Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹76,100
Closing Date
25 Sept 2026, 10:00 amClosed
Managing Director UPSWC
U.P. State warehousing corporation New Hyderabad Lucknow 226007
Repair of UPSWC Godowns at Sarai Esar (Etawah).
2026_UPSWC_1185537_1
20260933101
Open Tender
Civil Works
Percentage
120 days
Sarai Esar (Etawah).
Only registered contractor with UPSWC can apply
2 documents required · 2 mandatory
₹1,180
U.P. State warehousing corporation
₹76,100
9 Oct 2026
14 Sept 2026
25 Sept 2026
14 Sept 2026
25 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Godown Repair Work | - | - | - | - |
| 2 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within50 metres lead. | 2,939.29 | Sqm | 54.65 | ₹1,60,632.2 |
| 3 | 12 mm cement plaster of mix :1:6 (1 cement: 6 coarse sand) | 2,939.29 | Sqm | 343.65 | ₹10,10,087.01 |
| 4 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete | 27,077.8 | Sqm | 19.75 | ₹5,34,786.55 |
| 5 | White washing with lime to give an even shade . New work (three or more coats) | 2,939.29 | Sqm | 39.05 | ₹1,14,779.27 |
| 6 | White washing with lime to give an even shade : Old work (two or more coats) | 27,077.8 | Sqm | 22.85 | ₹6,18,727.73 |
| 7 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : One or more coats on old work | 5,182.12 | Sqm | 102.8 | ₹5,32,721.94 |
| 8 | Construction of Labour Rest Room (4.80*3.30)Sqm | - | - | - | - |
| 9 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m All kinds of soil. | 13.87 | Cum | 260.3 | ₹3,610.36 |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 2.81 | Cum | 6,812 | ₹19,141.72 |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.04 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
MTF.pdf
Tender Documents • 0.40 MB
BOQ_2231081.xls
BOQ • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .