Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹96.7 LAccepted-Finance | ₹96.7 L | L1 | Accepted-Finance Qualified |
| 2 | L2₹99.6 LAccepted-Finance VILLAGE DHANI KISHANLAL SIWANI BHIWANI 127046 | BHIWANI | HARYANA | 127046 | ₹99.6 L | L2 | Accepted-Finance Qualified |
| 3 | L3₹1.0 CrAccepted-Finance | ₹1.0 Cr | L3 | Accepted-Finance Qualified |
| 4 | L4₹1.1 CrAccepted-Finance 10 RUPANA ROAD 127046 | ₹1.1 Cr | L4 | Accepted-Finance Qualified |
| 5 | L5₹1.3 CrAccepted-Finance HARYANA HR | ₹1.3 Cr | L5 | Accepted-Finance Qualified |
Tender Value
₹1.3 Cr
EMD Value
₹3.1 L
Closing Date
6 Apr 2026, 5:00 pmClosed
RAKESH
Municipal Council Sirsa
Construction of IPB Road in Ch.Devilal Model Town Ship Mela Ground in MC Sirsa
2026_HRY_510774_1
2026AEF7CF11 C043 4C1A 97D9 33AFBCA7CF91299ULB
Open Tender
Civil Works
120 days
Sirsa
Road work
2 documents required · 2 mandatory
₹15,000
₹3.1 L
Yes
26 May 2026
25 Mar 2026
7 Apr 2026
25 Mar 2026
6 Apr 2026
25 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Works | |||||
| 1.01 | [10.10.1]Providing and laying Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 1. 40 mm thick with 20 mm nominal size stone aggregate [Through Rate] | - | Sqm | 268 | - |
| 1.02 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] | - | cum | 1,863 | - |
| 1.03 | [11.95.1]Finishing walls with Acrylic Smooth exterior paint of required shade : 1. New work (Two or more coat applied @ 1.67 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) [Through Rate] | - | Sqm | 88 | - |
| 1.04 | [17.5.3]Compacting Original Ground 3. Compaction of Earthwork
Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications [Through Rate] | - | Sqm | 7 | - |
| 1.05 | [17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [Through Rate] | - | Sqm | 655 | - |
| 1.06 | [21.84.1]Constructing brick masonry inspection Chamber sizes as given below up to 0.60 metre average depth in cement mortar 1:5 lime concrete with 40 per cent lime mortar 2:3 in foundation cement concrete 1:2:4 benching 12mm thick cement plaster 1:2 with a floating coat of 1 mm thick of neat cement R.C.C. 1:2:4 slab 100 mm thick/cement concrete topping, 50mm thick with 455mmx455mm / 455mm x610mm inside light duty C.I. inspection chamber cover and frame weight as per I.S.I. specification painted with 3 coats of black bitumastic superior paint complete as per standard design. 1. Size 450 mm X450 mm inside (with 455 mm x 455 mm cover and frame light duty single seal weighing 20 kg with C.C. topping [Through Rate] | - | Each | 3,487 | - |
| 1.07 | [3.1.2]By Mechanical Transport including loading, unloading and stacking 2. Earth [5km] | - | cum | 83 | - |
| 1.08 | [3.1.2]By Mechanical Transport including loading, unloading and stacking 2. Earth [Beyond 5km up to 10km per KM] | - | cum | 6 | - |
| 1.09 | [4.33]Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 1 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. [Through Rate] | - | cum | 138 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_589574.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid