Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC | ₹1.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.5 L+₹2,055 (1.35%)Rejected-AOC | ₹1.5 L+₹2,055 (1.35%) | L2 | Rejected-AOC L2 |
| 3 | L3₹1.5 L+₹2,934.83 (1.93%)Rejected-AOC | ₹1.5 L+₹2,934.83 (1.93%) | L3 | Rejected-AOC L3 |
| 4 | L4₹1.6 L+₹7,019.90 (4.62%)Rejected-AOC | ₹1.6 L+₹7,019.90 (4.62%) | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | Jagannath prasad L3 | SHIV OM CONTRACTOR L1 | MOTI LAL CONSTRUCTION L2 | SAMUNDRA SINGH L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Uprooting Jhunds and Moonj With Disposal away From Site | 364 | sqm | 26.07 ₹9,489.48 Lowest | 28 ₹10,192 | 28 ₹10,192 | 27.3 ₹9,937.2 |
| 2.00 | Silt Clearance/trench Digging with slush including Lift Upto 1.5m and lead upto 6m, including cost of Driver/Assistant driver, POL, Maintenance of machine, contractor profit, taxes atc but excluding leveling, dressing & compaction. a) By Hydraulic excavator/JCB/equivalent capacity 25 cum/hour ie. 1000/25. (Rs. 1000 per hour Rough/Partial Dressing (especially in case of Drains) | 2,055 | cum | 70.77 ₹1,45,432.35 | 69 ₹1,41,795 Lowest | 70 ₹1,43,850 | 72.54 ₹1,49,069.7 |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
11 May 2026, 5:00 pmClosed
EE UDAC Mathura
EE UDAC Mathura
LOT15
2026_UPIDC_1145472_15
01/EE/2026-27
Open Tender
Civil Works
Piece-work
15 days
EE UDAC Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹177
₹5,000
Yes
21 Jul 2026
6 May 2026
12 May 2026
6 May 2026
11 May 2026
6 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Uprooting Jhunds and Moonj With Disposal away From Site | 364 | sqm | - | - |
| 2 | Silt Clearance/trench Digging with slush including Lift Upto 1.5m and lead upto 6m, including cost of Driver/Assistant driver, POL, Maintenance of machine, contractor profit, taxes atc but excluding leveling, dressing & compaction. a) By Hydraulic excavator/JCB/equivalent capacity 25 cum/hour ie. 1000/25. (Rs. 1000 per hour Rough/Partial Dressing (especially in case of Drains) | 2,055 | cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.92 MB
BOQ_2141693.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .