| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.0 LAccepted-AOC | ₹62.0 L | L1 | Accepted-AOC work order for ilayangudi new building |
| Sl No | Description | Qty | Unit | THAIYAL NAYAKI BUILDER L1 |
|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all classes of soils (including soft rock) except hard rocks and refilling of foundation and basement, carting away the excess soil as directed. | 6,539.82 | Cft | 50 ₹3,26,991 Lowest |
| 2.00 | Laying of P.C.C. 1:5:10 for foundation using using 40mm hard broken aggregate including the cost of materials, transport charge, labour for curing all leads and lifts etc. | 476.7 | Cft | 115 ₹54,820.5 Lowest |
| 3.00Pouring of R.C.C 1:1.5:3 M20 grade concrete for foundation using 20mm hard broken aggregate including the cost of materials, admixture, transport, labour charges on barbending, Fabrication, shuttering, Centering, Concreting etc., but excluding the cost of steel. | ||||
| 3.01 | Room Inside , Footing: | 469.65 | Cft | 227 ₹1,06,610.55 Lowest |
| 3.02 | Plinth Beam, Vertical | 314.62 | Cft | 227 ₹71,418.74 Lowest |
| 3.03 | Basement Columns, GF Columns, FF Columns, Parapet Columns. | 487.44 | Cft | 200 ₹97,488 Lowest |
| 3.04 | GF Sill Slab, FF Sill Slab, GF Lintel Beam (Horizontal Direction, Vertical Direction), FF Lintel Beam: (Horizontal Direction, Vertical Direction) | 194.02 | Cft | 200 ₹38,804 Lowest |
| 3.05 | Ground Floor Roof Beam, Vertical, | 261.35 | Cft | 230 ₹60,110.5 Lowest |
| 3.06 | First Floor Roof Beam , Vertical | 136.64 | Cft | 235 ₹32,110.4 Lowest |
| 3.07 | Headroom Roof Beam (Shorter Span, Longer Span) | 36.94 | Cft | 235 ₹8,680.9 Lowest |
Tender Value
₹65.0 L
EMD Value
₹50,000
Closing Date
2 Mar 2026, 9:00 amClosed
GM
Sivagangai Institute of cooperative management campus, Kanjirangal, Sivagangai.
Construction of New Branch Building at Survey no 109/697, ILAYANGUDI , in Sivagangai District
2026_ROCS_655867_2
4711 2025 26 BS1
Open Tender
Civil Works - Buildings
Lump-sum
Ilaiyangudi, Sivagangai Dist
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹50,000
19 May 2026
23 Feb 2026
2 Mar 2026
23 Feb 2026
2 Mar 2026
23 Feb 2026
Earth work excavation for foundation in all classes of soils (including soft rock) except hard rocks and refilling of foundation and basement, carting away the excess soil as directed.
Laying of P.C.C. 1:5:10 for foundation using using 40mm hard broken aggregate including the cost of materials, transport charge, labour for curing all leads and lifts etc.
Pouring of R.C.C 1:1.5:3 M20 grade concrete for foundation using 20mm hard broken aggregate including the cost of materials, admixture, transport, labour charges on barbending, Fabrication, shuttering, Centering, Concreting etc., but excluding the cost of steel.
Room Inside , Footing:
Plinth Beam, Vertical
Basement Columns, GF Columns, FF Columns, Parapet Columns.
GF Sill Slab, FF Sill Slab, GF Lintel Beam (Horizontal Direction, Vertical Direction), FF Lintel Beam: (Horizontal Direction, Vertical Direction)
Ground Floor Roof Beam, Vertical,
First Floor Roof Beam , Vertical
Headroom Roof Beam (Shorter Span, Longer Span)
Floor Slab
Ground Floor Roof Slab
First Floor Roof Slab
Strong Room Shear Wall (Horizontal Direction, Vertical Direction)
Staircase
Compound Wall
Septic Tank
Filling of excavated earth and gravel for basement in layers not more than 15 cm including the cost of Gravel, transport charges,labour for filling, watering, ramming with surface vibrator, consolidating etc.,
Brick work in C.M 1 :5 for using First Class flyash bricks for substructure including the cost of all materials, transport, hire charge, scaffolding, charge for curing etc.
Brick work in C.M 1 :5 for using First Class Burnt Clay Chamber / Wire Cut bricks for supersturcture including the cost of all materials, transport, hire charge, scaffolding, charge for curing etc.
Plastering in C.M 1 :5 12mm thick including the cost of all materials, transport, hire charge for scaffolding, charge for curing, admixture etc.
Ceiling Plastering in C.M 1 :3 10mm thick including the cost of all materials, transport, hire charge for scaffolding, charge for curing, admixture etc.
Outer Plastering in C.M 1 :5 20mm thick including the cost of all materials, transport, hire charge for scaffolding, charge for curing, admixture etc.
Hire charge for steel prop scaffolding for ceiling plastering including the cost of all labour for installation, dismantling and tranport charges.
Hire charge for steel prop scaffolding for outer plastering including the cost of all labour for installation, dismantling and tranport charges.
Flooring in cm 1 :3 using Double charged virtified tiles 600mmx 600mm x 8mm including cost of all material, labour & lead lift charges. (The make and brand of the tiles should be approved by the authority before use on works)
Bathroom Flooring in cm 1 :3 using virtified tiles with 2-3mm spacers and filling the joints with MYK Lacticrete SP-100 epoxy grout including cost of all material, lead lift & labour charges. (The make and brand of the tiles should be approved by the authority before use on works)
Waterproofing of bathroom by applying of 2 coats of Fosroc brushbond RFX after cleaning up of the surface with wire brush and moisting the surface before application including cost of all material & labour charges.
Bathroom Filling using broken AAC blocks in cm 1 :8 upto required depth and placing of drain pipes with slits including cost of all material, lead lift & labour charges.
Supplying of UPVC Windows (Open Type), Ventilator as per Indian Standards including cost of all materials, fitting & transportation charges etc.,
Window W
Ventilator V
Providing of S.S Hand rails using 304L grade Stainless steel pipes including the cost of all materials and labour.,
Colour wash on the plastered surface after applying 2 coats of wall putty, 1 coat of primer, 2 coats of emulsion (First quality) including cost of all materials & labour charges Etc.,
Eletrification of the entire building as per IS standard as per detailed electrical schedule attached( please refer annexure1 )
Providing all incoming water lines, distribution lines, drainage lines with chambers, rain water lines, all fittings and other items as per detailed plumbing schedule( please refer annexure1 )
Laying of cool roof tiles with cm 1 :5 including cost of all material, lead lift & labour charges.
Laying of paver block on outer area using un-polished cement blocks of approved design over a layer of baby chips and compacting the same using plate compactor including cost of all materials and labour charges etc.,
Supplying of TMT Steel for all RCC works including cutting, bending, tying and placing in position including cost of materials and transport.
Supplying and Providing Tang bars for the shear wall alround as per Indian Standards including cost of all materials, fitting & transportation charges etc. ( please refer annexure1 )
Supplying and Providing FRB Manhole Cover(2'x2') including cost of all materials, fitting & transportation charges etc.
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
ilytenderannx.pdf
Tender Documents • 3.05 MB
BOQ_798466.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .