Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹22.3 L+₹1.9 L (9.11%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹22.8 L+₹2.3 L (11.4%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹22.8 L+₹2.4 L (11.7%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹24.0 L+₹3.5 L (17.4%)Rejected-AOC | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | BHUPENDRA KUMAR L6 | M/s BABU PRASAD TIWARI L5 | M/S RAJKIRAN CONSTRUCTION L1 | M/S PRADEEP KUMAR SHUKLA L4 | SHRI SAI ASSOCIATES L2 | M/S RADHIKA RAMAN YADAV THEKEDAR L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | E/W in Excavation in foundation in Mar, rankar and , kankar mixed soils i/c cost of all lead & lift, labour, T&P etc. complete.As per directed by Engineer- in - Charge. | 233.46 | Cum | 194.5 ₹45,407.97 | 87 ₹20,311.02 | 50 ₹11,673 Lowest | 80 ₹18,676.8 | 67 ₹15,641.82 | 70 ₹16,342.2 |
| 2.00 | P/L P.C.C. 1:3:6 for Boundary wall foundation i/c cost of all lead & lift, material, labour, T&P etc. complete.As per directed by Engineer- in - Charge. | 38.91 | Cum | 2,999 ₹1,16,691.09 | 3,876 ₹1,50,815.16 | 3,400 ₹1,32,294 | 2,500 ₹97,275 Lowest | 3,050 ₹1,18,675.5 | 3,200 ₹1,24,512 |
| 3.00 | Supplying and laying R.C.C. 1:2:4 in column including cost of all labour, material, T&P, lead, lift etc. complete as per directed by Engineer -in - Charge. | 35.27 | Cum | 4,349 ₹1,53,389.23 | 5,442 ₹1,91,939.34 | 3,800 ₹1,34,026 Lowest | 3,800 ₹1,34,026 Lowest | 4,090 ₹1,44,254.3 | 4,600 ₹1,62,242 |
| 4.00 | Providing centering and shuttering including cost of all labour, material, T&P, lead, lift etc. complete as per directed by Engineer -in - Charge | 337.5 | Sqm | 198 ₹66,825 | 196 ₹66,150 | 30 ₹10,125 | 10 ₹3,375 Lowest | 190 ₹64,125 | 180 ₹60,750 |
| 5.00 | Providing and laying reinforcement steel in coping including all cost of labour material carriage cutting binding with GI wire andplacing etcAs per directed by Engineer- in - Charge . | 1.44 | MT | 69,780 ₹1,00,483.2 | 58,000 ₹83,520 | 55,000 ₹79,200 | 70,000 ₹1,00,800 | 60,178 ₹86,656.32 | 5,700 ₹8,208 Lowest |
| 6.00 | R.R. stone masonary in foundation wall in 1:4 cement, Coarse sand mortar, including all lead and lift, Labour , Material, T&P etc. As per directed by Engineer- in - Charge | 156.13 | Cum | 3,245 ₹5,06,641.85 | 3,223 ₹5,03,206.99 Lowest | 3,700 ₹5,77,681 | 3,500 ₹5,46,455 | 3,800 ₹5,93,294 | 3,800 ₹5,93,294 |
| 7.00 | Ist class brick masonary in 1:4 with cement sand mortar including all cost of labour, material,T&P etc. As per directed by Engineer- in - Charge. | 206.98 | Cum | 5,490 ₹11,36,320.2 | 5,442 ₹11,26,385.16 | 4,325 ₹8,95,188.5 Lowest | 5,500 ₹11,38,390 | 4,800 ₹9,93,504 | 5,600 ₹11,59,088 |
| 8.00 | 12.5 mm thick plaster in 1:4 with cement sand mortar on brick masonary including all cost of labour, material,T&P , etcAs per directed by Engineer- in - Charge | 2,025.89 | Sqm | 184 ₹3,72,763.76 | 126 ₹2,55,262.14 | 100 ₹2,02,589 | 120 ₹2,43,106.8 | 105 ₹2,12,718.45 | 75 ₹1,51,941.75 Lowest |
Tender Value
₹32.7 L
EMD Value
₹3.3 L
Closing Date
19 Aug 2025, 6:00 pmClosed
Executive Engineer, Matatila Dam Division,Jhansi
Executive Engineer, Matatila Dam Division,Jhansi
Construction of Boundary wall in R/B Colony campus of Matatila dam.
2025_UPIDC_1063667_1
02/EE/Matatila/2025-26
Open Tender
Civil Works
Item Rate
90 days
Matatila Talbehat
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,390
₹3.3 L
30 Aug 2025
7 Aug 2025
20 Aug 2025
7 Aug 2025
19 Aug 2025
7 Aug 2025
Amount
E/W in Excavation in foundation in Mar, rankar and , kankar mixed soils i/c cost of all lead & lift, labour, T&P etc. complete.As per directed by Engineer- in - Charge.
P/L P.C.C. 1:3:6 for Boundary wall foundation i/c cost of all lead & lift, material, labour, T&P etc. complete.As per directed by Engineer- in - Charge.
Supplying and laying R.C.C. 1:2:4 in column including cost of all labour, material, T&P, lead, lift etc. complete as per directed by Engineer -in - Charge.
Providing centering and shuttering including cost of all labour, material, T&P, lead, lift etc. complete as per directed by Engineer -in - Charge
Providing and laying reinforcement steel in coping including all cost of labour material carriage cutting binding with GI wire andplacing etcAs per directed by Engineer- in - Charge .
R.R. stone masonary in foundation wall in 1:4 cement, Coarse sand mortar, including all lead and lift, Labour , Material, T&P etc. As per directed by Engineer- in - Charge
Ist class brick masonary in 1:4 with cement sand mortar including all cost of labour, material,T&P etc. As per directed by Engineer- in - Charge.
12.5 mm thick plaster in 1:4 with cement sand mortar on brick masonary including all cost of labour, material,T&P , etcAs per directed by Engineer- in - Charge
SHRI SAI ASSOCIATES (BID ID -5436662)
M/S RADHIKA RAMAN YADAV THEKEDAR (BID ID -5459136)
M/S PRADEEP KUMAR SHUKLA (BID ID -5448456)
M/s BABU PRASAD TIWARI (BID ID -5451444)
BHUPENDRA KUMAR (BID ID -5449900)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .