Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹17.6 L
EMD Value
₹35,140
Closing Date
29 Jan 2025, 6:00 pmClosed
ASHWANI KUMAR
PD Narnaul
Special repair of Olympic Club Building at Narnaul in Mahendergarh District.
2025_HRY_425421_1
2025EAD18939 2CFC 4E6A B0C1 DFF666502803649BAR
Open Tender
Civil Works
Works
30 days
Narnaul
Special repair of Olympic Club Building at Narnaul in Mahendergarh District.
2 documents required · 2 mandatory
₹1,000
₹35,140
Yes
10 Feb 2025
22 Jan 2025
30 Jan 2025
22 Jan 2025
29 Jan 2025
22 Jan 2025
Amount
[11.5.4]12 mm cement plaster of mix : 4. 1:6 (1 cement: 6 fine sand)
[11.68.3]Applying priming coat: 3. With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works
[11.84.1]Painting over the wooden/metal surface with aluminium paint of approved brand and manufacture to give an even shade . 1. Two or more coats on new work
[11.93.1]Finishing walls with water proofing cement paint of required shade : 1. New work (Two or more coats applied @ 3.84 kg/10 sqm)
[23.22.1.11]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 1.11. Supply and erection of Modular case circuit breaker single pole/4 pole on existing wall/pedestal/Panel including bounding to earth and making necessary connections required to complete the job in all respect up to the entire satisfaction of the Engineer-in-charge of the work. 4 pole MCCB 200 to 250 amp, 25 KA
[23.22.1.3]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 1.3. Supply and erection of Modular case circuit breaker single pole/4 pole on existing wall/pedestal/Panel including bounding to earth and making necessary connections required to complete the job in all respect up to the entire satisfaction of the Engineer-in-charge of the work. TRIPLE POLE MCCB 16 to 100 Amp, 25 KA
[23.22.4.5]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 4.5. Supply and erection of double door sheet steel enclosure distribution board suitable for MCBS and ELCBS etc. recessed in wall including bonding to earth with all labour and material required to complete the job in all respect up to the entire satisfaction of the Engineer-in-Charge of the work. TPN DB Horizontal type Double Door 4 way ( 8 incoming and 3phase*4 outgoing)
[23.22.5.1]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 5.1. Supply and erection of miniature circuit Breaker 240/415 V in the existing distribution board including making necessary connections:- 6 amp. to 32 amp Single Pole
[23.22.5.6]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 5.6. Supply and erection of miniature circuit Breaker 240/415 V in the existing distribution board including making necessary connections:- 40 amp to 63 amp. MCBs TRIPLE POLE
[24.14.14]LT CABLES (Aluminium Conductor, Armoured and Unarmoured) PROVIDING& ERECTION/ LAYING OF PVC/ XLPE INSULATED UNDERGROUND ALUMINIUM CONDUCTOR UNDERGROUND CABLE ONSURFACE/ EXISTING CABLE TRAY COMPLETE IN ALL RESPECT WITH NECESSARY CONNECTION UPTO THE ENTIRE SATISFACTION OF ENGINEER IN CHARGE OF THE WORK 14. 10 Sq mm 2core (Arm.)
[24.14.30]LT CABLES (Aluminium Conductor, Armoured and Unarmoured) PROVIDING& ERECTION/ LAYING OF PVC/ XLPE INSULATED UNDERGROUND ALUMINIUM CONDUCTOR UNDERGROUND CABLE ONSURFACE/ EXISTING CABLE TRAY COMPLETE IN ALL RESPECT WITH NECESSARY CONNECTION UPTO THE ENTIRE SATISFACTION OF ENGINEER IN CHARGE OF THE WORK 30. 25 Sq mm 3.5 core (Arm.)
[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil
[4.32]Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
[6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
[6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)
[6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
[6.16]Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).
[6.30.1]Centering and shuttering including strutting, propping etc. and removal of form for 1. Foundations, footings, bases of columns, etc. for mass concrete
[6.30.5]Centering and shuttering including strutting, propping etc. and removal of form for 5. Lintels, beams, plinth beams, girders, bressumers and cantilevers
[6.30.6]Centering and shuttering including strutting, propping etc. and removal of form for 6. Columns, Pillars, Piers, Abutments, Posts and Struts
[6.34.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more.
[7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand)
[7.22.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 1. Cement mortar 1:4 (1 cement : 4 coarse sand)
Badminton court mat Yonex AC364 (BWF approved Grade-1) of green colour having a thickness of 4.5 mm of material PVC Vinyl material with Dimension of one court 15.4 meter x 7.4 meter of mass of 325 kilogram pasted over eva cushion with a thickness of 6mm including preparation of existing surface before pasting also including marking of white colour
JETALEGANZAFLS120WLED730P60DTOTG MAKE: Havells
SQUASH COURTS– Supply and Installation of “Ricochet Sports“ Wooden Flooring System Maple wood Flooring Specification 1. 21mm Imported Maple Wood Flooring 2. 70x45mm Pine Runner Random Length Anti Treated Sleeper 3. 10/19mm Air Crush Rubber Pad Specification of Wooden flooring Surface board – MAPLE WOOD SPORTS FLOORING “Certified by the “BWF APPROVED” (Badminton World Federation) according to BWF standards Approved Level 1A and 1B” finishing with 21mm thick, 53 to 93 mm wide and in random length in tongue and groove shape. The edges of the boards should have finger lock groove and the bottom side with air pass groove. The under frame - Made of pine wood runners of 70mmx45mm, treated with anti-termite solution and fixed on the bottom side with 10/19mm thick Rubber air cushioned pads, stappled through the two wings at 300mmx300mm. Installation - IPS subfloor treated with a vapour barrier to be placed on the leveled IPS sub floor before laying the under frame. the runners having air cushion pads to be placed on the vapour barrier in perfect level at 350mm in 1 direction Finish - The surface board to be screwed to the runner through the tongue only and will lock the screwed tongue by the groove of adjoining board. ends of the boards will be locked by inserting the wooden fingers through the edge grooves and fixed with suitable adhesive. an expansion of 15 to 20 mm to be left open between the wooden flooring the surrounding tiled area / walls. finishing - After installation the floor will be machine sanded in uniform level and finishing with P.U. POLISHING water based polyurethane lacquer . Game line marking to be carried out in required colors before applying the finishing coat
THE BABA BALACK NATH CO OP L AND C SOCIETY LTD (BID ID -1208365)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .