| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.2 LAdmitted-Finance 5 NEW MATRI PALLY BLEGHARIA KOL 56 | HOWRAH | WEST BENGAL | 711101 | -3.75% | ₹5.2 L | L1 | Admitted-Finance |
| 2 | L2₹5.5 L+₹27,273.13 (5.21%)Admitted-Finance 1 BACHAR PARA ROAD THAKURPUKUR KOLKATA 700063 | KOLKATA | KOLKATA | WEST BENGAL | 700063 | +1.26% | ₹5.5 L+₹27,273.13 (5.21%) | L2 | Admitted-Finance |
| 3 | L3₹5.6 L+₹39,957.04 (7.63%)Admitted-Finance 1011 RAJA MANINDRA ROAD KOLKATA 700037 | KOLKATA | KOLKATA | WEST BENGAL | 700037 | +3.59% | ₹5.6 L+₹39,957.04 (7.63%) | L3 | Admitted-Finance |
Tender Value
₹5.4 L
EMD Value
₹10,900
Closing Date
27 Jun 2026, 1:00 pmClosed
Director_General_Park_and_Square
5, S N Banerjee Road, Kolkata-700013
PLANTATION ONE THOUSAND (1000) NOS DEPARTMENTALLY SUPPLIED SAPLING INCLUDING SUPPLY OF 700 NOS BAMBOO TREE GUARDS IN DIFFERENT PLACES OF BR.-X.(2026-27).
2026_KMC_1028993_1
KMC/DG(PS)/X/PLANT/26-27
Open Tender
CIVIL WORKS
Percentage
45 days
Kolkata
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹10,900
10 Jul 2026
19 Jun 2026
30 Jun 2026
20 Jun 2026
27 Jun 2026
20 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS(N) THATCH, MUD AND BAMBOO WORKS.(A). ORIGINAL WORKS?..(2)Strong bamboo posts, posts plates, rafters, ties etc. fitted and fixed complete with coir rope or nails as directed. (Embedded portion of posts shall also be paid for against this item cost of digging hole and repacking being paid forseperately) :(a) 75 mm. dia bamboo | 750 | MTR | 50 | ₹37,500 |
| 2 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 0.41 | %M3 | 11,927 | ₹4,830.55 |
| 3 | BUILDING WORKS. (T)MISCELLANEOUS WORKS: A. SPECIAL WORKS. I. HORTICULTURE: 1. Supplying and stacking of good earth (adequate for horticulture work) at site including royalty (earth measured in stack will be reduced by 20% for payment) | 27 | M3 | 306 | ₹8,262 |
| 4 | BUILDING WORKS. (T)MISCELLANEOUS WORKS: A. SPECIAL WORKS. I. HORTICULTURE: 2.Supplying and stacking sludge (adequate for Horticulture work) at site in dry cake form from approved disposal work site including royalty, all lead and lift etc. (Sludge measured in stack will be reduced by 8%). | 13.5 | M3 | 457 | ₹6,169.5 |
| 5 | BUILDING WORKS. (T)MISCELLANEOUS WORKS: A. SPECIAL WORKS. I. HORTICULTURE: 3.Spreading of sludge, dump manure,/farm yard manure/animel dung manure and good earth in required thickness. This includes supply of labour, tools & plants excluding materials. | 0.9 | %SQ | 175 | ₹157.5 |
| 6 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 2. Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m In ground floor including roof. (a) upto 150 mm. thick | 13.5 | M3 | 939 | ₹12,676.5 |
| 7 | "SUPPLY OF BAMBOO TREE GUARD TRIANGULAR IN SHAPE,SIZE BEING 0.60M*0.60M*0.60M*1.20M HEIGHT MADE 75MM DIA BAMBOO AS MAIN PART AND BRACINGS WITH HALF SPLIT BAMBOO AND COVERED WITH 20G G.I WIRE NET INCLUDING THE COST OF NAILS ETC. AND TWO COATS OF OIL PAINTING OVER A COAT OF PRIMER COMPLETE IN ALL RESPECT AS PER DIRECTION OF E.I.C | 700 | EA | 530 | ₹3,71,000 |
| 8 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. | 60 | EA | 269.5 | ₹16,170 |
| 77 | Sub Total | - | - | - | - |
| 78 | GST 18% | - | Nos. | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
SPE_CON.pdf
Additional Documents • 0.39 MB
BOQ_2527258.xls
BOQ • 0.28 MB
Ten_and_dec.pdf
Additional Documents • 0.85 MB
Ten_Doc.pdf
Tender Documents • 0.92 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .