| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹17.6 LAccepted-AOC | ₹17.6 L | 1 | Accepted-AOC AOC |
| 2 | 2₹18.3 LRejected-Finance | ₹18.3 L | 2 | Rejected-Finance Not Being Lowest |
| 3 | 3₹19.3 LRejected-Finance | ₹19.3 L | 3 | Rejected-Finance Not Being Lowest |
| Sl No | Description | Qty | Unit | M/s Maa Shitla Construction L2 | M/s Sanika Construction L3 | M/s BABU PRASAD TIWARI L1 |
|---|---|---|---|---|---|---|
| 1.00 | Dismanting of AC sheet including puling and battens & including stacking of dismantled materials within a distance of 60m (200) feet. | 33.08 | M2 | 60 ₹1,984.80 | 62 ₹2,050.96 | 35 ₹1,157.80 |
| 2.00 | Dismantling brick work | 7.96 | M3 | 55 ₹437.80 | 350 ₹2,786 | 45 ₹358.20 |
| 3.00 | Excavation of foundation in MKR soil i/c lift up to 1.5 m and lead up to 30 m i/c fiiling watering ramming of excavated earth into the tranches or up to the space & side of the foundation trenches or into the plinth & removal & disposal of sarplus earth as directed by engineer in charge. up to a distance of 30 m from the foundation trenches. | 22.43 | M3 | 55 ₹1,233.65 | 98 ₹2,198.14 | 125 ₹2,803.75 |
| 4.00 | earth work in filling i/c manual compaction. | 11.28 | M3 | 230 ₹2,594.40 | 90 ₹1,015.20 | 137 ₹1,545.36 |
| 5.00 | Laying local sand. | 8.37 | M3 | 1,350.23 ₹11,301.43 | 2,570 ₹21,510.90 | 950 ₹7,951.50 |
| 6.00 | C.C 1:4:8 in stone grit i/c curing and all labour and T&P for compleation of work. | 8.37 | M3 | 2,200 ₹18,414 | 4,870 ₹40,761.90 | 3,456 ₹28,926.72 |
| 7.00 | Centering & shuttering for R.C.C. slab lintels & simple beams work including all material & T&P etc. | 385.8 | M2 | 355.66 ₹1.4 L | 470 ₹1.8 L | 137 ₹52,854.60 |
| 8.00 | Providing & laying steel for reinforcement including cost of steel,labour for cutting,Bending placing in position & binding with G.I. wire with all T&P required for completion of work /M.T | 4,786.29 | Kg | 74.36 ₹3.6 L | 78 ₹3.7 L | 72 ₹3.4 L |
| 9.00 | C.C 1:2:4 in stone grit i/c curing and all labour and T&P for compleation of work. | 41.26 | M3 | 5,500 ₹2.3 L | 4,800 ₹2.0 L | 4,553 ₹1.9 L |
| 10.00 | Ist class B.W. 1:4 CM i/c curing and all labour and T&P for compleation of work. | 47.62 | M3 | 5,580 ₹2.7 L | 6,300 ₹3.0 L | 6,443 ₹3.1 L |
Tender Value
₹23.0 L
EMD Value
₹46,000
Closing Date
19 Nov 2025, 12:00 pmClosed
Executive Engineer
Office of The Executive Engineer, Lift Canal Division, Gwalior Road, Civil Lines, Jhansi
Reconstruction of Jiledari Office of Ist Sub Division Lift Canal Division Jhansi at Tubewell Circle premise Gwalior Road District Jhansi
2025_UPIDM_1088663_1
20/LCDJ/EE/2025-26
Open Tender
Civil Works
120 days
Jhansi
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹46,000
15 Dec 2025
13 Nov 2025
19 Nov 2025
13 Nov 2025
19 Nov 2025
13 Nov 2025
Amount
Dismanting of AC sheet including puling and battens & including stacking of dismantled materials within a distance of 60m (200) feet.
Dismantling brick work
Excavation of foundation in MKR soil i/c lift up to 1.5 m and lead up to 30 m i/c fiiling watering ramming of excavated earth into the tranches or up to the space & side of the foundation trenches or into the plinth & removal & disposal of sarplus earth as directed by engineer in charge. up to a distance of 30 m from the foundation trenches.
earth work in filling i/c manual compaction.
Laying local sand.
C.C 1:4:8 in stone grit i/c curing and all labour and T&P for compleation of work.
Centering & shuttering for R.C.C. slab lintels & simple beams work including all material & T&P etc.
Providing & laying steel for reinforcement including cost of steel,labour for cutting,Bending placing in position & binding with G.I. wire with all T&P required for completion of work /M.T
C.C 1:2:4 in stone grit i/c curing and all labour and T&P for compleation of work.
Ist class B.W. 1:4 CM i/c curing and all labour and T&P for compleation of work.
M.S angle iron door ,windows ventilation frame made of approved M.S ansle iron wrought to required form i/c driling hole ,welding and recetting where required & also i/c supply of all material, such as steel hinges of required size .nut bolts etc.& also i/c all wastage and one coat of red oxide paint complete in all respect as per direction of engineer incharge for proper compleation of work at site of work.
1:4 Cement Plaster 12.5 MM Thick i/c curing and all labour and T&P for compleation of work.
Providing & Laying ( White/ Colured) Kajariya tiles, Ramano tiles florring over 20mm hick base of cement morter 1:4 (1 Cement: 4 Coarse sand ) laid and jointed with white cement ( with pigment ) slurry including rubbing and polishing complete.
Internal Electrical Installation @ 12.50% (As per DSR, Sr No. 2.30, Page No. 4)
External Electrical Installation @ 3.75% + 4.0% Extra for Power wiring (As per DSR, Sr No. 2.2.1, Page No. 4)
Providing and fixing of sanitary items and plumbing work in wash area and rain water drainage pipe i/c all labour and T&P.
M/s Maa Shitla Construction (BID ID -5675817)
M/s Sanika Construction (BID ID -5686427)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.21 MB
BOQ_1997761.xls
BOQ • 0.23 MB
TenderDoc20.pdf
Tender Documents • 3.21 MB