Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹45.8 LAdmitted-Finance B 304 RAJAJIPURAM AMBA PALACE AWAS VIKAS COLONY LUCKNOW UTTAR PRADESH 226001 | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | L1 | Admitted-Finance | ||
| 2 | L1₹45.8 LAdmitted-Finance | L1 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹4.7 L
Closing Date
18 Jun 2026, 3:00 pmClosed
Chief Engineer
Lucknow Municipal Corporation
Construction work of Muktakaash Theater in Shakti Van on Ayodhya Road on the banks of Kukrail River under Lucknow Municipal Corporation area.
2026_DOLBU_1157833_1
52/CE/26-27
Open Tender
Civil Works
Percentage
Lucknow Municipal Corporation
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,364
Lucknow Municipal Corporation
₹4.7 L
20 Jul 2026
6 Jun 2026
18 Jun 2026
6 Jun 2026
18 Jun 2026
6 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | DSR 2.8.1, Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 402.88 | cum | 205.62 | ₹82,840.19 |
| 2 | Supplying and stacking of good earth at site including royalty and carriage upto 20 km lead complete (earth measured in stacks will be reduced by 20% for payment). PWD SOR | 1,200.9 | cum | 348.08 | ₹4,18,009.27 |
| 3 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) DSR 4.1.8 | 42.27 | Cum | 5,381.16 | ₹2,27,461.63 |
| 4 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) 5.1.2 | 61.21 | Cum | 7,145.92 | ₹4,37,401.76 |
| 5 | R.C.C. work in Column DSR 5.2.2 | 98.55 | Cum | 7,902.37 | ₹7,78,778.56 |
| 6 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) DSR 6.1.2 | 44.91 | CUM | 5,193.21 | ₹2,33,227.06 |
| 7 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : 6.4.2 Cement mortar 1:6 (1 cement : 6 coarse sand) | 77.33 | CUM | 7,193.27 | ₹5,56,255.57 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars of grade Fe-500D or more. DSR-5.22.6 | 12,541.77 | KG | 71.5 | ₹8,96,736.56 |
| 9 | Cement plaster 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement. 20 mm cement plaster. DSR 13.9.2 | 736.34 | SQM | 463.86 | ₹3,41,558.67 |
| 10 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. DSR- 5.9.2 | 371.03 | SQM | 613.45 | ₹2,27,608.35 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
52CERFP.pdf
Tender Documents • 8.01 MB
BOQ_2169822.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .