Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹88.1 LAccepted-AOC | ₹88.1 L | L1 | Accepted-AOC Work Order Allotted. |
| 2 | L1₹88.1 LRejected-Finance BARLAWGAON P O KALIAGAON DIST CHIRANG BTR ASSAM | ₹88.1 L | L1 | Rejected-Finance Work Order not Allotted. |
| 3 | L1₹88.1 LRejected-Finance | ₹88.1 L | L1 | Rejected-Finance Work Order not Allotted. |
| 4 | Rejected-Technical | - | - | Rejected-Technical Documents not found in order |
Tender Value
₹97.9 L
EMD Value
₹2.0 L
Closing Date
11 Mar 2024, 1:00 pmClosed
CHD, Irrigation, BTC, Kokrajhar
CHD, Irrigation, BTC, Kokrajhar
Construction of Canal system at Baodia FIS Under PMKSY (HKKP) for the year 2021-22
2024_BoTC_36566_6
CHDI/ ET-24/2022-23/31
Open Tender
Civil Works
Works
365 days
chapaguri
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
₹2.0 L
Yes
16 Mar 2024
23 Feb 2024
11 Mar 2024
23 Feb 2024
11 Mar 2024
23 Feb 2024
Amount
Construction of Main Canal [ Item No.: 15(A) ]:- Earth work in excavation in irrigation canal to the design section and grade by depositing the spoils in the form of embankment in 15cm layers on both the banks as necessary including clearing light jungles, removing trees up to 15cm, uprooting roots, stumps from the seat of embankment and canal bed and free from all vegetation including breaking clods not more than 10mm cube ramming, dressing and roughening the seat of embankment with lead up to 30m and lift up to 1.5m complete as directed. B.(i)Hard soil (Soil mixed with gravel or morum up to 50mm size)
[ Item No.: 8( B) ]:- Collection and supply of 15 cm to 23 cm hard river boulder including loading, unloading, stacking in measurable stacks at work site paying forest royalty etc. complete as directed. [Average distance considered 25 Km](i)Distance of work site from quarry @ 25 Km
item No-27 :-Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope with voids filling and local carriage of boulders from a distance c50 m with lift upto 3m complete as directed.
[ Item No.: 57 ]:- Cement Concrete work in proportion 1: 3: 6 with aggregate of size 13mm to 38 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.)A) River Singles (i)Without shuttering & without Dewatering
[ Item No.: 65 ]:- Supplying, fitting, fixing and laying in position M.S. rod/ Torsteel/ TMT bars of all sizes as per design and drawing as required including cutting, bending, cranking with necessary lappage and tying with black wire complete as directed.
[ Item No.: 64 ]:- Cement Concrete work in proportion 1: 2: 4 with aggregate of size 6mm to 20 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.)A) River Singles (i)Without shuttering & without Dewatering
[ Item No.: 45 (c) ]:- Centering and shuttering including propping etc. where necessary and removal of forms after completion of C.C. and R.C.C. works complete as directed. (Measurement will be taken on the face area of timber)
[ Item No.: 23 ]:- Earth work in back filling of structure with earth obtaining from outside borrow pits, filling with 15cm layer ramming, dressing and compaction and watering including paying compensation of land, if any with lead up to 30m and lift 1.50m complete as directed.
RCC Branch Canal [ Item No.: 15(A) ]:- Earth work in excavation in irrigation canal to the design section and grade by depositing the spoils in the form of embankment in 15cm layers on both the banks as necessary including clearing light jungles, removing trees up to 15cm, uprooting roots, stumps from the seat of embankment and canal bed and free from all vegetation including breaking clods not more than 10mm cube ramming, dressing and roughening the seat of embankment with lead up to 30m and lift up to 1.5m complete as directed. B.(i)Hard soil (Soil mixed with gravel or morum up to 50mm size)
[ Item No.: 8( B) ]:- Collection and supply of 15 cm to 23 cm hard river boulder including loading, unloading, stacking in measurable stacks at work site paying forest royalty etc. complete as directed. [Average distance considered 25 Km](i)Distance of work site from quarry @ 25 Km
item No-27 :-Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope with voids filling and local carriage of boulders from a distance c50 m with lift upto 3m complete as directed.
[ Item No.: 57 ]:- Cement Concrete work in proportion 1: 3: 6 with aggregate of size 13mm to 38 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.)A) River Singles (i)Without shuttering & without Dewatering
[ Item No.: 65 ]:- Supplying, fitting, fixing and laying in position M.S. rod/ Torsteel/ TMT bars of all sizes as per design and drawing as required including cutting, bending, cranking with necessary lappage and tying with black wire complete as directed.
[ Item No.: 64 ]:- Cement Concrete work in proportion 1: 2: 4 with aggregate of size 6mm to 20 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.)A) River Singles (i)Without shuttering & without Dewatering
[ Item No.: 45 (c) ]:- Centering and shuttering including propping etc. where necessary and removal of forms after completion of C.C. and R.C.C. works complete as directed. (Measurement will be taken on the face area of timber)
[ Item No.: 23 ]:- Earth work in back filling of structure with earth obtaining from outside borrow pits, filling with 15cm layer ramming, dressing and compaction and watering including paying compensation of land, if any with lead up to 30m and lift 1.50m complete as directed.
Dhriti Sankar Das
chakrasing Muchahary
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .