| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.1 LAccepted-Finance NAGLA SADASUKH GUNDAAU FIROZABAD | FIROZABAD | FIROZABAD | UTTAR PRADESH | ₹40.1 L | L1 | Accepted-Finance LOWEST-1 |
| 2 | L2₹43.6 L+₹3.5 L (8.82%)Rejected-Finance 0 WARD NO 9 PIPERTAR KATHAN KHAMARIA POLICE CHOWKI SANT RAVIDAS NAGAR UTTAR PRADESH 221306 | BHADOHI | UTTAR PRADESH | 221306 | ₹43.6 L+₹3.5 L (8.82%) | L2 | Rejected-Finance LOWEST-2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Document Not found as per requirement |
| 4 | Rejected-Technical | - | - | Rejected-Technical Documents Not found as per requirement |
| Sl No | Description | Qty | Unit | SHRI BALAJI CONSTRUCTION L2 | A R Construction L1 |
|---|---|---|---|---|---|
| 1.00 | Excavation in foundation in ordinary soil (Loam, Clay or Sand) including lift upto 1.50m and lead upto 30m and including filling watering and ranning of excavated earth into the trenches and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30m from the foundation trenches. | 624.79 | Cum | 76.11 ₹47,552.77 | 70 ₹43,735.3 Lowest |
| 2.00 | Provinding and laying lean cement concrete of M15 (1:2:4) mix for base conc as per approved drawing with approved quality of coarse sand of F.M. not less than 2.25 and 10-20 mm graded coarse aggregate including cost of all materials, labour charges, curing work, T&P etc. required for proper completion of the work in all conditions of site excluding dewatering. | 52.61 | Cum | 5,334.54 ₹2,80,650.15 | 4,850 ₹2,55,158.5 Lowest |
| 3.00 | Reinforced Cement Concrete work for Super structure of M 20 A 20 (1:1.5:3) mix coarse sand of F.M. not less than 2.25 and 20 mm graded coarse aggregate including cost of all materials, labour charges, curing work, T&P etc. but excluding supply of reinforcement and its bending and including its fixing and binding the same with 24 BWGI binding wire for proper completion of the work in all conditions. | 226.91 | Cum | 5,709 ₹12,95,429.19 | 5,200 ₹11,79,932 Lowest |
| 4.00 | Cement Concrete work for Super structure of M 20 A 20 (1:1.5:3) mix coarse sand of F.M. not less than 2.25 and 20 mm graded coarse aggregate including cost of all materials, labour charges, curing work, T&P etc. for proper completion of the work in all conditions. | 51.13 | Cum | 5,626.81 ₹2,87,698.8 | 5,100 ₹2,60,763 Lowest |
| 5.00 | Supplying and laying TMT Steel bar reinforcement as per approved drawing, including removal of rust, cutting, bending, binding, placement with proper overlapping, providing chairs etc. required. The item inclues cost of all material, labour charges, providing & binding with 24 BWG binding wire, T&P, taxes etc. required for proper completion of required work. | 12.23 | MT | 62,153.7 ₹7,60,139.75 | 58,000 ₹7,09,340 Lowest |
| 6.00 | Centring & Suttering for R.C.C. work including cost of centering & shuttering and nails etc complete up to 3M span. | 642.17 | Sqm | 639.32 ₹4,10,552.12 | 575 ₹3,69,247.75 Lowest |
| 7.00 | Centring and suttering for C.C. work including rent of shuttering material, labour and T&P required for proper completion of work for slab, lintal, sun shades, column & walls etc. | 105.32 | Sqm | 437.63 ₹46,091.19 | 390 ₹41,074.8 Lowest |
| 8.00 | Wall painting (two coat) with plastic emulsion paint of approved brand and manufacture on decorative wall surface to give an even shade including throughly brushing clean all of dirt, grease loose pieces and prepare smooth. | 63.57 | Sqm | 79.9 ₹5,079.24 | 70 ₹4,449.9 Lowest |
| 9.00 | Dismantling brick work or stone work and cement concrete in cement mortar and including srtacking of material with in a distance of 60 M as per direction of Engineer-in-charge. | 32.93 | Cum | 394.2 ₹12,981.01 | 360 ₹11,854.8 Lowest |
| 10.00 | Providing and fixing PVC pipe confirming to IS make working pressure 4 kg/ sqcm including testing labour T&P and all complete fittings (75 mm diameter) | 35 | Rmt | 159.83 ₹5,594.05 Lowest | 775 ₹27,125 |
Tender Value
₹57.3 L
EMD Value
₹1.1 L
Closing Date
24 Aug 2026, 3:00 pmClosed
S. E. I.W.C. Aligarh
25 Lal Diggi Aligarh
Reconstruction of the VRB (box culvert) at km 9.100 of the Binsiya Rajwaha, along with lining and restoration work extending 20 meters upstream and 20 meters downstream.
2026_UPIDC_1177154_5
04/SE/2026-27
Open Tender
Civil Works - Canal
Item Rate
270 days
Mainpuri
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,676
₹1.1 L
Yes
Office of the SE IWC Aligarh
8 Sept 2026
14 Aug 2026
24 Aug 2026
17 Aug 2026
24 Aug 2026
17 Aug 2026
17 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (Loam, Clay or Sand) including lift upto 1.50m and lead upto 30m and including filling watering and ranning of excavated earth into the trenches and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30m from the foundation trenches. | 1 | Cum | - | - |
| 2 | Provinding and laying lean cement concrete of M15 (1:2:4) mix for base conc as per approved drawing with approved quality of coarse sand of F.M. not less than 2.25 and 10-20 mm graded coarse aggregate including cost of all materials, labour charges, curing work, T&P etc. required for proper completion of the work in all conditions of site excluding dewatering. | 1 | Cum | - | - |
| 3 | Reinforced Cement Concrete work for Super structure of M 20 A 20 (1:1.5:3) mix coarse sand of F.M. not less than 2.25 and 20 mm graded coarse aggregate including cost of all materials, labour charges, curing work, T&P etc. but excluding supply of reinforcement and its bending and including its fixing and binding the same with 24 BWGI binding wire for proper completion of the work in all conditions. | 1 | Cum | - | - |
| 4 | Cement Concrete work for Super structure of M 20 A 20 (1:1.5:3) mix coarse sand of F.M. not less than 2.25 and 20 mm graded coarse aggregate including cost of all materials, labour charges, curing work, T&P etc. for proper completion of the work in all conditions. | - | Cum | - | - |
| 5 | Supplying and laying TMT Steel bar reinforcement as per approved drawing, including removal of rust, cutting, bending, binding, placement with proper overlapping, providing chairs etc. required. The item inclues cost of all material, labour charges, providing & binding with 24 BWG binding wire, T&P, taxes etc. required for proper completion of required work. | - | MT | - | - |
| 6 | Centring & Suttering for R.C.C. work including cost of centering & shuttering and nails etc complete up to 3M span. | 1 | Sqm | - | - |
| 7 | Centring and suttering for C.C. work including rent of shuttering material, labour and T&P required for proper completion of work for slab, lintal, sun shades, column & walls etc. | 1 | Sqm | - | - |
| 8 | Wall painting (two coat) with plastic emulsion paint of approved brand and manufacture on decorative wall surface to give an even shade including throughly brushing clean all of dirt, grease loose pieces and prepare smooth. | - | Sqm | - | - |
| 9 | Dismantling brick work or stone work and cement concrete in cement mortar and including srtacking of material with in a distance of 60 M as per direction of Engineer-in-charge. | 1 | Cum | - | - |
| 10 | Providing and fixing PVC pipe confirming to IS make working pressure 4 kg/ sqcm including testing labour T&P and all complete fittings (75 mm diameter) | - | Rmt | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
LOT05TD.pdf
Tender Documents • 1.09 MB
BOQ_2212191.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .