Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.7 LAccepted-Finance | L1 | Accepted-Finance 1st lowest | |
| 2 | L2₹12.7 L+₹557.85 (0.04%)Rejected-Finance | L2 | Rejected-Finance 2nd lowest |
Tender Value
₹12.9 L
EMD Value
₹12,860
Closing Date
31 Jul 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block development officer(BP)
Panchayat Union Office ,Kumbakonam panchayat union
Thanjavur District-kumbakonam block Construction of Drama stage at kaliamman koil street for Thilaiyambur Panchayat Kumbakonam block under MPLAD - 2022-2023
2023_RDTN_349807_1
RC NO 1112/2022/A2 Dt 30.04.2023
Open Tender
Civil Works
Item Rate
kumbakonam
As per Tender document
9 documents required · 9 mandatory
₹0
₹12,860
9 Aug 2023
25 Jul 2023
31 Jul 2023
25 Jul 2023
31 Jul 2023
25 Jul 2023
Amount
Part.01.Construction of Drama Stage at Kaliyamman koil Street at Thillaiyambur Panchayat
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all material to site including all labour charges for filling etc. complete
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
R.C.C ( 1:11/2:3 ) mix using 20mm ISS & HBG metal including cost and conveyance and labour charges etc.Complete.
Supply and Fabrication and placing in Position of Steel rods including cost and conveyance of all materials labour charges etc.Complete.
Best Steel centering using GI Sheet and L angle including cost and conveyance and labour charges etc.Complete. (Below basement)
Best Steel centering using GI Sheet and L angle including cost and conveyance and labour charges etc.Complete. (For column)
Best Steel centering using GI Sheet and L angle including cost and conveyance and labour charges etc.Complete. (Above basement)
B.W. in cm 1:5 mix using country bricks of size 8 3/4 x4 1/4 x 2 1/4 including cost and conveyance and labour charges etc.,complete (Upto Basement)
B.W. in cm 1:5 mix using country bricks of size 8 3/4 x4 1/4 x 2 1/4 including cost and conveyance and labour charges etc.,complete (Above Basement)
Special Ceilling Plastering in Cm (1:3) 10mm thick including cost and conveyance of all charges etc.Complete.
Plastering in Cm (1:5) 12mm thick including cost and conveyance of all charges etc.Complete.
Granolithic Flooring with CC 1:2:4 Using 10-12mm Metal 25mm thick including cost and conveyance of all materials and labour charges etc.
Finishing the top of roof with one coarse pressed tiles 20x20x2cm size laid in CM 1:3 12 mm thick and pointing with 1:3 mix using water proof compound including all labour charges etc
White washing two coats with approved quarry including all charges and conveyances
Distembering two coats with approved quarry including all charges and conveyances
Painting two coats of newly plastered wall surface with ready mixed Plastic Emulsion Paint of First quality of approved colour over a Priming Coat standard specification etc., complete
Provision for hand rail for steps & ramp
Provision for Water Supply Arrangements
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SARAVANAN N
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .