Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.0 LAccepted-AOC 107 2 AMPA MANOR IST FLOOR NELSON MANICKAM ROAD AMINJIKARAI CHENNAI 0 600 029 NO 107 2 AMPA MANOR 1ST FLOOR NELSON MANICKAM ROAD AMINIJIKARAI AMINJIKARAI | 1 | Accepted-AOC L-1 after negotiation | |
| 2 | 2₹14.0 L+₹4.0 L (40.5%)Rejected-Finance B 71 ASHISH ROW HOUSE 395009 RANDER SURAT GUJARAT 395009 | SURAT | GUJARAT | 395009 | 2 | Rejected-Finance L-2 | |
| 3 | 3₹14.7 L+₹4.7 L (47.3%)Rejected-Finance | 3 | Rejected-Finance L-3 | |
| 4 | Rejected-Technical | - | Rejected-Technical commercially Rejected |
Tender Value
Refer Docs
Closing Date
10 Jan 2022, 3:00 pmClosed
GM(T)
SRPL Chennai
ANNUAL MAINTENANCE CONTRACT FOR PACKAGE/ CASSETTE /SPLIT ACs AT SRPL ASANUR.
2021_SRCHN_143916_1
SRP21TS046
Open Tender
Electrical Works
Works
365 days
SRPL ASANUR
Please refer Tender documents.
6 documents required · 6 mandatory
Exempted
17 May 2022
7 Dec 2021
11 Jan 2022
7 Dec 2021
10 Jan 2022
14 Dec 2021
Amount
Package ACs service items Part 1
Pressure Testing, Leak arresting of 5.5TR Unit- In case of any leakage in the circuit, Nitrogen pressure to be injected in the circuit for checking the leakage in the circuit. After detecting the leakage location, brazing of copper pipes to be carried out such that the leakage is arrested. Brazing to be carried out with Oxygen and Acetylene cylinder brazing set. No LPG Brazing set is allowed. After leak is arrested, Nitrogen pressure to be injected in the circuit at 250-300 psi and observe for 12 hours for confirming that the leakage was arrested. Vaccumising of the circuit to be carried out for 2 hours and R-22 gas to be charged in the circuit. The pressure of the charged circuit to be maintained at 60 psi and to be shown to Engineer-In-Charge. Line Item includes fixing of supplied Outdoor Unit assembly, Indoor coil, Copper pipe, Drier, Expansion Valve, Pressure Gauge, Compound Gauge and Compressor. Supply of R-22 gas, Outdoor Unit assembly, Indoor coil, Copper pipe, Drier, Expansion valve and Compressor will be paid seperately as per Line Items in the SOR.
Servicing of 11 TR ACs- Carrying out periodic preventive maintenance of the air conditioners as per the direction of the Engineer-In-Charge /Site Engineer including washing with water / detergent, filter cleaning, coil cleaning, checking of electrical wiring, current, gas pressure, replacement of components as required etc. so as to maintain the ACs in good working condition. During maintenance, all parts of the AC has to be monitored regularly and in case of non-functioning of any parts, the same has to be informed to Engineer-In-Charge. The Periodic preventive maintenance shall be carried out every quarter. The maintenance report to be submitted to the Engineer-In-Charge, indicating the functioning of all parts. In case of Breakdown of Package AC unit within 3 months, the breakdown has to be attended within 24 hours and no extra cost will be charged.The supplied Contactor, OLR,PCB, Belt, Blower shaft, Blower Bearing and HPLP Trip switch of Package AC Units has to be fixed during breakdown. The supply of Contactor, OLR,PCB, Belt, Blower shaft, Blower Bearing and HPLP Trip switch will be paid seperately as per Line Items in SOR
Removal of old fan motor in the Indoor Unit and fixing new motor
Removal, Rewinding of Blower Motor and fixing of Blower Motor
Supply of Fan Motor for Outdoor units for 5.5TR
Supply of Copper Pipe 7/8 Inch
Supply of Drier (5.5 TR)
Supply of Expansion Valve (5.5 TR)
Supply of Compressor (5.5 TR)
Supply of Belt
Supply of Blower bearing (5.5 TR)
Supply of blower Shaft (5.5 TR)
Supply of Contactor
Supply of OLR
Supply of HPLP Trip switch
Supply of Pressure gauge in the suction and discharge lines of Package AC circuit (11.0 TR)
Supply of Compound gauge in the suction and discharge lines of Package AC circuit (11.0 TR)
Supply of PCB (5.5 TR)
Supply of Fan blade
Package Acs service Items Part 2
Supply of Indoor coil (5.5 TR x 2)
Supply of Outdoor unit assembly (5.5 TR )
Cassette ACs Service Items Part 1
Pressure Testing, Leak arresting of 3.0 TR Unit- In case of any leakage in the circuit, Nitrogen pressure to be injected in the circuit for checking the leakage in the circuit. After detecting the leakage location, brazing of copper pipes to be carried out such that the leakage is arrested. Brazing to be carried out with Oxygen and Acetylene cylinder brazing set. No LPG Brazing set is allowed. After leak is arrested, Nitrogen pressure to be injected in the circuit at 250-300 psi and observe for 12 hours for confirming that the leakage was arrested. Vaccumising of the circuit to be carried out for 2 hours and R-22 gas to be charged in the circuit. The pressure of the charged circuit to be maintained at 60 psi and to be shown to Engineer-In-Charge. Line Item includes fixing of supplied Outdoor Unit assembly, Indoor coil, Copper pipe, Drier, Expansion Valve, Pressure Gauge, Compound Gauge and Compressor. Supply of R-22 gas, Outdoor Unit assembly, Indoor coil, Copper pipe, Drier, Expansion valve and Compressor will be paid seperately as per Line Items in the SOR.
Servicing of 3.0 TR ACs- Carrying out periodic preventive maintenance of the air conditioners as per the direction of the Engineer-In-Charge /Site Engineer including washing with water / detergent, filter cleaning, coil cleaning, checking of electrical wiring, current, gas pressure, replacement of components as required etc. so as to maintain the ACs in good working condition. During maintenance, all parts of the AC has to be monitored regularly and in case of non-functioning of any parts, the same has to be informed to Engineer-In-Charge. The Periodic preventive maintenance shall be carried out every quarter. The maintenance report to be submitted to the Engineer-In-Charge, indicating the functioning of all parts. In case of Breakdown of Package AC unit within 3 months, the breakdown has to be attended within 24 hours and no extra cost will be charged.The supplied Contactor, OLR,PCB, Belt, Blower shaft, Blower Bearing and HPLP Trip switch of Cassettee AC Units has to be fixed during breakdown. The supply of Contactor, OLR,PCB, Belt, Blower shaft, Blower Bearing and HPLP Trip switch will be paid seperately as per Line Items in SOR
Removal of old fan motor in the Indoor Unit and fixing new motor
Removal, Rewinding of Blower Motor and fixing of Blower Motor
Supply of Copper Pipe 1/2 Inch
Supply of Copper Pipe 5/8 Inch
Supply of Blower bearing (3.0 TR)
Supply of Blower Shaft (3.0 TR)
Supply of Indoor Fan capacitor (3.0 TR)
Supply of Fan Motor for Outdoor units for 3TR
Supply of Fan Blade for Outdoor units for 3TR
Supply of Compressor (3.0 TR)
Supply of Coil Sensor (3.0 TR)
Supply of Room Sensor (3.0 TR)
Supply of Indoor PCB (3.0 TR)
Supply of Outdoor PCB (3.0 TR)
Cassette ACs service Items Part 2
Supply of Indoor coil (3.0 TR)
Supply of Outdoor unit assembly (3.0 TR)
AC servicing common items for package and cassette Acs
Supply of R-22 Gas
Comprehensive AMC for 1.5 TR Split AC units( 20 No) for one year
Comprehensive AMC for 2 TR Split/Casette AC Units (3 No) for one year
SURAJ SALES CORPORATION
GENIUS AIRCON PVT LTD
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .