Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC | ₹1.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.8 LRejected-AOC | ₹1.8 L | L2 | Rejected-AOC L2 |
Tender Value
₹1.5 L
EMD Value
₹1,536
Closing Date
15 Jul 2026, 2:00 pmClosed
SHYAM
W.S. Divn. Tohana
.Estimate for Providing additional manholes for the existing sewer pipeline in canal colony, Tohana.
2026_HRY_534339_1
202655E29A30 8038 41B3 BA49 9EAAB1F3D870167IRR
Open Tender
Civil Works
Works
90 days
Tohana
2 documents required · 2 mandatory
₹500
₹1,536
Yes
27 Jul 2026
8 Jul 2026
15 Jul 2026
8 Jul 2026
15 Jul 2026
8 Jul 2026
8 Jul 2026 - 9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [11.5.4]12 mm cement plaster of mix : 4. 1:6 (1 cement: 6 fine sand) | 105.6 | Sqm | 104 | ₹10,982.4 |
| 2 | [15.5]PCC 1:3:6 in Foundation Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days as per clause 2100 of MORT&H specifications | 4.2 | cum | 3,464 | ₹14,548.8 |
| 3 | [4.42]Earth work excavation in ordinary soil exclusive of compensation of earth. Kassi work undressed involving an average horizontal through upto 2 metres, and an average vertical lift upto 0.5 metre. including breaking of clods. | 42.45 | cum | 70 | ₹2,971.5 |
| 4 | [6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 1.9 | cum | 4,374 | ₹8,310.6 |
| 5 | [6.36.1]Steel reinforcement for R.C.C. work ready to use `cut and bend` rebars of approved make from factory/workshop to construction site including placing in position and binding all complete above plinth level. 1. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 170 | Kg. | 65 | ₹11,050 |
| 6 | [7.20.2]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement Mortar 1:6 (1 cement : 6 coarse sand) | 25.5 | cum | 4,146 | ₹1,05,723 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_613419.xls
BOQ • 0.33 MB
AD0171858.pdf
Additional Documents • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].