| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.7 LAccepted-AOC CHAUHAN BUILDING LOWER PANTHAGHATTI SHIMLA | L1 | Accepted-AOC Awarded | |
| 2 | L2₹25.9 L+₹4.2 L (19.4%)Rejected-Finance | L2 | Rejected-Finance 2nd Lowest | |
| 3 | L2₹31.2 L+₹9.5 L (43.8%)Rejected-Finance VILLAGE SARGHEEN P O BEOLIE TEHSIL DISTT SHIMLA | SHIMLA | SHIMLA | HIMACHAL PRADESH | L2 | Rejected-Finance 2nd Lowest | |
| 4 | L3₹26.1 L+₹4.4 L (20.4%)Rejected-Finance | L3 | Rejected-Finance 3rd Lowest | |
| 5 | L4₹27.9 L+₹6.2 L (28.4%)Rejected-Finance | L4 | Rejected-Finance 4th Lowest |
Tender Value
Refer Docs
EMD Value
₹62,100
Closing Date
15 Dec 2021, 4:00 pmClosed
Executive Engineer Division No-IHPPWD Shimla-3
Executive Engineer Division No-IHPPWD Shimla-3
C/O RCC Retaining wall in back side of Block -4 under Police colony section
2021_PWD_54478_1
SD-I-CTR-Tender-2021-22- 17288 dt 29-11-2021
Open Tender
Civil Works
Item Rate
90 days
Shimla
As per SBD
15 documents required · 15 mandatory
₹1,500
₹62,100
19 Jul 2024
8 Dec 2021
16 Dec 2021
8 Dec 2021
15 Dec 2021
8 Dec 2021
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm (Thirty centimetre) in depth, 1.5 m (One point five metre) in width as well as 10 sqm (ten Square Metre) on plan) including getting out and disposal of excavated earth all lead and lift as directed by Engineer-in-charge and sorting out useful and unuseful material and transportation of the unuseful material for disposing at dumping site (To be arranged by the contractor) as per satisfaction of Engineer- in -charge through all modes of transportation including head load ,animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour ( if required ) Any loss to the public and private propriety, human being, machinery during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. (i)All kinds of soil
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m (One point five metre) in width or 10 sqm (ten Square Metre)on plan) in all kinds of soil. including dressing of sides and ramming of bottoms including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal in all leads and lifts including dressing of sides and bottom and back filling in trenches with excavated suitable materials. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion damage to hill side water pollution etc. and to protect stability of hill side rock shall be excavated with chiseling and wedging out rock (where blasting is prohibited) all earth work in cutting/ excavation including rock excavation shall be carried out true to lines grades, side slopes, width , camber super elevation and level as shown on the drawings or as directed by the Engineer-in-charge hauling and stacking of materials useful for construction at suitable sites and safe disposal of unsuitable cut materials in specified dimension or as directed by the Engineer-in-Charge. If the foundation of the structure is in an area with stagnant water or water is met with in the excavation due to spring seepage rain and other causes it shall be remove by suitable diversion bailing out or pumping as directed and the area of the foundation or embankment shall be kept dry. All the surplus excavated earth to be dumped at dumping site(dumping sites will be arranged by the contractor on his own cost).Any loss to the public or private property during the course of excavation shall be the sole responsibility of the contractor which shall have to be dully compensated by him at his on cost in all cases. including carriage of materials in all leads and lifts as per the directions of the Engineer-in-Charge.
Providing and laying concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802,803,1202 and 1203 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. ( a) Cement Mortar 1:6:12(one cement:six sand:twelve graded stone agg.40mm (forty milimetre) nominal size).
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (i) 1:1½:3 (One Cement: One & Half coarse sand) : Three graded stone aggregate 20 mm (Twenty milimetre)nominal size)
Providing weapholes in brick masonry / stone masonry /plain reinforced concrete abutment, wing wall, return wall with 100 mm(One hundred milimetre) dia PVC pipe extending through the full with of the structures with slop of 1(v):20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7 including carriage of materials in all leads and lifts as per the directions of the Engineer-in-Charge.
Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm (five centimetre to twenty centimetre), in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer-in-Charge.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level including carriage of materials in all leads and lifts as per the directions of the Engineer-in-Charge. (i)Mild steel and Medium Tensile steel bars
MANTU KUMAR GUPTA
CHAUHAN CONSTRUCTIONS
BHARAT SINGH CHAUHAN
vikas sharma
Jai Lal
Akash Saini
AMIT MEHTA
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .