Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAdmitted-Finance 00 BALAJI ENTERPRISES NEW ROAD NEW ROAD RATLAM MADHYA PRADESH 457001 | RATLAM | MADHYA PRADESH | 457001 | ₹4.0 L | L1 | Admitted-Finance |
| 2 | L2₹4.1 L+₹5,935 (1.49%)Admitted-Finance | ₹4.1 L+₹5,935 (1.49%) | L2 | Admitted-Finance |
| 3 | L3₹4.2 L+₹19,558 (4.90%)Admitted-Finance | ₹4.2 L+₹19,558 (4.90%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not Eligible for part 1 |
| Sl No | Description | Qty | Unit | M/S BALAJI ENTERPRISES L1 | Hindustan Electric Work L2 | ANCHAL CONSTRUCTION L3 |
|---|---|---|---|---|---|---|
| 1.00Cartage of following stock material from Store Center Darshan Nagar to work site including loading, unloading and proper Stacking. | ||||||
| 1.01 | PCC Pole 8.5 Mtr. Long | 56 | Nos. | 800 ₹44,800 Lowest | 810 ₹45,360 | 820 ₹45,920 |
| 1.02 | ST Pole 11 Mtr. Long | 10 | Nos. | 800 ₹8,000 Lowest | 810 ₹8,100 | 820 ₹8,200 |
| 1.03 | ACSR weasel Conductor | 0.5 | Kms. | 1,500 ₹750 Lowest | 1,550 ₹775 | 1,600 ₹800 |
| 1.04 | Single Phase AB Cable (1x16+1x25) | 0.2 | Kms. | 3,000 ₹600 Lowest | 3,050 ₹610 | 3,500 ₹700 |
| 1.05 | Three phase AB Cable 3x95 sqmm | 0.2 | Kms. | 3,000 ₹600 Lowest | 3,050 ₹610 | 3,500 ₹700 |
| 1.06 | Three phase AB Cable 3x50 sqmm | 0.2 | Kms. | 3,000 ₹600 Lowest | 3,050 ₹610 | 3,500 ₹700 |
| 1.07 | Other matching Materials | 1 | M.T. | 3,250 ₹3,250 Lowest | 3,275 ₹3,275 | 3,300 ₹3,300 |
| 2.00 | Dragging of PCC/ST Pole as per RESPO Norms. | 66 | Nos. | 220 ₹14,520 Lowest | 222 ₹14,652 | 260 ₹17,160 |
| 3.00 | Fabrication and Errection of Singal Pole Support on PCC/ST Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamps as per RESPO Norms. (Cost of clamps borne by contractor) | 58 | Nos. | 2,150 ₹1,24,700 Lowest | 2,155 ₹1,24,990 | 2,500 ₹1,45,000 |
Tender Value
₹4 L
EMD Value
₹4,000
Closing Date
23 Jul 2026, 5:00 pmClosed
SE, EDC, Ayodhya
EDC, Civil Liens, Ayodhya.
45/EDC(Ayodhya)/2026-27
2026_MVVNL_1164886_1
45/EDC(Ayodhya)/2026-27
Open Tender
Electrical Works
Item Wise
Ayodhya
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE, EDC, Ayodhya
₹4,000
25 Jul 2026
30 Jun 2026
24 Jul 2026
30 Jun 2026
23 Jul 2026
30 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Cartage of following stock material from Store Center Darshan Nagar to work site including loading, unloading and proper Stacking. | |||||
| 1.01 | PCC Pole 8.5 Mtr. Long | 56 | Nos. | 100 | ₹5,600 |
| 1.02 | ST Pole 11 Mtr. Long | 10 | Nos. | 100 | ₹1,000 |
| 1.03 | ACSR weasel Conductor | - | Kms. | 10 | - |
| 1.04 | Single Phase AB Cable (1x16+1x25) | 1 | Kms. | 11 | ₹10.99 |
| 1.05 | Three phase AB Cable 3x95 sqmm | 1 | Kms. | 12 | ₹11.99 |
| 1.06 | Three phase AB Cable 3x50 sqmm | 1 | Kms. | 11 | ₹10.99 |
| 1.07 | Other matching Materials | 1 | M.T. | 12 | ₹12 |
| 2 | Dragging of PCC/ST Pole as per RESPO Norms. | 66 | Nos. | 13 | ₹858 |
| 3 | Fabrication and Errection of Singal Pole Support on PCC/ST Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamps as per RESPO Norms. (Cost of clamps borne by contractor) | 58 | Nos. | 14 | ₹812 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
BOQ_2184541.xls
BOQ • 0.24 MB
TenderForm45.pdf
Tender Documents • 0.93 MB
Dateextend4549.pdf
PDF • 0.26 MB
Dateextend4445.pdf
PDF • 0.29 MB
Dateextend1.pdf
PDF • 0.23 MB
Dateextend.pdf
PDF • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .