Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹5.4 L
Closing Date
30 Sept 2021, 6:55 pmClosed
Executive Engineer REW Div. Poonch
Office of the Executive Engineer REW Div. Poonch
Please refer to BOQ
2021_RDPR_138852_1
e-NIT No. 58 of REW Poonch dated 10-09-2021
Open Tender
Civil Works
Item Rate
15 days
Poonch
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Yes
Executive Engineer REW Div. Poonch
Exempted
19 Oct 2021
11 Sept 2021
1 Oct 2021
11 Sept 2021
30 Sept 2021
11 Sept 2021
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil : Rate for a lead upto 1 meter from cutting edge
CEMENT CONCRETE (CAST-IN-SITU) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with P/L of Hand Packed Stone (Plum), (30%) for cement concrete, excluding carriage of Stone (Plum)
FORM WORK Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete
Hand-packing stones; excluding cost of stones
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Dumping stone excluding cost of stones. in Horizontal on level
Carriage of sand/bagri from 45km by MT and 450 Mtr by HL
Carriage of stone from 800m by HL
Installation / Construction of Sign Board (C.I.B) Showing details of project of required specifications, as directed by Engineer Incharge at Site.
Basharat Azeem
Waseem Iqbal
M/S Zulafkar ALI khan
Ghazenfer Ali Khan
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .