Engineer-in-Charge. | |||||
| 5 | Providing, mixing, lifting, hosting and laying reinforced cement concrete of M-25 grade confirming the minimum compressive strength of 250kg/cm2 on work test (test conducted in accordance with IS : 456 & IS : 516) of 15 cm cube at 28 days to base of columns and footing, fins, roof slabs, etc. complete including cost, conveyance, loading, unloading, royalties of all materials and cost of all labours, T&P, required for the work etc. complete in all respect as per the direction of the Engineer-in-Cgharge but excluding cost and conveyance of M.S. rods or Tor steel. | 1 | cum | - | - |
| 6 | Cutting, Straightening coiled or bent up HYSD / TMT Reinforcement Bars welding or jointing if necessary, bending, binding, tying the grills as required for R.C.C. works, hoisting, lowering and placing the same in proper position according to the approved designs and drawings including cost, coveyance, loading, unloading ,stacking & taxes of HYSD/ TMT Reinforcement Bars and Binding Wires of 18 to 20 Gauge as required for the work , cost of all Labour T&P as directed by Engineer-in-charge. | 0.8 | Qntl. | 1 | ₹0.8 |
| 7Providing & laying P.C.C.(1:3:6) using 40mm and down grade size black hard crusher broken granite metal of approved quality from approved quarry including mixing, lowering, laying and compacting to proper thickness watering and curing for the required period as per direction of the EIC, including cost of all materials with all taxes and royalties, loading and unloading, conveyance, all labour, all sundries and T & P etc. complete as directed by Engineer-in-Charge. | |||||
| 8 | Providing strong, rigid, leveled and plumbed centering and shuttering to required shape and size for all kinds of R.C.C. works in Foundation and Plinth with wooden or steel centering materials with all necessary bracing, ties and supports for level centering covered with bituminous paper dismantling and removing the shuttering after the required interval from the date of casting as per the direction of the Engineer-in-charge., including cost of all materials with transportation, loading and unloading , inclusive cost of all labour, materials and as per direction of the Engineer-in-charge. | - | Sqm | 1 | - |
| 9Painting with two coats of waterproof cement paint over a coat of cement wash of approved quality after cleaning by & removing the dirts etc. to the surface to be painted including cost, conveyance, royalty, of all materials, cost of all labour, T&P etc. required for the work complete in all respect as per direction of the Engineer-in-Charge. | |||||
| 10 | Painting with one coat approved primer of approved make Iron / wood work including sand papering, polishing the surface, cost, conveyances, taxes of all materials and cost of all labour with T&P etc, complete as per specification & direction of Engineer-in-charge. Note :- Sample of Primer shall be approved before procurement and use. | 0.4 | Sqm | 1 | ₹0.4 |
| 11 | Painting two coats with approved synthetic enamel paints of approved make and of approved colour, shade to new Iron work including cost, conveyances, taxes of all materials and cost of all labour with T&P etc, complete as per specification & direction of Engineer-in-charge. Note :- Sample of Paint shall be approved before procurement and use. | 0.4 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
bid.pdf
Tender Documents • 0.97 MB
BOQ_586730.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid