Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.1 LAccepted-AOC GEVRA BASTI KUSMUNDA DISTT KORBA 495447 C G | KORBA | CHHATTISGARH | 495447 | L1 | Accepted-AOC Techno-commercially accepted by TC and approved by GM | |
| 2 | Rejected-Technical | - | Rejected-Technical Rejected being L2 bidder |
Tender Value
₹43.1 L
EMD Value
₹54,000
Closing Date
9 May 2023, 11:00 amClosed
STAFF OFFICER (EandM),SECL KUSMUNDA AREA
OFFICE OF THE STAFF OFFICER (EandM),SECL KUSMUNDA AREA P.O.KUSMUNDA COLLIERY 495454 DISTT. KORBA (CG)
Assistance in major shutdown/preventive/ breakdown mechanical maintenance works at various locations of conveyors, 20,000 Te. Bunker and TRS-1 sections of New CHP phase-1 and AC-4 Feeder Breaker for a period of 365 days on as and when required basis
2023_SECL_277589_1
SECL/GM/KSM/EnM/ eTender/23-24/03 dtd 21.04.2023
Open Tender
Miscellaneous Works
Item Rate
365 days
KUSMUNDA OPEN CAST PROJECT
Please refer Tender documents.
5 documents required · 5 mandatory
₹54,000
12 Jun 2023
21 Apr 2023
10 May 2023
21 Apr 2023
9 May 2023
22 Apr 2023
22 Apr 2023 - 28 Apr 2023
Amount
Scope/Nature of Work:- 1. The work will be taken up as and when required basis on a very short notice subjected to availability and shutdown of circuits. 2. The Welding electrode, industrial gas, other consumables will be provided by the department. 3. The working site may be dusty & mucky. 4. For installation of drive units/other sub-assembling, desired preparation should be done. 5. Work should be carried out as per existing design. 6. The repairing/maintenance work carried out on site will be as per instruction of Engineer I/C. 7. All tools, tackles & safety standards to engaged personnel will be provided by the Contractor.
Dismantling/disassembling/handling job in major shutdown/ preventive/ breakdown mechanical maintenance works:- Dismantling/ lowering of counter weights, dismentling/lowering of idlers and idler frames, pulling of damaged/ existing steel cord belt/ rubber belt, dismantling and disassembly of damaged assembly/ sub-assembly, pulleys, rolling elements, drive units, conveyor take up units etc. and other allied works at various locations of conveyors, bunker & TRS-1 at New CHP phase-1. Dismentling of crusher roll (primary/secondary), bearing blocks, bearings, shear hubs and allied works at AC-4 Feeder Breaker.
Assembling/ Installation/handling job in major shutdown/ preventive/ breakdown mechanical maintenance work:- Handling of counter weights, mounting of idlers and idler frames, laying/ placing/ positioning of new steel cord/ rubber belt, re-installation/ re-erection, setting of new/ repaired assembly/ sub-assembly, pulleys, rolling elements, drive units, conveyor take up units etc. & other allied works at various locations of conveyors, bunker & TRS-1 at New CHP phase-1. Fitting of crusher roll (primary/secondary), bearing blocks, bearings, shear hubs and allied works at AC-4 Feeder Breaker.
Total impact of GST for the purpose of CTC
Hems Corporation
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .