Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.9 LAdmitted-Fee/PreQual/Technical/Finance | ₹16.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹18.1 L+₹1.2 L (7.02%)Admitted-Fee/PreQual/Technical/Finance | ₹18.1 L+₹1.2 L (7.02%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹19.1 L+₹2.2 L (13.0%)Admitted-Fee/PreQual/Technical/Finance | ₹19.1 L+₹2.2 L (13.0%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹19.2 L+₹2.3 L (13.9%)Admitted-Fee/PreQual/Technical/Finance | ₹19.2 L+₹2.3 L (13.9%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | SSD & CO L2 | THANYA PROJECTS L3 | S K G CONSTRUCTION L1 | Sri Vinayaga & Co L4 |
|---|---|---|---|---|---|---|---|
| 2.00 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting in- clusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. | 61 | Cum | 180 ₹10,980 | 200 ₹12,200 | 100 ₹6,100 Lowest | 180 ₹10,980 |
| 3.00 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 340 | cum | 700 ₹2,38,000 | 500 ₹1,70,000 | 400 ₹1,36,000 Lowest | 500 ₹1,70,000 |
| 4.00 | Supplying and filling in foundation, basement, etc with filling Crushed Stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 8.5 | cum | 2,050 ₹17,425 | 1,800 ₹15,300 | 1,500 ₹12,750 Lowest | 1,780 ₹15,130 |
| 5.00 | Providing , Laying Spreading and compacting graded stone aggregate for Wet Mix Macadam 25mm thick , including premixing the materials with water at OMC in mechanical mix plant conveyance of mixed materials by tipper to site , laying in uniform layers using pavers in sub-base / base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of materials , labour charges, rentals for machinery , fuel and all other incidental charges etc., Complete as per clause 406 of Morth | 79 | cum | 2,200 ₹1,73,800 | 2,600 ₹2,05,400 | 1,500 ₹1,18,500 Lowest | 2,430 ₹1,91,970 |
| 6.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers - Mixing by mechanical means | 8.5 | cum | 6,000 ₹51,000 | 5,400 ₹45,900 | 3,500 ₹29,750 Lowest | 5,130 ₹43,605 |
| 7.00 | Brick work in following Cement Mortar using best quality Burnt Clay Brick of size 8 3/4" x 4 1/4" x 2 3/4" with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. A). For Foundation & Basement | 21 | Cum | 9,000 ₹1,89,000 | 7,300 ₹1,53,300 | 4,500 ₹94,500 Lowest | 6,310 ₹1,32,510 |
| 8.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner, vertical stiffener, side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid) | 67 | sqm | 900 ₹60,300 | 700 ₹46,900 | 400 ₹26,800 Lowest | 680 ₹45,560 |
| 9.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including Super Plasticiser, mixing charges for machine mix,laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers - machine mix A).For Foundation & Basement | 12 | cum | 8,000 ₹96,000 | 8,500 ₹1,02,000 | 6,500 ₹78,000 Lowest | 8,160 ₹97,920 |
| 10.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) | 10 | qtl | 8,000 ₹80,000 Lowest | 9,000 ₹90,000 | 9,000 ₹90,000 | 8,690 ₹86,900 |
| 11.00 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers. | 126 | sqm | 250 ₹31,500 | 280 ₹35,280 | 200 ₹25,200 Lowest | 250 ₹31,500 |
Tender Value
₹20.3 L
EMD Value
₹20,500
Closing Date
16 Sept 2026, 3:00 pmClosed
Joint Commissioner/Executive Officer
Joint Commissioner/Executive Officer, Head Office, Arulmigu Dhandayuthapani Swamy Temple, Palani
PROVIDING APPROACH ROAD (BBA CLASS ROOM TO NEW LIBRARY BUILDING) ARRANGEMENT FOR CONSTRUCTION OF LIBRARY BUILDING AND CLASS ROOM BUILDING AT ARULMIGU PALANI ANDAVAR ARTS AND CULTURE COLLEGE AT PALANI, DINDIGUL DISTRICT
2026_HRCE_699284_1
1/2026-2027-7
Open Tender
Civil Works
Works
120 days
Palani
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹20,500
16 Sept 2026
29 Aug 2026
16 Sept 2026
29 Aug 2026
16 Sept 2026
1 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting in- clusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. | 61 | Cum | - | - |
| 3 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 340 | cum | - | - |
| 4 | Supplying and filling in foundation, basement, etc with filling Crushed Stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 8.5 | cum | - | - |
| 5 | Providing , Laying Spreading and compacting graded stone aggregate for Wet Mix Macadam 25mm thick , including premixing the materials with water at OMC in mechanical mix plant conveyance of mixed materials by tipper to site , laying in uniform layers using pavers in sub-base / base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of materials , labour charges, rentals for machinery , fuel and all other incidental charges etc., Complete as per clause 406 of Morth | 79 | cum | - | - |
| 6 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers - Mixing by mechanical means | 8.5 | cum | - | - |
| 7 | Brick work in following Cement Mortar using best quality Burnt Clay Brick of size 8 3/4" x 4 1/4" x 2 3/4" with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. A). For Foundation & Basement | 21 | Cum | - | - |
| 8 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner, vertical stiffener, side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid) | 67 | sqm | - | - |
| 9 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including Super Plasticiser, mixing charges for machine mix,laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers - machine mix A).For Foundation & Basement | 12 | cum | - | - |
| 10 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) | 10 | qtl | - | - |
| 11 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers. | 126 | sqm | - | - |
stage.html
html • 0.02 MB
finance_840636.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
BBAclassRoomBookled.pdf
Tender Documents • 0.93 MB
BOQ_840636.xls
BOQ • 0.28 MB
5483Drawings.pdf
Additional Documents • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .