Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 231 SATYA VIHAR MADAN CONTRACTORS AND COMO VIJAY PARK DEHRADUN DEHRADUN UTTARAKHAND 248001 | DEHRADUN | UTTARAKHAND | 248001 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹19.4 L
EMD Value
₹19,500
Closing Date
15 Feb 2023, 12:00 pmClosed
Superintending Engineer
132 KV lalkuan Campus, Ghaziabad
Works at sub-station
2023_UPTCL_772939_1
Short Term E-Tender No- T-94/ETC/GZB/2022-23
Open Tender
Electrical Works
Turn-key
90 days
220 kv s/s Loni
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
AS PER NIT
₹19,500
27 Mar 2023
8 Feb 2023
15 Feb 2023
8 Feb 2023
15 Feb 2023
8 Feb 2023
Amount
Work Portion:-
Dismantling, Shifting & Reerection of structure/equipments
Dismantling of Auxiliary structure lattic type ALP, ABL etc. The job consist of shifting of all material from site to store.
Dismantling of 33 KV vacuum circuit breaker
Dismantling of 33 KV Current Transformer
Dismantling of 33 KV Line Isolator/Bus Isolator
Reerection including shifting of Auxiliary structure Lattic type ALP, ABL etc.
Reerection of 33 KV vacuum circuit breaker
Reerection of 33 KV Current Transformer
Reerection of 33 KV Bus/Line Isolator
Complete Earthing of 33 KV new bay equipments (CB,CT,ISO. Etc) with the help of 50x6mm M.S. Flat including laying, painting & welding.
Jumpering of reerected 33 KV bay equipments with ACSR Single/Twin Panther/Zebra conductor
Erection of Main & Auxiliary Sub-Station Structure for HV & LV side bay of 63 MVA Transformer
Proper stacking and shifting of Main & auxiliary structure in open switchyard at erecting place as per shop bill norms.
Erection of Main & Auxiliary structure lattice type ATM, ABL, BCT, ALP, BPL etc. consisting of column, beam, peak, mast etc. and auxiliary structure for installation of isolator, CTs, PTs, LA etc. erection of structure as per drawing with the help of GI nuts & Bolts flat spring washer matching the hole, cutting and matching the member if required include cost of all men and T & P excluding GI structure nut and bolts to complete the work erection of main & auxiliary structure lattice type ATM, BTM, AXM, ABL, CCM,CGM, EKR, BBR, BCT, ALP, BPL, BTI etc. upon foundation and its proper tightening.
Making hole in part of GI Main/auxiliary structure / cutting of GI angle drilling of hole existing/ defective structure /plate/Angle and grinding machine with all cost of men, T & P etc. ( If required)
Erection of following bay equipment as per instruction manual of various equipment’s and technical specification including shifting of material / equipment from store to erection site including all other associated works to complete the job satisfactorily.
145KV, 1600A, 40KA, 3-Sec., SF6 Gas Insulated Hybrid Switchgear-Transformer Bay : Comprising of circuirt breaker(Gang Operated), Current tranformers 01 No Per Phase, Combind disconnectors & earthing switch on Transformer side, bus bar side disconnector for each bus with one common earthing switch for both disconnectors, local control cubicle.
Erection of 120 KV Lighting Arrestors
Erection of 36 KV Vacuum Circuit Breaker
Erection of 36 KV Current Transformer
Erection of 36 KV Bus Isolator/Line Isolator
Erection of 30 KV Lighting Arrestors
Erection of following control and relay Panels as per instruction manual and technical specification including shifting of panel from store to erection site including all other associated works to complete the job satisfactorily.
Erection of 132 KV control Relay panel for 63 MVA Transformer.
Stringing of various main bus bar of 132 KV & 33KV different type conductor and different length of span as mentioned below the work includes cutting &bending of conductor fixing of single Panther bolted type tension fitting /suspension hoisting of disc Insulator and shifting of material from store site to erection site and all other associated work to complete work satisfactorily as per drawing and technical specification.
132 KV Main Bus for Zebra conductor
Hoisting of 132 KV string under Beam to pass the jumper including hanging of disc insulator and suspension fitting complete with all work.
Bay wise interconnection of equipment with specified conductor of various 132 KV & 33 KV Equipment with Main /Transfer / jack Bus bar of ACSR Zebra /Panther conductor. The work Includes cutting of conductor. Bending in proper shape clamping with the help of clamp and all other associated work to complete job.
132 KV Side Jumper main bus
33 KV Line side jumper
Laying and Termination of following size control cable in trench/cable trays from different control room equipment to 132/33 KV Isolator, circuit breakers CT/PT & their junction boxes. Transformer marshaling box. Isolator box & other outdoor equipment’s installed in 132/33 KV switch yard as per cable schedule. Including carriage of cable drum from store and all other associated work.
Control cable of size 2 core x 2.5 mm2
Control cable of size 4 core x 2.5 mm2
Control cable of size 6 core x 2.5 mm2
Control cable of size 10 core x 2.5 mm2
Termination of control cable
Fabrication of 3 meter long electrode with 40 mm dia M S round bar having 150 mm long conical shape by digging cutting, straightening etc. and then placing it vertical. inside the ground with Top 700mm below the ground level including shifting of MS round bar from storage place at the Sub-Station to switchyard.
Earthig of 120/30 KV LA's of 132 KV Lines and 63 MVA Transformers neutral by consisting of 3/6 Nos. 3.0 Mtr long electrode of 40mm dai having 150mm long conical shape, its placing inside the ground in rectangular/triangular shape and connection all 3/6 Nos electrodes with 75x10/50x6mm MS flite laid on its edge and then this rectangle/tringle shape be connected to main earth mat at two place in opposite direction strictly as per drawing.
120 KV Lighting Arrestors (Rectangle shape 8 electrode )
30 KV Lighting Arrestors (Rectangle shape 8 electrode )
Earthing of equipment’s by cutting straightening, bending, laying 700mm below ground and above ground of following size of MS flat for earthing of main and auxiliary structure, equipment’s structure. Transformer body and its neutral point including welding with main earthmat and with object to be earthed excavation of trenches its back filling. All other associated work as required to complete the work.
Laying of MS Flat of size 75x10 mm
Laying of MS Flat of size 50x6 mm
Painting of MS flat of different size after cleaning of rusted surface 1st coat of Red Oxide and 2 coat of Bus Green Paint to complete the work.
MS Flat of size 75x10 mm
MS Flat of size 50x6 mm
Erection of 63 MVA Transformer
Shifting of new 63MVA Transformer main tank from unloading site to transformer plinth at 220KV S/S Loni approx. distance 20mtrs
(a) Additional shifting/dragging 75 mtr for every 5 Mtr per job
Complete, erection of new 63 MVA T/F work includes erection of radiator, conservator tank, bushing with its turrets (if available) connecting of all oil pipe line, erection of cooling fans, making control cables connection, buchholz relay etc. for completing the work, topping of T /F oil and final oil filling in tank, radiator, conservator tank and all other associates work for completion of job satisfactory.
Earthing of main tank of new 63 MVA T /F by using M.S. flat 50X6 / 75X10 mm size, it’s jointing with already laid earth mat / Deltas. Neutral bushing support for its earthing work.
Making of Delta earthing for 63 MVA transformer as per UPPTCL Norms
Placement of new RTCC panel of this new 63 MVA T /F in control room at 220KV S/S Muradnagar including its Termination & fitting and laying of control cable if required as per site requirement and its connections.
Jumpering of 63 MVA T/F from HV with single Moose/Zebra/ Panther and LV Side with Twin Moose Conductor.
Centrifuging of complete T/F oil in T/F by connecting centrifuging pipes circulating the T/F oil through PVT. centrifuging machine and taking the BDV/Water Content (PPM) value of the oil periodically till the required value is achieved .Approx. 25KL
Providing and Fixing of Emulsifier System along with new deluge valve (150 NB) modification of emulsifier pipe line with supply & installation of high velocity automatic water spraying system for 63 MVA T/F including, laying of fire detection/water pipe line, valves, Quartzoid bulb, HVWS nozzles along with all material complete as per details:
Supply & installation testing commissioning of quick opening flood, deluge value of HD of 150 NB as per Max working pressure 10 Kg/cm2, as per specification (HD/Mather Platt/equivalent) (In nos.).
Supply & installation & Commissioning of gate value (sluice Valve/Butterfly valve) as per IS specification (IS Code: 14846) of (Zoloto/Kartar/Sir make) (In nos.)
Supply & installation & testing commissioning of “Y” Type strainer (Kartar/Sir/Kalpana/Agro make) of dia Max working pressure 7 Kg/cm2 (In Nos.)
Supply & laying of different sizes of M.S Pipe ‘B’ class for fire water pipe line/support as per IS specification (IS code-1239) as per drawing enclosed. Complete with elbow Tee, Socket reducer etc. with anti-corrosive treatment with detail as below: (In Mtr)
Supply and laying of different size of GI Pipe ‘B’ class for fire detection/Water pipe line as per specification (IS Code-1239) as per drawing enclosed complete with elbow, Tee Socket. Reducer, (In Mtr)
Supply & Installation of Flanges as per IS-1538 of different sizes as per drawing work include proper butt welding with pipe & proper packing and coupling with Nut & Bolt.
Supply & installation & commissioning of high velocity water spray nozzles flow capacity 3.5 kg/cm2. Spray core angle90°. (In Nos.)
Supply & installation & commissioning of Quartzoid Bulb detectors (QBD) Operate at 90°C, sensing at rated temp for actuation of the element 10-12 sec (In Nos.)
Supply & Installation & testing commissioning of fixed different switch (Danfoss/Indfoss make) type pressure switch Range 1-10 Kg/Cm2 (In Nos.)
Pressure gauge as per IS specification IS code 3624, Accuracy 1/+5% (In Nos.)
Supply Portion :-
Bolted type single Tension fitting for Zebra Conductor suitable for 1x10 nos Disc with hardware set as per techinical specification.
Bolted type single Suspension fitting for Zebra Conductor Suitable for Disc with hardware set as per techinical specification.
4 Bolted Type PG clamp suitable for Zebra to Zebra Conductor Complete with HDG nut bolt & washer as per technical specification.
Bimetallic 120 KV LA clamp made of aluminum alloy LM-6 suitable for Zebra conductor complete nut , bolts and washer as per technical specification.
Bimetallic 33 KV Isolator clamp for ASCR Twin Zebra conductor with nut, bolts and washer as per technical specification.
Bimetallic 33 KV Isolator clamp for ASCR Single Zebra conductor with nut, bolts and washer as per technical specification.
33 KV Breaker clamp for ACSR Twin Zebra conductor with nut, bolts and washer as per technical specification.
33 KV Breaker clamp for ACSR single Zebra conductor with nut, bolts and washer as per technical specification.
33 KV CT clamp for ACSR Twin Zebra conductor with nut, bolts and washer as per technical specification.
30 KV LA clamp for ACSR Twin Zebra conductor with nut, bolts and washer as per technical specification.
Madan contractors & Co.
BARKATI ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .