Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.1 LAccepted-Finance ALIGARH UTTAR PRADESH | ALIGARH | UTTAR PRADESH | 202001 | 1 | Accepted-Finance 1 | |
| 2 | 2₹7.1 L+₹99,204.18 (16.3%)Rejected-Finance A 51 SHALIMAR GARDEN EX 2 SAHIBABAD DISTRICT GHAZIABAD UTTAR PRADESH | SAHIBABAD | GHAZIABAD | UTTAR PRADESH | 2 | Rejected-Finance 2 | |
| 3 | 3₹8.1 L+₹2.0 L (32.6%)Rejected-Finance | 3 | Rejected-Finance 3 | |
| 4 | 4₹8.5 L+₹2.4 L (39.6%)Rejected-Finance | 4 | Rejected-Finance 4 | |
| 5 | Rejected-Technical | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | ARTIST BRO L2 | SON VIR L3 | S F INFRA PROJECTS L1 | M/S RINKU CONTRACTOR L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth Work in silt clearance including Lead upto 30 M and Lift upto 1.5 M including ramming and dressing by Manual Labour. The Earth from clearance to be used in side embankment or to be disposed off at spoil banks including all labour ,T&P etc complete as directed by Engineer-in-charge. | 9,584 | Cum. | 50 ₹4,79,200 | 60 ₹5,75,040 | 46 ₹4,40,864 Lowest | 63 ₹6,03,792 |
| 2.00 | Earth Work in silt clearance including lift upto 1.5 M and lead upto 200 M by power transport including ramming and dressing by Manual Labour. The Earth from clearance to be used in side embankment or to be disposed off at spoil banks including all labour ,T&P etc complete as directed by Engineer-in-charge. | 544 | Cum. | 150 ₹81,600 | 145 ₹78,880 | 104 ₹56,576 Lowest | 158 ₹85,952 |
| 3.00 | Scrapping Internal Section of existing channel in Side Slope with silt upto 5cm including all labour, T&P etc complete as directed by Engineer in charge. | 9,036 | Sqm | 4 ₹36,144 | 4 ₹36,144 | 3 ₹27,108 Lowest | 4.5 ₹40,662 |
| 4.00 | Clearing thick bushes and thorny jungle without uprooting i/c cost of all material,labour,T&P etc | 19,620 | Sqm | 4 ₹78,480 | 4.4 ₹86,328 | 3 ₹58,860 Lowest | 4.4 ₹86,328 |
| 5.00 | Providing and laying C C - M15(1:2:4) with cement , coarse sand , and 10mm to 25mm stone grit including cost of all material, labour and T&P etc.complete. | 0.28 | Cum. | 5,500 ₹1,553.75 Lowest | 6,500 ₹1,836.25 | 6,779 ₹1,915.07 | 6,779.19 ₹1,915.12 |
| 6.00 | 1st class brickwork in superstructure in 1:4 Cement mortar using coarse sand i/c cost of all material,labour,T&P etc | 2.2 | Cum. | 5,000 ₹11,000 Lowest | 5,500 ₹12,100 | 5,000 ₹11,000 Lowest | 5,903 ₹12,986.6 |
| 7.00 | Struck deep pointing in 1:2 on brick masonry ,cement , coarse sand including cost of all material, labour and T&P etc. complete. | 11 | Sqm. | 150 ₹1,650 | 130 ₹1,430 Lowest | 138 ₹1,518 | 138.8 ₹1,526.8 |
| 8.00 | cement plaster in 1:4 on brick masonry ,cement , fine sand including cost of all material, labour and T&P etc. complete. | 2.25 | Sqm. | 150 ₹337.5 Lowest | 180.3 ₹405.68 | 160 ₹360 | 180.3 ₹405.68 |
| 9.00 | V.R.B or bridge clearance including all labour,T&P etc complete all as directed by Engineer in charge. | 20 | Nos. | 500 ₹10,000 | 600 ₹12,000 | 400 ₹8,000 Lowest | 660 ₹13,200 |
| 10.00 | Finishing of walls with water proofing cement paint of approved make such as super Snowcem, Durrocem, Robiacem Guttucem, supreme quality of required shade on uncoated wall surface (one coat) over one coat white cement primer to give even shades after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including curing and cost of all materials. | 38 | Sqm. | 150 ₹5,700 | 50 ₹1,900 Lowest | 50 ₹1,900 Lowest | 50 ₹1,900 Lowest |
Tender Value
₹8.5 L
EMD Value
₹17,000
Closing Date
19 Sept 2026, 12:00 pmClosed
executive engineer
UMBDGC KHURJA
silt clearence work
2026_UPIDC_1185339_17
05/EE/2026-27
Open Tender
Civil Works
Item Rate
20 days
UMBDGC KHURJA
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹17,000
2 Oct 2026
14 Sept 2026
19 Sept 2026
14 Sept 2026
19 Sept 2026
14 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in silt clearance including Lead upto 30 M and Lift upto 1.5 M including ramming and dressing by Manual Labour. The Earth from clearance to be used in side embankment or to be disposed off at spoil banks including all labour ,T&P etc complete as directed by Engineer-in-charge. | 9,584 | Cum. | - | - |
| 2 | Earth Work in silt clearance including lift upto 1.5 M and lead upto 200 M by power transport including ramming and dressing by Manual Labour. The Earth from clearance to be used in side embankment or to be disposed off at spoil banks including all labour ,T&P etc complete as directed by Engineer-in-charge. | 544 | Cum. | - | - |
| 3 | Scrapping Internal Section of existing channel in Side Slope with silt upto 5cm including all labour, T&P etc complete as directed by Engineer in charge. | 9,036 | Sqm | - | - |
| 4 | Clearing thick bushes and thorny jungle without uprooting i/c cost of all material,labour,T&P etc | 19,620 | Sqm | - | - |
| 5 | Providing and laying C C - M15(1:2:4) with cement , coarse sand , and 10mm to 25mm stone grit including cost of all material, labour and T&P etc.complete. | 0.28 | Cum. | - | - |
| 6 | 1st class brickwork in superstructure in 1:4 Cement mortar using coarse sand i/c cost of all material,labour,T&P etc | 2.2 | Cum. | - | - |
| 7 | Struck deep pointing in 1:2 on brick masonry ,cement , coarse sand including cost of all material, labour and T&P etc. complete. | 11 | Sqm. | - | - |
| 8 | cement plaster in 1:4 on brick masonry ,cement , fine sand including cost of all material, labour and T&P etc. complete. | 2.25 | Sqm. | - | - |
| 9 | V.R.B or bridge clearance including all labour,T&P etc complete all as directed by Engineer in charge. | 20 | Nos. | - | - |
| 10 | Finishing of walls with water proofing cement paint of approved make such as super Snowcem, Durrocem, Robiacem Guttucem, supreme quality of required shade on uncoated wall surface (one coat) over one coat white cement primer to give even shades after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including curing and cost of all materials. | 38 | Sqm. | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_2230619.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .