Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.7 LAdmitted-Finance | +9.33% | ₹13.7 L | L1 | Admitted-Finance |
| 2 | L2₹14.0 L+₹28,987.95 (2.12%)Admitted-Finance | +11.65% | ₹14.0 L+₹28,987.95 (2.12%) | L2 | Admitted-Finance |
| 3 | L3₹15.1 L+₹1.4 L (10.4%)Admitted-Finance | +20.65% | ₹15.1 L+₹1.4 L (10.4%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹12.5 L
EMD Value
₹25,000
Closing Date
18 May 2026, 6:00 pmClosed
Commissioner M.C. Rajsamand
Municipal Council Rajsamand
Maharana Pratap park me suvidhao ke nirman karya ke antargat track nirman karya DMFT (Nagar Parishad Rajsamand)
2026_DLB_556783_3
ENIT 05/2026-27 Date 05.05.2026
Open Tender
Civil Works
Percentage
60 days
Rajsamand
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Commissioner M.C. Rajsamand and MDRISL Jaipur
₹25,000
Yes
5 Jun 2026
7 May 2026
19 May 2026
7 May 2026
18 May 2026
7 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles above 25 mm and upto 40 mm | 90 | Sqm | 73.9 | ₹6,651 |
| 2 | Carriage of Materials by mechanical transport including loading, unloading and stacking ::Earth 2 km | 90 | Cum | 185.54 | ₹16,698.6 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 50 | Cum | 5,510 | ₹2,75,500 |
| 4 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete: | 3,000 | KG | 114.5 | ₹3,43,500 |
| 5 | Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar
1:4 (1 cement : 4 fine/ coarse sand) | 162 | Sqm | 227 | ₹36,774 |
| 6 | 40 mm thick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement : 5 coarse sand) including pointing with cement mortar 1:2 (1 cement : 2 stone dust) with an admixture of pigment to match the shade of stone. Red sand stone | 499 | Sqm | 1,143 | ₹5,70,357 |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_991221.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .