| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹9.5 L+₹26,264.04 (2.84%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | Rejected-Technical | - | Rejected-Technical Does not fulfill the technical criteria |
| Sl No | Description | Qty | Unit | NAVEEN VERMA L1 | Parveen Verma L2 |
|---|---|---|---|---|---|
| 1.00 | 5/7 meters wide (5 meters wide in straigth and 7 meters on curves) Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposal of excavated earth in all height and depths in all kinds of soil, including saturated soil comprising of pick work, jumper work and blasting work both in soft and hard rock with chiseling and wedging out of rock where blasting is prohibited and their intermediate classification of soils including dewatering wherever required, setting out true to the required lines, grades, side, slopes, trimming of bottom and levels as shown on the drawing and as directed by the Engineer.-in Charge. at site according to the HP.PWD specification of 1990 volume-I and sorting out useful and un-useful material and stacking the same in all leads and lifts and transportation of the un serviceable materials for filling in roadways, embankment s for grade improvement and leveling to required grades and then disposing of all surplus excavated materials in acquired width of the road or on approved dumping site /sites through all labours machineries materials, tools, equipments and safety measures and other incidental necessary to complete the work by mechanical means and or labour if any required. The recovery for stones, whether useful or not for 278.20 (Two hundred seventy eight point twenty) Cubic Meter in all cases at the rate of Rupees 300/- only (Rupees three hundred only) per cubic meter shall be effected on pro rata basis in all circumstances. Any loss to the public and private property during the course of excavation shall be the absolute responsibility of the contractor, which shall have to be duly compensated by him in all cases. | 4,377.34 | Per Cubic Metre | 211 ₹9,23,618.74 Lowest | 217 ₹9,49,882.78 |
Tender Value
₹9.6 L
EMD Value
₹19,300
Closing Date
6 Mar 2026, 6:00 pmClosed
Executive Engineer
Kumarsain Division HPPWD Kumarsain
Formation Cutting 5/7 mtr wide road in Km 1/000 to 1/650
2026_PWD_129966_1
PWD-KMS-AB-NIT/2025-26-9655-56 dt 25.02.2026
Open Tender
Civil Works - Roads
Item Rate
60 days
Kumarsain
Please refer Tender documents.
9 documents required · 9 mandatory
₹350
₹19,300
10 Mar 2026
28 Feb 2026
7 Mar 2026
28 Feb 2026
6 Mar 2026
28 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 5/7 meters wide (5 meters wide in straigth and 7 meters on curves) Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposal of excavated earth in all height and depths in all kinds of soil, including saturated soil comprising of pick work, jumper work and blasting work both in soft and hard rock with chiseling and wedging out of rock where blasting is prohibited and their intermediate classification of soils including dewatering wherever required, setting out true to the required lines, grades, side, slopes, trimming of bottom and levels as shown on the drawing and as directed by the Engineer.-in Charge. at site according to the HP.PWD specification of 1990 volume-I and sorting out useful and un-useful material and stacking the same in all leads and lifts and transportation of the un serviceable materials for filling in roadways, embankment s for grade improvement and leveling to required grades and then disposing of all surplus excavated materials in acquired width of the road or on approved dumping site /sites through all labours machineries materials, tools, equipments and safety measures and other incidental necessary to complete the work by mechanical means and or labour if any required. The recovery for stones, whether useful or not for 278.20 (Two hundred seventy eight point twenty) Cubic Meter in all cases at the rate of Rupees 300/- only (Rupees three hundred only) per cubic meter shall be effected on pro rata basis in all circumstances. Any loss to the public and private property during the course of excavation shall be the absolute responsibility of the contractor, which shall have to be duly compensated by him in all cases. | 4,377.34 | Per Cubic Metre | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
BOQ_192109.xls
BOQ • 0.23 MB
SBD.pdf
Tender Documents • 2.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .