Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹20.9 LAccepted-Finance | ₹20.9 L | 1 | Accepted-Finance REASONABLE |
| 2 | 2₹21.7 L+₹81,064.63 (3.88%)Accepted-Finance | ₹21.7 L+₹81,064.63 (3.88%) | 2 | Accepted-Finance OK |
| 3 | 3₹23.0 L+₹2.1 L (9.91%)Accepted-Finance | ₹23.0 L+₹2.1 L (9.91%) | 3 | Accepted-Finance OK |
| 4 | 4₹23.3 L+₹2.4 L (11.7%)Accepted-Finance | ₹23.3 L+₹2.4 L (11.7%) | 4 | Accepted-Finance OK |
| 5 | Not Admitted-Fee/PreQual/Technical H NO 547 MAHADEV CIRCLE INDIRA COLONY JAISALMER RAJASTHAN 345001 | JAISALMER | JAISALMER | RAJASTHAN | 345001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹26.8 L
EMD Value
₹53,700
Closing Date
16 Mar 2026, 6:00 pmClosed
EXECUTIVE OFFICER MARWAR JUNCTION
MUNICIPAL BOARD MARWAR JUNCTION
CONSTRUCTION OF BOUNDRY WALL AT MUNICIPAL LAND IN MARWAR JUNCTION
2026_DLB_543363_2
MJ_V_741_180226
Open Tender
Civil Works
Item Rate
MARWAR JUNCTION
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
MUNICIPAL BOARD MARWAR JUNCTION
₹53,700
Yes
27 Mar 2026
2 Mar 2026
17 Mar 2026
2 Mar 2026
16 Mar 2026
2 Mar 2026
Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size).
Random rubble masonry with hard stone in foundation and plinth :Cement mortar 1:6 (1 cement : 6 coarse sand)
62 mm thick cement concrete flooring with concrete hardener topping under layer 50 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) and top layer 12mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate 6mm nominal size) by volume. Hardening compound is mixed @ 2 litre per 50 kg of cement or as per manufactures specifications. This includes cost of cement slurry, but excluding the cost of nosing of steps etc. complete. including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.17 MB
BOQ_968722.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .