| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-cdr no attached |
Tender Value
₹2.9 L
EMD Value
₹5,820
Closing Date
8 Nov 2022, 4:30 pmClosed
ER GIAN SINGH
OFFICE OF THE EXECUTIVE ENGINEER REW RAMBAN MAITRA
AS PER THE NIT ATTACHED
2022_RDPR_194414_30
NIT NO 74 OF REW RAMBAN FRESH OF 60SBM 61ABDP
Open Limited
Civil Works
Item Wise
30 days
RAMBAN
AS PER THE NIT ATTACHED
2 documents required · 2 mandatory
₹600
EXECUTIVE ENGINEER REW RAMBAN MAITRA
₹5,820
19 Nov 2022
2 Nov 2022
9 Nov 2022
2 Nov 2022
8 Nov 2022
2 Nov 2022
Amount
Earth work in excavation by manual means in trenches for foundations, drains,(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. A). All kinds of soils
Earth work in excavation by manual means in trenches for foundations, drains,(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. A). All kinds of soils
Dry Stone pitching in horizontal position including all carriages and cost of stones complete
Providing and laying in position cement concrete (1:3:6)mix with 30% boulder in foundation &plinth using 20mm Nallah stone aggregate with leads and lifts complete job
Providing and laying in position cement concrete (1:3:6)mix in foundation &plinth using 20mm Nallah stone aggregate with leads and lifts complete job
RR Stone masonary with hard stones without bond styones in 1:6 cement:sand mix all complete inculding levelling with 1:6:12 mix at top.
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:2:4 mix.
Woodwork for frames doors ventiltors etc etc. fixed in position of imported wood
P/F of 35mm thick shutters for doors, windows, ventilators etc. of imported wood with all carriages complete.
Reinforcement for RCC work including straightening,cutting bending, placing in position and binding all complete upto plinth level Thermo Mechanical Treated bars including all carriges
Centring and shuttering including strutting propping etc. and removal of form for :-Foundations, footings, bases of columns etc for mass concrete
Suspended floors, roofs, landings, balconies and access platforms.
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
Edges (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
12mm Cement plaster on the Ceiling in :1 : 4 ( 1 cement : 4 fine sand)
40mm Cement concrete flooring in 1:2:4 mix
Providing/fixing of Glass panes of required thickness fixed with wooden beabong all complete.
Distempering withwashable distemper of approved brand and manufacture to give an even and smooth shade two or more coats on new work.
Providing and placing on terrace (at all floor levels) polyethylene water storage tank ISI:12701 marked,with cover and suitable locking arrangement
Provision for Sanitary Items and Electrification
Provision for Citizen Information board
ABDUL RASHID NAIK
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .