Loading…
Loading…
Tender Value
₹144.7 Cr
EMD Value
₹2.9 Cr
Closing Date
31 Oct 2026, 11:00 am
Yes (up to 4 members)
Yes (up to 4 members)
Two Packet System
EPC [ Single Stage ]
No
Not Applicable
Lowest to Highest
180 days
Expenditure
Capital (Works)
2 X 25 KV
13 conditions · 2 needing a document upload
As per Clause 2.2.2.4 of RFP document.
Technical Capacity- For demonstrating Technical Capacity and experience (the "Technical Capacity"), the Bidder shall, during the last 5 (five) previous financial years and the current financial year up to the Base month (not to be read with para-2.1.13). (i) have received payments for construction of Eligible Project(s), or has executed construction works by itself in a PPP project, such that the sum total thereof, as further adjusted in accordance with clause 2.2.2.4 (i) & (ii), is more than 2.5 (two and half) times the Estimated Project Cost (the "Threshold Technical Capacity"). Provided that at least one fourth of the Threshold Technical Capacity shall be from the Eligible Projects in Category 1 and/ or Category 3 specified in Clause 2.2.2.4 (i) & (ii) (ii) Completed (executed) or Substantially completed$ (executed) at least one Eligible Project of Railway Sector as mentioned in clause 2.2.2.4/iii of value of not less than 50% (fifty) per cent of the Estimated Project Cost However, in case of Consortium/Joint Venture, the other members of Consortium/Joint Venture (who are not considered for satisfying this technical Capacity under this clause) also must have Completed (Executed) or Substantially completed$ at least one Eligible Project of Railway Sector as mentioned in clause 2.2.2.4/iii of value of not less than 10% (ten) per cent of the Estimated Project Cost. (iii) (a) Completed (executed) or substantially completed$ (executed) at least one similar work of value of not less than 20% (Twenty percent) of the estimated project cost. (b) Completed (executed) or substantially completed$ (executed) at least two similar works of value of not less than 10% (Ten percent) of the estimated project cost. $ Substantially Completed Work means an ongoing work in which payment equal to or more than 75% of the present contract value (excluding the payment made for adjustment of Price variation (PVC), if any) has been made to the contractor in that ongoing contract and no proceedings of termination of contract on Contractor's default has been initiated. The credential certificate in this regard should have been issued not prior to 60 days of date of invitation of present tender. Illustration for 'received payments for not less than 75 (seventy-five) percent': For contract wherein there is provision for part payment on 'procurement of goods and equipment' on basis of indemnity bond/Bank Guarantee. In all such contract, 'received payments for not less than 75 (seventy-five) percent value of present Contract Value payment' means not less than 75% payment received under procurement of goods and equipment' as well as not less than 75% payment received under 'execution/installation/ commissioning'. For avoidance of doubt, in above cl. 2.2.2.1(i) & (ii) & (iii) the amount of payment received for eligible projects or amount of payments received against PPP project shall be considered for last past 5 (five) previous financial Years and current financial year up to the base month even if project was started earlier than the said reckoned period. The meaning of executed shall be considered as completed or in progress. Please refer 2.2.2.1 of RFP documents
6 conditions · 3 needing a document upload
Important: 1.Details of technical bid.
Attachments as per RFP.
Details of bidder is to be furnished as per RFP document.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Design, Supply, Erection, Testing & Commissioning of Traction Sub Stations (Scott/V connected) with associated Switching Posts (SP/SSP) for 2 x 25 KV feeding system along with provision of associated SCADA system in upgradation of Electric Traction System from 1x25KV to 2x25KV Traction System for Kumandih- Garhwa Section of ECR to meet 3000 MT loading target.
EPC-PSI-GHD-KMND-ECR-4
EPC-PSI-GHD-KMND-ECR-4
Open
Works - General
900 Days
Patna, Bihar
₹0
₹2.9 Cr
3 Jul 2026
3 Jul 2026
17 Oct 2026
2 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | Sum | — | — | ||
| — | :- Design, with associated of associated Traction System | Supply, Erection, Testing & Switching Posts (SP/SSP) for SCADA system in upgradation of for Kumandih- Garhwa Section of | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
EPCagreementdocument.pdf
ATTACHMENT
RFPdocument.pdf
ATTACHMENT
Feasibilityreport.pdf
ATTACHMENT
LocationDrawing.pdf
ATTACHMENT
Revised160kmphPSIGuideline.pdf
ATTACHMENT
Latest EPC doc corrigendum
ATTACHMENT
corrigendum1_1.pdf
ATTACHMENT
Acceptanceofe-BankGuaranteeamendment2026_06_16.pdf
ATTACHMENT
corrigendum1_1.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].