| 1 | l1₹46.3 LAccepted-Finance KODBELTALA BOALIADANGA BERHAMPORE MURSHIDABAD | BERHAMPORE | MURSHIDABAD | WEST BENGAL | l1 | Accepted-Finance l1 | |
| 2 | l2₹48.5 L+₹2.3 L (4.95%)Rejected-Finance ASANSOL | ASANSOL | l2 | Rejected-Finance l2 | |
| 3 | l3₹49.2 L+₹3.0 L (6.44%)Rejected-Finance 85 A SEN ROAD KOLKATA 700 048 | KOLKATA | KOLKATA | WEST BENGAL | 700048 | l3 | Rejected-Finance l3 |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
19 Oct 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Secretary
Asansol mc
Maintenance of Darbadanga Pump House and Sirishdanga Pump House including supplying and installation of necessary materials of Jamuria B I within AMC
2022_MAD_401690_14
202/WS/ENG/2022
Open Tender
Miscellaneous Works
Item Rate
365 days
Asansol
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹20,000
21 Nov 2022
6 Sept 2022
21 Oct 2022
6 Sept 2022
19 Oct 2022
6 Sept 2022
Amount
REPAIRING AND MAINTENANCE OF DARBARDANGA & SIRISHDANGA PUMP HOUSE OF JAMURIA WITHIN ASANSOL MUNICIPAL CORPORATION.
DARBARDANGA PUMP HOUSE
Day to day periodical inspection as and when required by electrical supervisor having valid supervisor's certificate of competency from directorate of Electricity (Licensing board), govt. of West Bengal or under any other state govt. of India along with pump Technician / Supervisor. Each visit should be recorded In the log book (With date and time} to be supplied by the agency and kept in the pump house building. The supervisor requires to have thorough / in-depth instruction of all the electrical appliances to ascertain the healthy/ fault free operational condition of each equipment i.e (For 1 No. 85 HP VT pump-motor, 3 Nos. 5 HP Sub-mersible pump-motor, 100 HP centrifugal pump 2 Nos., 35 HP centrifugal pump 2 Nos., 17 HP centrifugal pump 2 Nos., 4 HP open well submersible 2 Nos., same no. of starter, cable and HT VCB, ACB, AVR, Transformer, LT panel, PDB, capacitor, all type of valves, actuators, relays, contactors, timers, SFU including cleaning of contacts by CRC 226 spray In HT < panel board, cleaning of all terminal sockets and checking of healthy condition of draw out feeders all complete as per satisfaction of E-I-C.
DARBARDANGA PUMP HOUSE
85 HP Vertical Turbine Pump-Motor & MCC Panel
5 HP Submersible Pump-Motor & MCC Panel
750 KVA outdoor Transformer
Vacuum Circuit breaker
AVR system
SIRISHDANGA PUMP HOUSE
100 HP Centrifugal Pump-Motor & MCC Panel
35 HP Centrifugal Pump-Motor & MCC Panel
17 HP Centrifugal Pump-Motor & MCC Panel
4 HP Open well Submersible Pump-Motor & MCC Panel
750 KVA outdoor Transformer
Vacuum Circuit breaker
Air Circuit breaker
SIRISHDANGA PUMP HOUSE HT VCB PANNEL
Supply & installation of new CT of adequate rating incl. fitting & fixing all complete with all allied works.
Supply & installation of new PT of adequate ratingincl. fitting & fixing all complete with all allied works.
Supply & installation of vaccum bottle of adequate rating incl. fitting & fixing all complete with all allied works.
Electric Heater repairing incl. fitting & fixing all complete with all allied works.
Supply & installation of rose contact of adequate rating incl. fitting & fixing all complete with all allied works.
Overhauling of VCB Panel
TRANSFORMER 750 KVA INDOOR TYPE
Supply & installation of 11 KV Bush of adequate rating including fitting & fixing all complete with all allied works.
Re winding of transformer including fitting, fixing, testing, commissioning all complete including filling with Oil.
Filtering of Transformer Oil with necessary machinaries and Di-electric test of 33 kV for Transformer Oil.
Supply and installation of adequate size oil seal gasket for transformer.
Supply and filling with filtering of Transformer oil of Power oil.
Supply and filling of Silica Gel
Overhauling of Transformer
AUTOMATIC VOLTAGE STABILIZER
Repairing of AVR with all adequate rating Contactor ,rectifier material including fitting & fixing all complete with all allied work
Rwinding of AVR with all adequate rating Contactor, rectifier material including fitting & fixing all complete with all allied work
ACB OR PDB PANNEL
ACB 1600 Ampere (Incommer)
Repairing of Bus bar incl. fitting fixing all complete with all allied works. Like Socketing, Glanding of cable.
Supply & installation of Contact of adequate rating incl. fitting & fixing all complete with all allied works.
Replacement of old damage Voltmeter/Ammeter
Overhauling of Panel
Supply & Installation of HRC/HBC fuse of adequate rating material including fitting & fixing all complete with all allied work
Disconnector / Isolator Swiitch on PDB 125A Switch Disconnector for 45KW pump
Supply & Installation of Isolator Switch (Disconnector switch) by dismantling old one of adequate rating including fitting & fixing all complete with all allied work
Supply & Installation of HRC/HBC fuse of adequate rating material including fitting & fixing all complete with all allied work
315A Switch Disconnector for 132KW pump
Supply & Installation of Isolator Switch (Disconnector switch) by dismantling old one of adequate rating including fitting & fixing all complete with all allied work.
Supply & Installation of HRC/HBC fuse of adequate rating material including fitting & fixing all complete with all allied work
16A Switch Disconnector for Actuator / RTCC / Ventilation
Supply & Installation of Isolator Switch (Disconnector switch) by dismantling old one of adequate rating including fitting & fixing all complete with all allied work
Supply & Installation of HRC/HBC fuse of adequate rating material including fitting & fixing all complete with all allied work
32A Switch Disconnector for Chlorinator Chamber
Supply & Installation of Isolator Switch(Disconnector switch) by dismantling old one of adequate rating including fitting & fixing all complete with all allied work
Supply & Installation of HRC/HBC fuse of adequate rating material including fitting & fixing all complete with all allied work
63A Switch Disconnector for 22KW Pump/Lighting Load
Supply & Installation of Isolator Switch(Disconnector switch) by dismantling old one of adequate rating including fitting & fixing all complete with all allied work
Supply & Installation of HRC/HBC fuse of adequate rating material including fitting & fixing all complete with all allied work
Overhauling of Disconnector/Isolator Swiitch on PDB
Repairing of Busbar including fitting fixing all complete with all allied works likesocketing glanding of cable etc
Supply & Installation of Busbar for PDB panel of adequate rating material including fitting & fixing all complete with all allied work
Total Starter of Pump For 132KW pump Auto Transformer Starter.
Rewinding of Auto Transformer coil by dismantling of old damage coil ,including fitting and fixing all complete
Supply & Installation of Contactor of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of MCCB of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of CT coil of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of Relay of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of Timer of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of AUX of adequate rating material including fitting & fixing all complete with all allied work
Overhauling of Starter
For 45 KW pump Star Delta Starter
Supply & Installation of Contactor of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of MCCB of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of CT coil of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of Relay of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of Timer of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of AUX of adequate rating material including fitting & fixing all complete with all allied work
Overhauling of Starter
For 22 KW pump Star Delta Starter
Supply & Installation of Contactor of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of MCCB of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of CT coil of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of Relay of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of Timer of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of AUX of adequate rating material including fitting & fixing all complete with all allied work
Overhauling of Starter
Pump Specification: 132KW pump Discharge Capacity 454 M3 / HR Head 65 M
Supply & Installation of new Bush by dismantling old one including fitting & fixing all complete with all allied work
Supply & Installation of new Ball bearing by dismantling old one including fitting & fixing all complete with all allied work
Supply & Installation of new Roll bearing by dismantling old one including fitting & fixing all complete with all allied work
Supply & Installation of new Shaft by dismantling old one including fitting & fixing all complete with all allied work
Supplying and filling of Pump oil
45 KW pump Discharge Capacity 210 M3/HR Head 39 M
Supply & Installation of new Bush by dismantling old one including fitting & fixing all complete with all allied work
Supply & Installation of new Ball bearing by dismantling old one including fitting & fixing all complete with all allied work
Supply & Installation of new Roll bearing by dismantling old one including fitting & fixing all complete with all allied work
Supply & Installation of new Shaft by dismantling old one including fitting & fixing all complete with all allied work
Supplying and filling of Pump oil
22 KW pump Discharge Capacity 120 M3/HR Head 36M
Supply & Installation of new Bush by dismantling old one including fitting & fixing all complete with all allied work
Supply & Installation of new Ball bearing by dismantling old one including fitting & fixing all complete with all allied work
Supply & Installation of new Roll bearing by dismantling old one including fitting & fixing all complete with all allied work
Supply & Installation of new Shaft by dismantling old one including fitting & fixing all complete with all allied work
Supplying and filling of Pump oil
Overhauling of pump
132KW pump
45 KW pump
22KW pump
Dismantling, Cleanning, Rewinding, and Heat Varnish of motor and reinstallation
132KW MOTOR
45 KW MOTOR
22KW MOTOR
Replacement of Bearing Housing (including all necessary materials & labour cost)
132KW MOTOR
45 KW MOTOR
22KWMOTOR
Replacement of Ball bearing ,Housing (including all necessary materials & labour cost)
132KW MOTOR
45 KW MOTOR
22KW MOTOR
Repairing of motor terminal socket including all necessary items required
132KW MOTOR
45 KW MOTOR
22KW MOTOR
For 4 HP Submersible Dewatering pump DOL Starter
Supply & Installation of Contactor of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of MCCB of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of CT coil of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of Relay of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of Timer of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of AUX of adequate rating material including fitting & fixing all complete with all allied work
Overhauling of Starter
Dismantling, Cleanning, Rewinding, and Heat Varnish of motor and reinstallation for 4 HP Submersible Dewatering pump
Supply and installlation of new Motor set by dismantling of old Motor Set,including all necessary materials & labour cost4 HP Submersible Dewatering pump
Gland Packing (including all necessary materials & labour cost)
132KW pump
45 KW pump
22KW pump
Supply and installlation of new Motor set by dismantling of old Motor Set,including all necessary materials & labour cost.
132KW Motor
45 KW Motor
22KWMotor
Supply and installlation of new Pump set by dismantling of old Pump Set,including all necessary materials & labour cost
132KW pump
45 KW pump
22KW pump
Darbardanga pump house On Load Voltage Controller
Supply & Installation of Contactor of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of CT coil of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of PT coil of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of MCCB of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of Rectifier of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of AUX of adequate rating material including fitting & fixing all complete with all allied work
Overhauling of Starter
Transformer 750KVA Indoor type
Filling of Transformer oil
Supply & Installation of 11KV Bush of adequate rating including fitting & fixing all complete with all allied work
Rewinding of coil including fitting fixing testing commissioning allied work
Replacement of Silicagel
Overhauling of Transformer
Replacement of Silicagel
Power Distributiom Board 1600 Ampere(Incommer)
Supply & Installation of Isolator Switch(Disconnector switch) by dismantling old one of adequate rating including fitting & fixing all complete with all allied work
Supply & Installation of HRC/HBC fuse of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of new CT of adequate rating including fitting & fixing all complete with all allied work
Supply & Installation of new PT of adequate rating including fitting & fixing all complete with all allied work
Supply & Installation of new Earth Fult Relay of adequate rating including fitting & fixing all complete with all allied work
Supply & Installation of new Over Volatge Relay of adequate rating including fitting & fixing all complete with all allied work
Supply & Installation of new Over Curent Relay of adequate rating including fitting & fixing all complete with all allied work
Supply & Installation of new Earth Fult Relay of adequate rating including fitting & fixing all complete with all allied work
Isolator/Disconnector Swiitch on PDB 315 Switch Isolator/Disconnector for 110KW pump
Supply & Installation of Isolator Switch (Disconnector switch) by dismantling old one of adequate rating including fitting & fixing all complete with all allied work.
Supply & Installation of HRC/HBC fuse of adequate rating material including fitting & fixing all complete with all allied work
63A Switch Isolator / Disconnector for Submersible / Chlorine chamber / Boundary Light
Supply & Installation of Isolator Switch (Disconnector switch) by dismantling old one of adequate rating including fitting & fixing all complete with all allied work.
Supply & Installation of HRC/HBC fuse of adequate rating material including fitting & fixing all complete with all allied work
32A Switch Isolator/Disconnector for Lighting Load
Supply & Installation of Isolator Switch (Disconnector switch) by dismantling old one of adequate rating including fitting & fixing all complete with all allied work.
Supply & Installation of HRC/HBC fuse of adequate rating material including fitting & fixing all complete with all allied work
16A Switch Isolator/Disconnector for Guest House
Supply & Installation of Isolator Switch (Disconnector switch) by dismantling old one of adequate rating including fitting & fixing all complete with all allied work.
Supply & Installation of HRC/HBC fuse of adequate rating material including fitting & fixing all complete with all allied work
Total Starter of Pump: For 110 KW VT pump Star Delta Starter
Supply & Installation of Contactor of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of MCCB of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of CT coil of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of Relay of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of Timer of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of AUX of adequate rating material including fitting & fixing all complete with all allied work
Overhauling of Starter
For 5HP(3.72 KW) sub mersible pump Starter
Supply & Installation of Contactor of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of MCCB of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of CT coil of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of Relay of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of Timer of adequate rating material including fitting & fixing all complete with all allied work
Supply & Installation of AUX of adequate rating material including fitting & fixing all complete with all allied work
Overhauling of Starter
110KW VT pump Discharge Capacity 178 M3/HR Head 100 M current rating 186A
Supply & Installation of new Bush by dismantling old one including fitting & fixing all complete with all allied work
Supply & Installation of new Ball bearing by dismantling old one including fitting & fixing all complete with all allied work
Supply & Installation of new Roll bearing by dismantling old one including fitting & fixing all complete with all allied work
Supply & Installation of new Shaft by dismantling old one including fitting & fixing all complete with all allied work
Supplying and filling of Pump oil
MOTOR: 110KW VT pump Discharge Capacity 178 M3/HR Head 100 M current rating 186A
Dismantling, Cleanning, Rewinding, and Heat Varnish of motor and reinstallation
110 KW MOTOR
Repaiiring of motor terminal socket including all necessary items required
110 KW VT MOTOR
Overhauling of pump 110 KW VT
For 5HP (3.72 KW) sub mersible pump
Searching of satner pipe including labor cost,fitting & fixing all materials complete with all allied work
Ground piling for pipe including labor cost,fitting & fixing all materials complete with all allied work
cable clamping including labor cost,fitting & fixing all materials complete with all allied work
Flange leakage repairing including labor cost,fitting & fixing all materials complete with all allied work
collum pipe repairing including labor cost,fitting & fixing all materials complete with all allied work
Supplying and laying of GI pipe 40mm including labor cost,fitting & fixing all materials complete with all allied work
Supplying and laying og GI pipe100 mm including labor cost,fitting & fixing all materials complete with all allied work
Extracting the Pump from river for testing including labor cost,fitting & fixing all materials complete with all allied work
Lowering/reinstalling the Pump to river for testing including labor cost,fitting & fixing all materials complete with all allied work
Rewinding of motor coil including fitting fixing testing commissioning allied work
Supply and installlation of new Motor set by dismantling of old Motor Set,including all necessary materials & labour cost
Supply & Installation of new Bush by dismantling old one including fitting & fixing all complete with all allied work for the pump
Supply & Installation of new Ball bearing by dismantling old one including fitting & fixing all complete with all allied work for the pump
Supply & Installation of new Roll bearing by dismantling old one including fitting & fixing all complete with all allied workfor the pump
Supply & Installation of new Shaft by dismantling old one including fitting & fixing all complete with all allied work for the pump
Supplying and filling of Pump oil
Gland Packing (including all necessary materials & labour cost)
Supply & laying of Cable incl. necessary earth work and foundation trench fitting fixing socketing glanding all complete.
50 Sqmm 3Core 1.1 KV grade
70 Sqmm 3Core 1.1 KV grade
95 Sqmm 3Core 1.1 KV grade
120 Sqmm 3Core 1.1 KV grade
150 Sqmm 3Core 1.1 KV grade
185 Sqmm 3Core 1.1 KV grade
240 Sqmm 3Core 1.1 KV grade
300 Sqmm 3Core 1.1 KV grade
50 Sqmm 3.5 Core 1.1 KV grade
70 Sqmm 3.5 Core 1.1 KV grade
95 Sqmm 3.5 Core 1.1 KV grade
120 Sqmm 3.5 Core 1.1 KV grade
150 Sqmm 3.5 Core 1.1 KV grade
185 Sqmm 3.5 Core 1.1 KV grade
240 Sqmm 3.5 Core 1.1 KV grade
300 Sqmm 3.5 Core 1.1 KV grade
400 Sqmm 3.5 Core 1.1 KV grade
95 Sqmm 3Core 11 KV grade
120 Sqmm 3Core 11 KV grade
150 Sqmm 3Core 11 KV grade
185 Sqmm 3Core 11 KV grade
240 Sqmm 3Core 11 KV grade
300 Sqmm 3Core 11 KV grade
Repairing of Cable by straight through jointing method incl. supply of jointing kit and fitting fixing socketing glanding all complete. Necessary earth work if required.
10 Sqmm 3Core 1.1 KV grade
50 Sqmm 3Core 1.1 KV grade
70 Sqmm 3Core 1.1 KV grade
95 Sqmm 3Core 1.1 KV grade
120 Sqmm 3Core 1.1 KV grade
150 Sqmm 3Core 1.1 KV grade
185 Sqmm 3Core 1.1 KV grade
240 Sqmm 3Core 1.1 KV grade
300 Sqmm 3Core 1.1 KV grade
50 Sqmm 3.5 Core 1.1 KV grade
70 Sqmm 3.5 Core 1.1 KV grade
95 Sqmm 3.5 Core 1.1 KV grade
120 Sqmm 3.5 Core 1.1 KV grade
150 Sqmm 3.5 Core 1.1 KV grade
185 Sqmm 3.5 Core 1.1 KV grade
240 Sqmm 3.5 Core 1.1 KV grade
300 Sqmm 3.5 Core 1.1 KV grade
400 Sqmm 3.5 Core 1.1 KV grade
95 Sqmm 3Core 11 KV grade
120 Sqmm 3Core 11 KV grade
150 Sqmm 3Core 11 KV grade
185 Sqmm 3Core 11 KV grade
240 Sqmm 3Core 11 KV grade
300 Sqmm 3Core 11 KV grade
Socketing of Cable by crimping method incl. supply of adequate size of socket and fitting fixing of ampere tape all complete.
upto 35 Sqmm 3Core 1.1 KV grade
50 Sqmm 3Core 1.1 KV grade
70 Sqmm 3Core 1.1 KV grade
95 Sqmm 3Core 1.1 KV grade
120 Sqmm 3Core 1.1 KV grade
150 Sqmm 3Core 1.1 KV grade
185 Sqmm 3Core 1.1 KV grade
240 Sqmm 3Core 1.1 KV grade
300 Sqmm 3Core 1.1 KV grade
50 Sqmm 3.5 Core 1.1 KV grade
70 Sqmm 3.5 Core 1.1 KV grade
95 Sqmm 3.5 Core 1.1 KV grade
120 Sqmm 3.5 Core 1.1 KV grade
150 Sqmm 3.5 Core 1.1 KV grade
185 Sqmm 3.5 Core 1.1 KV grade
240 Sqmm 3.5 Core 1.1 KV grade
300 Sqmm 3.5 Core 1.1 KV grade
400 Sqmm 3.5 Core 1.1 KV grade
95 Sqmm 3Core 11 KV grade
120 Sqmm 3Core 11 KV grade
150 Sqmm 3Core 11 KV grade
185 Sqmm 3Core 11 KV grade
240 Sqmm 3Core 11 KV grade
300 Sqmm 3Core 11 KV grade
Leakage repairing by saddle clamp with insert rubber of 12.5 mm thick including supply, fitting & fixing of adequate saddle clamp with necessary work like earth work, dismantling, de-watering, cutting of pipe and grinding for all types of Pipe with supply of hiring basis labour and machinaries all complete.
200 mm dia
250 mm dia
300 mm dia
350 mm dia
500 mm dia
600 mm dia
700 mm dia
Leakage repairing by bolted collar including supply, fitting & fixing of of adquate bolted collar with necessary work like earth work, dismantling, de-watering, cutting of pipe and grinding for all types of pipe with supply of hiring basis labour and machinaries all complete.
200 mm dia
250 mm dia
300 mm dia
350 mm dia
500 mm dia
600 mm dia
700 mm dia
Renewing lead joint to CI pipes and specials and spun yam 'including reusing 60% of old and using 40% new lead of approved quality new span yarn and caulking the same properly including labour charges for dismantling the existing damaged portion complete as per direction of EIC by approved quality lead, spun yarn, fuel and other materials will be supplied by the agency including necessary earth work in exacavation, dewatering & back filling in same trenches as per EIC.
200 mm dia
250 mm dia
300 mm dia
350 mm dia
500 mm dia
600 mm dia
700 mm dia
Repairing of manifold line by replacing of old damaged MS pipe (8 mm to 12.5 mm thick) including supply and febricating, welding of new pipe along with earth cutting, dewatering, hiring basis hydra & JCB if required and all other items for complete the work.
200 mm dia
250 mm dia
300 mm dia
350 mm dia
500 mm dia
600 mm dia
700 mm dia
800 mm dia
Repairing of Air Valve by replacing old damage Ball including all necessary work to complete the item.
100 mm dia
150 mm dia
200 mm dia
Welding of MS pipes including necessary materails & labour cost at site.
Sluice Valve repairing by dismantling old spindle, supply of new spindle, rubber sheet and nut bolts (if required) incl. earth work, de-watering, fitting fixing all complete for all types of pipe.
100 mm dia
150 mm dia
200 mm dia
250 mm dia
300 mm dia
350 mm dia
500 mm dia
600 mm dia
700 mm dia
Sluice Valve repairing by dismantling old bush, supply of new bush rubber sheet and nut bolts (if required) incl. earth work, de-watering, fitting fixing all complete for all types of pipe.
100 mm dia
150 mm dia
200 mm dia
250 mm dia
300 mm dia
350 mm dia
500 mm dia
600 mm dia
700 mm dia
Sluice Valve repairing by dismantling old Lock nut, supply of new lock nut rubber sheet and nut bolts (if required) incl. earth work, de-watering, fitting fixing all complete for all types of pipe line.
100 mm dia
150 mm dia
200 mm dia
250 mm dia
300 mm dia
350 mm dia
500 mm dia
600 mm dia
700 mm dia
Sluice Valve gate linear repairing with supply of rubber sheet and nut bolts (if required) incl. earth work, de-watering, fitting fixing all complete for all types of pipe line.
100 mm dia
150 mm dia
200 mm dia
250 mm dia
300 mm dia
350 mm dia
500 mm dia
600 mm dia
700 mm dia
Sluice Valve Gland packing & greaseing, incl dismantling old gland packing and nut bolts (if required) incl. earth work, de-watering, fitting fixing all complete for all types of pipe line.
100 mm dia
150 mm dia
200 mm dia
250 mm dia
300 mm dia
350 mm dia
500 mm dia
600 mm dia
700 mm dia
NON-RETURN VALVE: Repairing of gate incl. fitting fixing all complete with all allied works like supply of nut-bolts, rubber sheet (if required)
100 mm dia
150 mm dia
200 mm dia
250 mm dia
300 mm dia
350 mm dia
400 mm dia
450 mm dia
500 mm dia
Supply & installation of NRV of PN. 1.6 incl. fitting fixing all complete with all allied works like supply of nut-bolts, rubber sheet (if required)
100 mm dia
150 mm dia
200 mm dia
250 mm dia
Supply and Fixing new Post Top Light Set by replacement the old damage light including all necessary material, wireand labour required.
Replacing of Driver of campus LED light in Pole / Wall including necessary wire and labour required.
40 watts
60 watts
72 watts
80 watts
120 watts
140 watts
160 watts
180 watts
210 watts
Supply of new outdoor type LED lights by replacing of old LED lights of campus light in Pole / Wall including necessary wire and labour required.
40 watts
60 watts
72 watts
80 watts
120 watts
140 watts
160 watts
180 watts
210 watts
Supply of new indoor type LED Tube lights by replacing of old LED Tube lights inside of pump house & other rooms of pump house including necessary wire and labour required.
22 watts
30 watts
Replacement of old LED Lamp by the new one including holder if required.
11 watts
16 watts
20 watts
30 watts
40 watts
Repairing of Metal Helaid light by replacing the following aparatus.
Replacing of 400 Watts Metal Helaid lamps
Replacing of 250 Watts Metal Helaid lamps
Replacing of 400 Watts Metal Helaid holder
Replacing of 250 Watts Metal Helaid holder
Replacement of Post Top Light Holder
Replacement of Post Top LED Lamp.
Repairing and Replacing of AC Ceiling Fan and Exhaust Fan
Rewinding and overhauling of AC Ceiling Fan including all necessary material, labour required
Supply and fixing new AC Celing fan by replaceing the old damage AC Ceiling Fan.
Rewinding and overhauling of Exhaust Fan including all necessary material, labour required
Supply and fixing new Exhaust fan by replaceing the old damage Exhaust Fan by new one Heavy duty 60 W
Supply and fixing new Exhaust fan by replaceing the old damage Exhaust Fan by new one Heavy duty 80 W
Supplying and drawing of 1.5 Sqmm copper cable of wiring
Maintening of garden by weekly Cutting trres / plants, planting flowers,watering and all allied works to be required. Once in a month
Supply and installlation of new Submersible pump by dismantling of old pump,including all necessary materials & labour cost ,earth work etc
7.5HP Submersible pump
2 HP Submersible pump
1 HP Submersible pump
Lowering/reinstalling the Pump for testing including labor cost,fitting & fixing all materials complete with all allied work
7.5HP Submersible pump
2 HP Submersible pump
1 HP Submersible pump
Dismantling, Cleanning, Rewinding, and Heat Varnish of motor and reinstallation
7.5HP Submersible pump
2 HP Submersible pump
1 HP Submersible pump
Supply & Installation of Contactor of adequate rating material including fitting & fixing all complete with all allied work
7.5HP Submersible pump
2 HP Submersible pump
1 HP Submersible pump
Supply & Installation of New Starter panel set of adequate rating material including fitting & fixing all complete with all allied work
7.5HP Submersible pump
2 HP Submersible pump
1 HP Submersible pump
A.CONSTRUCTION CO.
SONA ENTERPRISE
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .