Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-AOC SANTINEKATAN ROAD BOLPUR | BOLPUR | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹3.8 L+₹1,748.37 (0.46%)Rejected-Finance 17 1 ABHOY HALDER LANE KOLKATA | KOLKATA | L2 | Rejected-Finance REJECTED | |
| 3 | L3₹3.8 L+₹3,553.95 (0.93%)Rejected-Finance COLLEGEPARA SURI BIRBHUM | BIRBHUM | WEST BENGAL | 731236 | L3 | Rejected-Finance REJECTED |
Tender Value
Refer Docs
EMD Value
₹8,000
Closing Date
16 Mar 2024, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASSISTANT ENGINEER BOLPUR MECHANICAL DIVISION PHED
SRINIKETAN ROAD NEAR HOTEL MARK MEADOWS PO SRINIKETAN DIST BIRBHUM PIN 731236
Providing yard lighting arrangement at Surul w s scheme under Bolpur Mechanical Divn. P.H.E. Dte
2024_PHED_675114_1
PHED/07/AE/BOLMD/23-24
Open Tender
MECHANICAL
Item Rate
30 days
SURUL
Please refer Tender documents.
5 documents required · 5 mandatory
₹8,000
18 Jun 2025
27 Feb 2024
18 Mar 2024
28 Feb 2024
16 Mar 2024
28 Feb 2024
Amount
Supply and delivery of 1.1kv grade XLPE Al. Ar. Cable conforming to IS-7098 (Part-I) 1998 with latest amendment. Make: Havells/Gloster/Polycab/Standard a. 10 Sq. mm 2 core N.B.: Supply of cable should be as per actual requirement at site.
Supply and delivery of energy efficient LED street light fixture with IP66 and IK06 protected LM high pressure alluminium di cast housing with polycarbonate cover capable of delivery standard lumen output as follows .The lens plate should be bolted to the metal core PCB should not be glued . The driving current should be more than 700 mA . It should have internal surge protection of minium 4kv , lumen /watt >100, Drivier efficiency > 85% ,PF >0.95, THD<10% .
a] Philips BRP 409 LED 068 CW HE NR FG . (TC needed at the time of delivery).
Fixing outdoor type LED light fitting on pole, providing wiring with 2 x 2.5 sq.mm PVC insulated sigle core copper cable (approved make) from loop box at the base of pole to light fitting through pole & bracket including making connection.
Laying of single cable upto 35 sqmm in under ground trench 460 mm wide x 760 mm averrage depth, with brick protection on top of the cable with 8 (eight) nos bricks per MTR, including filling the space between the bricks & cable and also the trench with shiftted soil, levelling up & restoring surface duly rammed.
Paiting of tubular pole with one coat of red lead primer & two coats of anticorrosive Aluminium paint (approved make) after preparation of surface cleaning by wire brash/sand paper etc.
Testing the whole installation as per satisfection of EIC.
Supply and delivery of 32 DP main switch
Supply and delivery of 6 sq mm wire 1.1 kv single core copper cable. (Make:any approved)
Supply and delivery of 63 TPN main switch
Supply and delivery of 100 TPN main switch
Supply and delivery of 100 busbar
Supply and delivery of 32 Amps DOL Starter
Making Iron frame and installer above supplied materials (sl no 7-12) with necessary nuts,bolts, washer and other materials to complete the work.
Making foundation for installation of above supplied iron frame This include the cost of all necessary CC foundation with concrete mixture [sand.cement. stone chips] and neat cement finish by supplying of all required materials and testing the entire set as per direction of EIC.
Making road crossing boring with supply of 3" GI pipes
Withdrawing the Pumping machinery along with column pipe from the bore well after making necessary arrangement and handling with chain pulley block complete to the satisfaction of EIC. Cost includes carrying of all materials as required tools and tackles along with electrical instruments etc. also including deputing technician for fault detection. Installation of the pumping machinery making all required arrangement, cable joint with cable jointing kits supplied by Agency, priming free run fitting complete installation after making joints of column pipe using havox etc. for leak proof commissioning , testing to the entire satisfaction of EIC, works includes carrying charges as per direction of EIC. (≥ 20H.P.)
Add: GST @ 18% on sum of Item No: 1 to 16
Add Cess @1% on sum of Item No. 17
ORIENTAL ENGINEERING CO.
HINDOL ROY
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .