Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹99.9 L
EMD Value
₹1.2 L
Closing Date
30 Dec 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Sri Jyotirmay Sinha, GM(Civil-Welfare), MCL
MCL.Jagriti Vihar. Burla. Dist.-Sambalpur. PIN-768020. Odisha. Contact No.9437145678.
Renovation of Two Tennis Courts, Painting, Washing and some development works of Sports Complex area of Jagruti Vihar, MCL HQ
2025_MCL_349882_1
MCL/Samb/Civil-Wel/e Tender/25-26/30 Dated 22.12.2025
Open Tender
Civil Works - Others
Percentage
90 days
Jagruti Vihar, MCL HQ
As per Tender document.
5 documents required · 5 mandatory
₹1.2 L
24 Dec 2025
23 Dec 2025
31 Dec 2025
23 Dec 2025
30 Dec 2025
23 Dec 2025
23 Dec 2025 - 23 Dec 2025
Earth work in excavation by mechanical means (Hydrauli cexcavator )/manual means in foundation trenches or drains( not exceeding 1.5 m in width or 10 sqm on plan ), including dressing of sides and ramming of bottoms , for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Providing and laying in position cement concrete of level: specified grade excluding thecost of centering and shuttering - All work up to plinth 1:4:8(1Cement:4 coarse sand(zone-Ill)derived from natural sources :8 graded stone aggregate 40 mm nominal size derived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3(1 cement: 1.5 coarse sand (zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Brick work with Fly Ash Brick (230x115x75 mm size) bricks of class designation 10 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand
Brick work with Fly Ash Brick (230x115x75 mm size) bricks of class designation 10 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand)
Demolishing lime concrete manually/ by mechanical means and disposal of material within 50 metres lead as per direction of Engineer- in-charge.
Providing and laying 60mm thick faciory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge.
Providing and laying in position cement concrete of level : specified grade excluding the cost of centering and shuttering - All work up to plinth 1:1.5:3 (1Cement : 1.5 coarsesand (zone-Ill derived from natural sources :3graded ston eaggregate 20 mm nominal size derived from natural sources)
Structura lsteel work riveted ,bolted or welded in builtup sections ,trusse sand framed work ,including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Providing and fixing hard drawn steel wirefabric 75x25 mm mesh of weight not less than7.75 Kg per sqm to window frames etc. including 62x19 mm beading of second class teakwood and priming coat with approved steel primer all complete
Providing & laying seven Layer Acrylic Synthetic Sports flooring having two Layers Of Acrylic Resurfacer, three Layers Of Rubber Cushion, one Layer Of Filler Coat, one Layer Of Top Coat and Final Line Marking As Per Norms including cost of labours etc complete as per instruction of EIC.
Annual Maintenance of Existing seven layer Acrylic Synthetic Sports flooring including cost of materials, labour, etc complete as per instruction of EIC.
Providing and laying Artificial Grass Carpet of size 25mmx600mm including cost of material and labour etc complete as per instruction of EIC.
12 mm cement plaster of mix: 1:6(1 cement: 6 fine sand)
Finishing walls with textured exterior paint of required shade:New work (Two or more coats applied @ 3.28 ltr/10 sqm) over and including priming coat of exteriorprimer applied @ 2.20kg/10 sqm
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work
CARRIAGE OF MATERIALS Lime , moorum, building rubbish (5 Km)
Making tribal art on wall and specified trees, trunks with superior quality weather coat íncluding one coat of background painting of different shade and pictorial figures/writing with appropriate paint for a prominent look including cost of paint, labour, materials like paint brush, tools and plants required for the work as per instruction of EIC
Cement plaster 1:3(1 cement: 3 coarse sand) finished with a floating coat of neat cement. 12 mm cement plaster
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead.
Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of: G.S. Sheet
Providing, hoisting and fixing above plinth level upto floor five level precast reinforced cement concrete work instringcourses, bands,copings, bedplates, anchorblocks, plain windowsillsand the like, including the cost of required centering ,shuttering but excluding cost of reinforcement with 1:1.5:3 (1cement :1.5coarse sand (zone-III) derived from natural sources :3graded stone aggregate 20 mm nominal size derived from natural sources).
Providing and fixing 1st quality ceramic glazed wall tile sconforming to IS:15622 (thickness tobe specified by themanufacturer),of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge,in skirting ,risers of steps and dados ,over 12mm thick bed o f cement mortar 1:3 (1cement:3coarsesand) and jointing with grey cement slurry @ 3.3kg per sqm, including pointing in white cement mixed with pigment of matching shade complete.
Earthwork in excavation by mechanical means (Hydrauli cexcavator)/manual means over areas (exceeding 30cm in depth,1.5m inwidth as well as10sqm on plan)including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 and for all lif.
Carriage of materials by mechanical transport including loading,unloading and stacking-Earth, Lead-5
Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.09 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.55 MB
Tendernotice_2.pdf
PDF • 0.58 MB
BOQ_362632.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .