Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹1.9 Craccepted-finance | ₹1.9 Cr | accepted-finance |
Tender Value
₹1.4 Cr
EMD Value
₹2.1 L
Closing Date
1 Apr 2026, 10:00 pmClosed
Hubli Electricity Supply Company Limited
Construction of 04 nos of 11kV link lines for a distance of 30.25 RKm from 110/11KV Hiremural Sub Station in Muddebihal sub division of B. Bagewadi division on Total Turnkey Basis.
276722
HESCOM/2025-26/EL/WORK_INDENT1085
Open
Electrical
HESCOM Superintending Engineer (PMC)Corporate Office Hubli
₹3,470
₹2.1 L
1 Apr 2026
16 Mar 2026
2 Apr 2026
20 Mar 2026
23 Mar 2026
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Construction of 04 nos of 11kV link lines for a distance of 30.25 RKm from 110/11KV Hiremural Sub Station in Muddebihal sub division of B. Bagewadi division on Total Turnkey Basis.
Name of Sub Division Muddebihal Total
Name of Stations 110/11 Hiremural Total Qty
Conductor Route Length kms 7.0 6.2 7.0 10.0 30.25
Sl No Particulars Unit 11KV Hiremural IP 11KV Arasanal IP & Adavihulagabal IP 11KV Abbihal IP 11KV Jakkeral IP Total Qty
1 DP. Structure using 9Mtrs RCC poles.(Hard rock) Errection Sets 5 2 3 3 13
2 DP. Structure using 9Mtrs RCC poles. (Ordinary Soil Erection) Sets 2 2 7 7 18
3 RCC Pole-9.0M Long, 145Kg WL (for Deadend, Anchor Points)(Hard rock by chizling or wedging) Errection Nos 5 6 5 7 23
4 RCC Pole-9.0M Long, 145Kg WL (for Deadend, Anchor Points)(Ordinary Soil Erection) Nos 5 15 5 12 37
5 PSCC Pole-9.0M Long, 200Kg WL (for Intermediate Poles).(Hard rock by chizling or wedging) Errection Nos 29 0 42 50 121
6 PSCC Pole-9.0M Long, 200Kg WL (for Intermediate Poles).(Ordinary Soil Erection) Nos 95 95 111 118 419
7 PSCC Pole-9.0M Long, 200Kg WL (for Intermediate Poles).(Hard Soil Erection) 13 13
8 Pre stressed Tubular Spun pole 11 M-500 kg WL Nos 4 0 0 0 4
9 Spun pole Horizontal cross Arm Nos 0 0 0 0
10 PSCC pole 8Mtrs long for stud. (Ordinary Soil Erection) Nos 0 8 13 13 34
11 11KV Horizontal cross armd with H.T. Single top support, clamp bolts, Nuts and washers (for RCC pole) Sets 10 6 10 15 41
12 11KV Horizontal cross armd with H.T. Single top support, clamp bolts, Nuts and washers (for PSC pole) Sets 137 110 153 168 568
13 2-Pin Cross arm with pole clamp,bolts,nuts and washers with braces Nos 24 36 36 96
14 PG Clamps for Rabbit conductor Nos 42 37 42 60 181
15 11 kV Polymeric Pin insulators Nos 441 348 489 549 1827
16 Silcon Rubber Composite Insulator/11kV 45kN Polymeric Insulator Nos 126 126 126 288 666
17 Guy set complete.(Hard rock) Sets 19 10 10 12 51
18 Guy set complete.(Ordinary Soil Errections) Sets 19 10 20 20 69
19 Concreting Materials for guy sets (Without cement) Nos 19 10 20 20 69
20 Rabbit ACSR Conductor. Kms 21.32 19.03 21.32 30.45 92
21 Spiral earth electrode. Nos 155 120 171 187 633
22 EG stirrups with GI wire lacing. Set of 2 Nos 155 120 171 187 633
23 Anti-climbing Device (12mtrs /1kg G.I. Barbed Wire) Lumpsum. Each 114 114 122 136 486
24 Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/Dt: 24.10.07 Nos 42 37 42 60 181
25 11kV, 200Amps, Single Break GOS Nos 2 2 2 2 8
26 H-Frame for mounting GOS Nos 2 2 2 2 8
27 Releasing of 11 kV Horizontal cross arm Nos 0 0 0 0
28 Special 3 Pin Cross Arm for Hieghtning Nos 5 4 5 5 19
Tender Capacity Format
Details of work Executed during last 05 years ( To asses the value of A)
Sl No Year Work Executed Other related Electrical Works if any Cost of executed work in Rs Lakhs
HT line in Rkms LT line in Rkms DTC in Nos
Details of existing commitments and on-going works to be completed during next 13 months ( To asses the value of B) Attached in the next sheet
SL No Details of On Going works Award amount Rs in Lakhs Amount of work to be completed during next "13 months" Rs in Lakhs Completion period as per award Completion period remaining
Tender Capacity Formula= A*N*1.5-B =A*1*1.5-B
Where 'N'= 13 months of completion period for above subject work
Seal and signature of the Bidder
A= Maximum value of Distribution network work executed in any one year during the last 5 years i.e 2020-21,2021-22,2022-23, 2023-24 & 2024-25 ( UP dated to __________________ price level) taking into account the completed as well as works in progress
N= Number of years/months prescribed for completion of the works for which Tenders are invited
B= Value,at________price level, of existing commitments and on-going works to be completed during the 'N'
Note: 1) The available tender capacity shall be more than the total tender value 2) Documentary Proof in support of value ‘A’, the Total value of works executed and payments received annually in the last 5 years shall be uploaded in the form of certificates issued by Chartered Accountant. In case if the same is not uploaded, then the maximum value of annual payments received towards the works executed which is indicated in the audited balance sheet in any one year during the last five years will be considered.
Tender Capacity Format
Details of existing commitments and on-going works to be completed during next " 13 months ( To asses the value of B)
SL No Details of On Going works Award amount Rs in Lakhs Amount of work to be completed during next "13 months" Rs in Lakhs Completion period as per award Completion period remaining
Where 'N'= 13 months of completion period for above subject work
Note: The statement showing the value of existing commitments and ongoing works as well as the stipulated period of completion remaining for each of the works listed shall be countersigned by the Employer in charge, not below the rank of Executive Engineer or equivalent.( Note: L-1 in any of the recently called tender amount is also be considered as value of B along with the above)
Seal and signature of the Executive Engineer(Ele)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
4_section-iii_GCC INDENT 1085.doc
Others - GCC • 0.13 MB
11 Bagewadi - Muddebihal indent 1085 BOQ.xlsx
Others - BOQ • 0.48 MB
8 tender capacity.xlsx
Others - Tender capacity • 0.02 MB
9 Advisory NOte.pdf
Others - Advisory note • 0.67 MB
13 KPTCL Cicrcular insurance surety bond.pdf
Others - Circular • 1.59 MB
12 Stamp Duty Circular 02 03 2024.pdf
Others - Stamp Duty • 0.09 MB
3_section-ii_ITB INDENT 1085.doc
Others - ITB • 0.11 MB
2_section-i IFB INDENT 1085.doc
Others - IFB • 1.54 MB
1 NIT 1085.docx
Others - NIT • 0.11 MB
10 FD417EXP-12-2024-Dtd-09-08-2024.pdf
Others - FD Circular • 0.12 MB
6_section-v_SCC KW4INDENT 1085.doc
Others - SCC • 0.09 MB
5_section-iv_ECC INDENT 1085.doc
Others - ECC • 0.09 MB
7 Annexures.doc
Others - Annexure • 0.16 MB
Download all tender documents and submit your bid