Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹42.0 LAdmitted-Finance | -0.01% | ₹42.0 L | L1 | Admitted-Finance |
| 2 | L2₹42.0 L+₹840.27 (0.02%)Admitted-Finance | +0.01% | ₹42.0 L+₹840.27 (0.02%) | L2 | Admitted-Finance |
| 3 | L3₹42.4 L+₹42,433.64 (1.01%)Admitted-Finance | +1.00% | ₹42.4 L+₹42,433.64 (1.01%) | L3 | Admitted-Finance |
Tender Value
₹42.0 L
EMD Value
₹42,500
Closing Date
4 Jun 2026, 5:00 pmClosed
Add. Chief Executive Officer
Z P Works Division Buldana
IMPROVEMENT OF SH-269 TO PALSHI KH. TO DISTRICT BORDER ROAD (ODR-80) TQ. KHAMGAON DIST.BULDANA (CH.2/00 TO 3/500) (WITH HOT MIX)
2026_BULDH_1304641_5
01/2026-27
Open Tender
Civil Works
Percentage
180 days
IMPROVEMENT OF SH-269 TO PALSHI KH. TO DISTRICT BO
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,180
₹42,500
22 Jun 2026
21 May 2026
6 Jun 2026
21 May 2026
4 Jun 2026
21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary backfilling, ramming, watering including shoring and strutting etc. complete. (Lift upto 0.00 to 1.50 m.) By Mechanical Means(Item No.21.02) | 117.37 | Cum | 207 | ₹24,295.59 |
| 2 | Providing soling using 80 mm size trap metal in 15 cm. layer including filling voids with Crushed sand/ grit, ramming, watering etc. complete. (Item No.21.40) | 21.45 | Cum | 2,140.67 | ₹45,917.37 |
| 3 | Providing and laying in situ ready mix cement concrete of M-10 proportion with trap/granite/quartzite/gneiss metal infoundation including necessary formwork, compacting and curing etc. complete. (with reversible drum type mixer with SCADA with fine agreegates of required specifications (Natural sand / VSI sand finely washed etc ) (Item No.11.02) | 84.14 | Cum | 6,906.15 | ₹5,81,083.46 |
| 4 | Providing and laying cement concrete pipe of IS 458:2003 NP-2 class of 1000mm diameter in proper line, level and slope including providing and fixing collars in cement mortar 1:2 and curing etc. complete. (Item No.11.12) | 22.5 | Rmt | 5,465 | ₹1,22,962.5 |
| 5 | Providing and laying cement concrete pipe of IS 458:2003 NP-2 class of 800mm diameter in proper line, level and slope including providing and fixing collars in cement mortar 1:2 and curing etc. complete. (Item No.11.10) | 35 | Rmt | 4,099 | ₹1,43,465 |
| 6 | Providing cast in situ / ready mix M20 grade cement concrete for head walls of CD work / retaining walls etc. including necessary form work, compaction, finishing and curing etc. complete. (with reversible drum type mixer/ concrete batch mix plant (pan mixer) with SCADA (Item No.11.29) | 70.76 | Cum | 10,552.87 | ₹7,46,721.08 |
| 7 | Providing and laying in situ / ready mix M-20 cement concrete of trap /granite /quartzite /gneiss metal for approach slab / Rigid pavement including compacting, finishing, curing etc. complete. (excluding reinforcement) (with reversible drum type mixer/ concrete batch mix plant (pan mixer) with SCADA with fine agreegates of required specifications (Natural sand / VSI sand finely washed etc ), cement 6.40 bags/cumt) (Item No.11.25) | 17.82 | Cum | 8,030.87 | ₹1,43,110.1 |
| 8 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. (Item No.2.09) | 856.8 | Sqm | 12 | ₹10,281.6 |
| 9 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. (Item No.2.18) | 1,028.16 | Cum | 119 | ₹1,22,351.04 |
| 10 | Watering and compacting of embankment formed of materials obtained from the road cutting within a lead of 50 m, not less than 97% of standard Proctor density after laying them in layers of 20 cm. to 30 cm. with Power roller. (Item No.2.24) | 589.05 | Cum | 79 | ₹46,534.95 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
5_palsi.pdf
Tender Documents • 0.91 MB
BOQ_2239639.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .