| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.6 LAccepted-AOC 42 A NEW WAZIR CHAND COLONY KARNAL HARYANA 132001 | KARNAL | HARYANA | 132001 | ₹20.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹21.3 L+₹74,018.80 (3.60%)Rejected-AOC | ₹21.3 L+₹74,018.80 (3.60%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | The Muktsar United Co Op L&C Society Ltd. L2 | BALJEET SINGH AND COMPANY L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | 179.62 | Cum | 34,307.42 ₹34,307.42 Lowest | 37,720.2 ₹37,720.2 |
| 2.00 | First class brick masonary laid in cement sand mortar 1.6 in foundation and plinth including supply recarriage of bricks cement . | 87.11 | Cum | 5,66,998.99 ₹5,66,998.99 | 5,47,137.91 ₹5,47,137.91 Lowest |
| 3.00 | 10mm thick cement plaster 1.4 on sides walls | 207.93 | sqm | 39,506.7 ₹39,506.7 Lowest | 39,506.7 ₹39,506.7 Lowest |
| 4.00 | 10mm thick cement plaster 1:4 on bed and top. | 86.19 | sqm | 12,583.74 ₹12,583.74 | 12,238.98 ₹12,238.98 Lowest |
| 5.00 | Reinforced cement concrete 1:2:4 hand mixed but including steel reinforcement | 1.9 | Cum | 17,837.2 ₹17,837.2 Lowest | 19,621.3 ₹19,621.3 |
| 6.00 | Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle | 26.87 | Cum | 1,61,354.35 ₹1,61,354.35 Lowest | 1,65,975.99 ₹1,65,975.99 |
| 7.00 | Cement concrete 1:4:8 with brick ballast 40mm gauge | 17.94 | Cum | 79,025.7 ₹79,025.7 Lowest | 86,919.3 ₹86,919.3 |
| 8.00 | Lowering, jointing of RCC NP-2 plain end pipes 350 mm dia laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect. | 2,206.56 | metre | 4,69,997.28 ₹4,69,997.28 | 4,01,593.92 ₹4,01,593.92 Lowest |
| 9.00 | jointing and cutting of RCC NP-2 plain end pipes 150 mm dia for vent pipe into Trenches and laying same to correct alignment as per IS 458:2003 | 62.5 | metre | 6,312.5 ₹6,312.5 | 5,375 ₹5,375 Lowest |
| 10.00 | Wrought Iron and mild steel ladders, framed grills, grating etc. complete fixed in position in D-tank | 0.8 | qtl | 8,677.6 ₹8,677.6 Lowest | 9,544.8 ₹9,544.8 |
Tender Value
Refer Docs
EMD Value
₹67,160
Closing Date
10 Nov 2025, 10:00 amClosed
Executive Engineer harike Canal Division Ferozepur
Executive Engineer harike Canal Division Ferozepur
ESTIMATE FOR LAYING OF UG PIPELINE OF O L R.D 17760 R OF 3R MINOR OF MUDKI DISTY OF VILLAGE KANIYANWALI,DISTT SRI MUKTSAR SAHIB.
2025_WR_138593_9
003/Harike Canal Division/2025-26
Open Tender
Civil Works
Item Wise
Executive Engineer harike Canal Division Ferozepur
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹67,160
3 Jul 2026
3 Nov 2025
10 Nov 2025
3 Nov 2025
10 Nov 2025
3 Nov 2025
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres.
First class brick masonary laid in cement sand mortar 1.6 in foundation and plinth including supply recarriage of bricks cement .
10mm thick cement plaster 1.4 on sides walls
10mm thick cement plaster 1:4 on bed and top.
Reinforced cement concrete 1:2:4 hand mixed but including steel reinforcement
Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle
Cement concrete 1:4:8 with brick ballast 40mm gauge
Lowering, jointing of RCC NP-2 plain end pipes 350 mm dia laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect.
jointing and cutting of RCC NP-2 plain end pipes 150 mm dia for vent pipe into Trenches and laying same to correct alignment as per IS 458:2003
Wrought Iron and mild steel ladders, framed grills, grating etc. complete fixed in position in D-tank
Providing & fixing M.S. foot rests made of 23x25 mm square bar including fixing in Haudis complete with cement concrete 1:2:4
Providing and fixing of Alfa Alfa Valve fitted on riser pipe to act as Nakka (D regulators)
Centreing &shuttering for Concerte faces
Providing & Fixing of Steel Shutter Gate Assembly in Main Pipeline complete in all respect
Dismantling of Brick work in Cement
Excavation by mechanical means (JCB or Hydraulic excavator) in trenches for pipelines with straight or open cutting in streets or open area including dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refilling consolidation, including the cost of diversion for traffic, crossing over trenches for access to the houses, watching, fencing,etc. and removal of surpluss oil out side/inside the town involving lead upto 15 meter complete in all respect.
The Muktsar United Co Op L&C Society Ltd. (BID ID -696566)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
SBD.pdf
Tender Documents • 0.73 MB
BOQ_310462.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .