Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-Finance JAMMU AND KASHMIR JK | ₹2.9 L | L1 | Accepted-Finance L1 |
| 2 | L2₹3.0 L+₹10,174.45 (3.57%)Accepted-Finance | ₹3.0 L+₹10,174.45 (3.57%) | L2 | Accepted-Finance L2 |
| 3 | L3₹3.7 L+₹84,949.14 (29.8%)Accepted-Finance | ₹3.7 L+₹84,949.14 (29.8%) | L3 | Accepted-Finance L3 |
| 4 | L4₹3.7 L+₹88,689.74 (31.1%)Accepted-Finance | ₹3.7 L+₹88,689.74 (31.1%) | L4 | Accepted-Finance L4 |
Tender Value
₹3.7 L
EMD Value
₹7,480
Closing Date
31 Aug 2026, 6:00 pmClosed
Executive Engineer
PWD (RandB) Division Udhampur
construction of lane by way of laying tile work from house of Sh. Virender singh to onwards at wno.9 kambal danga (phase 1st)
2026_PWDJK_322271_1
e-NIT 120 of 2026-27 Dated 24.08.2026
Open Tender
Civil Works
Percentage
30 days
Udhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD RandB Division Udhampur
₹7,480
18 Sept 2026
25 Aug 2026
1 Sept 2026
25 Aug 2026
31 Aug 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and
saplings of girth upto 30 cm measured at a height of 1 m above ground level and
removal of rubbish upto a distance of 50 m outside the periphery of the area cleared | - | SQM | 12.49 | - |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
1:5:10 (1 cement : 5 coarse sand : 10graded stone aggregate 40 mm nominal size) | - | CUM | 4,826.5 | - |
| - | Providing and laying factory made chamfered edge Cement Concrete
paver blocks in footpath, parks, lawns, drive ways or light traffic parking
etc, of required strength, thickness & size/ shape, made by table vibratory
method using PU mould, laid in required colour & pattern over 50mm
thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting
of paver blocks as per required size and pattern, finishing and sweeping extra sand complete all as per direction of Engineer-in-Charge. 80 mm thick C.C. paver block of M-30 grade with approved color design and pattern. | - | SQM | 929.85 | - |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size | - | CUM | 6,591.25 | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form work for:
Foundations, footings, bases for columns | 22 | SQM | 286.35 | ₹6,299.7 |
| - | Carriage of material by M.T incl loading/unloading & stacking complete Sand av lead 50 km | 14 | CUM | 741.14 | ₹10,375.96 |
| - | Carriage of material by M.T incl loading/unloading & stacking complete Stone agg Below 20 mm nominal size av lead 15km | 27 | CUM | 344.49 | ₹9,301.23 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
BOQ_1079505.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .