Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-2₹1.5 Cr+₹85,682.77 (0.58%)Accepted-AOC | ₹1.5 Cr+₹85,682.77 (0.58%) | L-2 | Accepted-AOC L-1 |
| 2 | L-1₹1.5 CrNot Admitted-Technical VILU TULSIPUR POST MOTIGANJ GONDA | GONDA | UTTAR PRADESH | 271001 | ₹1.5 Cr | L-1 | Not Admitted-Technical Not Qualified |
| 3 | L-4₹1.5 Cr+₹2.6 L (1.73%)Rejected-Finance GONDA | UTTAR PRADESH | 271305 | ₹1.5 Cr+₹2.6 L (1.73%) | L-4 | Rejected-Finance L-2 |
| 4 | L-4₹1.6 Cr+₹7.3 L (4.92%)Rejected-Finance GRAM TINANHARI POST NATHNAGAR THANA MAHULI DISTRICT SANT KABIR NAGAR | AMROHA | UTTAR PRADESH | 244102 | ₹1.6 Cr+₹7.3 L (4.92%) | L-4 | Rejected-Finance L-3 |
| 5 | L-5₹1.6 Cr+₹11.9 L (8.00%)Rejected-Finance 0 | ₹1.6 Cr+₹11.9 L (8.00%) | L-5 | Rejected-Finance L-4 |
| Sl No | Description | Qty | Unit | M/S RAJ CONSTRUCTION L4 | M/S AMJAD KHAN L5 | M/S MEERA CONSTRUCTION L1 | SHIVANAND SHUKLA L3 | A P SHUKLA AND COMPANY L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00Supply of Hume Pipe | ||||||||
| 1.01 | Earthwork in filling in Gaps and Restoration of Canal Section of Mahadev Mr. in all type of soil from transported earth from spoil bank on Rapti main Canal by including all lead and lift including proper mechanical compaction and dressing to profile as per direction of Engineer in charge . (qty 10256.21+7243.44) | 17,499.65 | cum | 220 ₹38,49,923 | 280 ₹48,99,902 | 200 ₹34,99,930 Lowest | 200 ₹34,99,930 Lowest | 220 ₹38,49,923 |
| 1.02 | Earth work in Digging foundation in all type of soil including all lead and lift of channel with refilling of tranches etc complete.as per direction of Engineer in charge . (Above Spring Level) (qty1231.36+515.78+294.19) | 2,041.33 | cum | 60 ₹1,22,479.8 Lowest | 90 ₹1,83,719.7 | 90 ₹1,83,719.7 | 90 ₹1,83,719.7 | 60 ₹1,22,479.8 Lowest |
| 1.03 | Earth work in Digging foundation in all type of soil including all lead and lift of channel with refilling of tranches etc complete as per direction of Engineer in charge . (below Spring Level) | 120.5 | cum | 80 ₹9,640 | 105 ₹12,652.5 | 130 ₹15,665 | 80 ₹9,640 | 60 ₹7,230 Lowest |
| 1.04 | Centering and Shuttering for C.C. work including all cast of materials ,labour T&P etc.per sqm as per direction of Engineer in charge . (Qty482.49+81.947) | 564.44 | sqm | 650 ₹3,66,886 | 800 ₹4,51,552 | 750 ₹4,23,330 | 700 ₹3,95,108 | 400 ₹2,25,776 Lowest |
| 1.05 | Laying C.C. M-10 (1:3:6) mix with Kabrai crushed stone ballast 20-40 mm size and coarse sand of F.M. ≥ 2.0, including all cost of material, labour, T&P etc. required for proper completion of work.as per direction of Engineer in charge . | 71.18 | cum | 10,500 ₹7,47,390 | 11,218 ₹7,98,497.24 | 9,500 ₹6,76,210 | 9,800 ₹6,97,564 | 8,200 ₹5,83,676 Lowest |
| 1.06 | Laying CC M-20(1:1.5:3) with Kabrai crushed stone grit graded size 4.75 to 20 mm with Hamirpur coarse sand of FM greater than 2 in lining and packing of joints of pipe syphon, including all cost of material, labour, T&P etc required for proper completion of work. (Qty 324.44+125.54+1.89) | 451.87 | cum | 12,100 ₹54,67,627 | 12,800 ₹57,83,936 | 11,000 ₹49,70,570 Lowest | 11,000 ₹49,70,570 Lowest | 12,200 ₹55,12,814 |
| 1.07 | S/Laying of Local sand filling for making sub base for C.C, linning including carriage from nearest quarry/River Bed, laying manual compaction & all T&Prequired for proper completion of work. as per direction of engineer-in-charge; | 283.76 | cum | 1,012 ₹2,87,165.12 | 1,140 ₹3,23,486.4 | 1,000 ₹2,83,760 | 1,100 ₹3,12,136 | 400 ₹1,13,504 Lowest |
| 1.08 | Brick on edge soling laid on dry on service road and front of wireless house on Rapti Main Canal Km. 67.460 including cost of all materials, labour, T & P. etc. required for proper completion of work as per direction of Engineer-in-Charge. | 1,176.75 | sqm | 490 ₹5,76,607.5 Lowest | 525 ₹6,17,793.75 | 500 ₹5,88,375 | 520 ₹6,11,910 | 550 ₹6,47,212.5 |
| 1.09 | Providing & laying Mirzapur Stone Boulder (20 kg to 40kg) including loading, unloading and stacking, including all cost of material, labour, T&P etc. required for proper completion of work. as per direction of engineer-in-charge; | 446.58 | cum | 4,700 ₹20,98,926 | 4,650 ₹20,76,597 | 4,500 ₹20,09,610 | 5,200 ₹23,22,216 | 4,000 ₹17,86,320 Lowest |
Tender Value
₹2.1 Cr
EMD Value
₹4.2 L
Closing Date
13 Oct 2025, 11:00 amClosed
SUPERINTENDING ENGINEER
Rapti Nahar Nirman Mandal 1 Balrampur
as per tenter notic
2025_UPIDC_1078210_2
04/SE/2025-26
Open Tender
Civil Works
Item Rate
120 days
Tulsipur Balrampur
as per tender notic
2 documents required · 2 mandatory
₹2,354
₹4.2 L
Yes
6 Dec 2025
7 Oct 2025
13 Oct 2025
7 Oct 2025
13 Oct 2025
7 Oct 2025
Amount
Supply of Hume Pipe
Earthwork in filling in Gaps and Restoration of Canal Section of Mahadev Mr. in all type of soil from transported earth from spoil bank on Rapti main Canal by including all lead and lift including proper mechanical compaction and dressing to profile as per direction of Engineer in charge . (qty 10256.21+7243.44)
Earth work in Digging foundation in all type of soil including all lead and lift of channel with refilling of tranches etc complete.as per direction of Engineer in charge . (Above Spring Level) (qty1231.36+515.78+294.19)
Earth work in Digging foundation in all type of soil including all lead and lift of channel with refilling of tranches etc complete as per direction of Engineer in charge . (below Spring Level)
Centering and Shuttering for C.C. work including all cast of materials ,labour T&P etc.per sqm as per direction of Engineer in charge . (Qty482.49+81.947)
Laying C.C. M-10 (1:3:6) mix with Kabrai crushed stone ballast 20-40 mm size and coarse sand of F.M. ≥ 2.0, including all cost of material, labour, T&P etc. required for proper completion of work.as per direction of Engineer in charge .
Laying CC M-20(1:1.5:3) with Kabrai crushed stone grit graded size 4.75 to 20 mm with Hamirpur coarse sand of FM greater than 2 in lining and packing of joints of pipe syphon, including all cost of material, labour, T&P etc required for proper completion of work. (Qty 324.44+125.54+1.89)
S/Laying of Local sand filling for making sub base for C.C, linning including carriage from nearest quarry/River Bed, laying manual compaction & all T&Prequired for proper completion of work. as per direction of engineer-in-charge;
Brick on edge soling laid on dry on service road and front of wireless house on Rapti Main Canal Km. 67.460 including cost of all materials, labour, T & P. etc. required for proper completion of work as per direction of Engineer-in-Charge.
Providing & laying Mirzapur Stone Boulder (20 kg to 40kg) including loading, unloading and stacking, including all cost of material, labour, T&P etc. required for proper completion of work. as per direction of engineer-in-charge;
Plum Boulder Pitching with filling of voids with CC including all cost of material, labour, T&P etc required for proper completion of work as per direction of Engineer in charge.
Making Construction Joint and painting with primer and filling with sealing compound in lining work including all cost of materal,labour, T&P etc required for proper completion of work as per direction of Engineer in Charge
Dewatering with all cost of power/POL machines,pump well,paint system & operator etc with assembling and dismantling of equipment required including all cost of material,labour,T&P etc. required for proper completion of work
Providing, laying & fixing in position,joining joints and alignment of 1200mm dia Np-3 hume pipe,asper direction engineerin-charge; including all cost of material, labour, T&P etc. required for proper completion of work.as per direction of Engineer in charge .
First class brick work in 1:4 C:M with chopan coarse sand of F.M.≥ 2.0, including all cost of material, labour, T&P etc. required for proper completion of work. as per direction of Engineer in charge.
Cement pointing in 1:2 C:M with chopan coarse sand F.M. ≥ 2.0, including all cost of material, labour, T&P etc. required for proper completion of work as per direction of Engineer in charge .
Earth work in Excavation for restoring proper discharge in all type of soil including all lead &lift, including all cost of labour ,t&P etc complete with manaual compaction as per direction of Engineer in charge
M/S MEERA CONSTRUCTION (BID ID -5602063)
A P SHUKLA AND COMPANY (BID ID -5601017)
SHIVANAND SHUKLA (BID ID -5602067)
M/S RAJ CONSTRUCTION (BID ID -5601249)
M/S AMJAD KHAN (BID ID -5602011)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .