Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹49.8 L
EMD Value
₹50,000
Closing Date
25 Aug 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director, DRDA, Sivagangai
O/o The Project Director, DRDA, Sivagangai
AGAMT II 2021-22 Rejuvenation of water bodies works at Sakkottai Block in Sivagangai District - Package No. 106
2022_RDTN_247633_1
106_Pack_AGAMT II 21-22/SKTI
Open Tender
Civil Works
Item Rate
30 days
SIVAGANGAI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹50,000
5 Sept 2022
20 Aug 2022
25 Aug 2022
20 Aug 2022
25 Aug 2022
20 Aug 2022
Amount
Improvement to Sri pillaiyar kovil Yenthal Oorani at Jeyankondan Village in Jeyankondan Panchayat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation and for foundation in all soils and sub-soils to full depth as may be directed wherever necessary and refilling the sides of foundation
INLET
Earth work excavation and for foundation in all soils and sub-soils to full depth as may be directed wherever necessary and refilling the sides of foundation
Supplying and filling in foundation and basement with filling sand in layers not more than 15 cm thick well rammed, watered and compacted complete
Cement concrete 1 : 4 : 8 mix using 40 mm gauge hand broken granite stone jelly for foundation
Providing Centering charges for C.C works including material all labour charges etc.,completed.
Cement concrete 1 : 3 :6 mix using 40 mm gauge hand broken granite stone jelly for foundation
Supply of NP3 pipe including suitabel collars including cost and conveyance at site etc., complete.
INNER BOND
Earth work excavation and for foundation in all soils and sub-soils to full depth as may be directed wherever necessary and refilling the sides of foundation
Supplying and filling in foundation and basement with filling sand in layers not more than 15 cm thick well rammed, watered and compacted complete
Cement concrete 1 : 4 : 8 mix using 40 mm gauge hand broken granite stone jelly for foundation
Providing Centering charges for C.C works including material all labour charges etc.,completed.
Cement concrete 1 : 3 :6 mix using 40 mm gauge hand broken granite stone jelly for foundation
BATHING GHAT
Earth work excavation and for foundation in all soils and sub-soils to full depth as may be directed wherever necessary and refilling the sides of foundation
Supplying and filling in foundation and basement with filling sand in layers not more than 15 cm thick well rammed, watered and compacted complete
Cement concrete 1 : 4 : 8 mix using 40 mm gauge hand broken granite stone jelly for foundation
Providing Centering charges for C.C works including material all labour charges etc.,completed.
Cement concrete 1 : 3 :6 mix using 40 mm gauge hand broken granite stone jelly for foundation
RETAINING WALL
Earth work excavation and for foundation in all soils and sub-soils to full depth as may be directed wherever necessary and refilling the sides of foundation
Supplying and filling in foundation and basement with filling sand in layers not more than 15 cm thick well rammed, watered and compacted complete
Cement concrete 1 : 4 : 8 mix using 40 mm gauge hand broken granite stone jelly for foundation
Providing Centering charges for C.C works including material all labour charges etc.,completed.
Cement concrete 1 : 3 :6 mix using 40 mm gauge hand broken granite stone jelly for foundation
Improvement to Solaimalai Sengai Oorani at Green city nagar in Sangarapuram Panchayat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation and for foundation in all soils and sub-soils to full depth as may be directed wherever necessary and refilling the sides of foundation
INLET
Earth work excavation and for foundation in all soils and sub-soils to full depth as may be directed wherever necessary and refilling the sides of foundation
Supplying and filling in foundation and basement with filling sand in layers not more than 15 cm thick well rammed, watered and compacted complete
Cement concrete 1 : 4 : 8 mix using 40 mm gauge hand broken granite stone jelly for foundation
Providing Centering charges for C.C works including material all labour charges etc.,completed.
Cement concrete 1 : 3 :6 mix using 40 mm gauge hand broken granite stone jelly for foundation
Supply of NP3 pipe including suitabel collars including cost and conveyance at site etc., complete.
OUTLET
Earth work excavation and for foundation in all soils and sub-soils to full depth as may be directed wherever necessary and refilling the sides of foundation
Supplying and filling in foundation and basement with filling sand in layers not more than 15 cm thick well rammed, watered and compacted complete
Cement concrete 1 : 4 : 8 mix using 40 mm gauge hand broken granite stone jelly for foundation
Providing Centering charges for C.C works including material all labour charges etc.,completed.
Cement concrete 1 : 3 :6 mix using 40 mm gauge hand broken granite stone jelly for foundation
Supply of NP3 pipe including suitabel collars including cost and conveyance at site etc., complete.
INNER BOND
Earth work excavation and for foundation in all soils and sub-soils to full depth as may be directed wherever necessary and refilling the sides of foundation
Supplying and filling in foundation and basement with filling sand in layers not more than 15 cm thick well rammed, watered and compacted complete
Cement concrete 1 : 4 : 8 mix using 40 mm gauge hand broken granite stone jelly for foundation
Providing Centering charges for C.C works including material all labour charges etc.,completed.
Cement concrete 1 : 3 :6 mix using 40 mm gauge hand broken granite stone jelly for foundation
BATHING GHAT
Earth work excavation and for foundation in all soils and sub-soils to full depth as may be directed wherever necessary and refilling the sides of foundation
Supplying and filling in foundation and basement with filling sand in layers not more than 15 cm thick well rammed, watered and compacted complete
Cement concrete 1 : 4 : 8 mix using 40 mm gauge hand broken granite stone jelly for foundation
Providing Centering charges for C.C works including material all labour charges etc.,completed.
Cement concrete 1 : 3 :6 mix using 40 mm gauge hand broken granite stone jelly for foundation
RETAINING WALL
Earth work excavation and for foundation in all soils and sub-soils to full depth as may be directed wherever necessary and refilling the sides of foundation
Supplying and filling in foundation and basement with filling sand in layers not more than 15 cm thick well rammed, watered and compacted complete
Cement concrete 1 : 4 : 8 mix using 40 mm gauge hand broken granite stone jelly for foundation
Providing Centering charges for C.C works including material all labour charges etc.,completed.
Cement concrete 1 : 3 :6 mix using 40 mm gauge hand broken granite stone jelly for foundation
Improvement to Perichikovil Oorani at Thanthai periyar nagar in Sankarapuram Panchayat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation and for foundation in all soils and sub-soils to full depth as may be directed wherever necessary and refilling the sides of foundation
INLET
Earth work excavation and for foundation in all soils and sub-soils to full depth as may be directed wherever necessary and refilling the sides of foundation
Supplying and filling in foundation and basement with filling sand in layers not more than 15 cm thick well rammed, watered and compacted complete
Cement concrete 1 : 4 : 8 mix using 40 mm gauge hand broken granite stone jelly for foundation
Providing Centering charges for C.C works including material all labour charges etc.,completed.
Cement concrete 1 : 3 :6 mix using 40 mm gauge hand broken granite stone jelly for foundation
Supply of NP3 pipe including suitabel collars including cost and conveyance at site etc., complete.
INNER BOND
Earth work excavation and for foundation in all soils and sub-soils to full depth as may be directed wherever necessary and refilling the sides of foundation
Supplying and filling in foundation and basement with filling sand in layers not more than 15 cm thick well rammed, watered and compacted complete
Cement concrete 1 : 4 : 8 mix using 40 mm gauge hand broken granite stone jelly for foundation
Providing Centering charges for C.C works including material all labour charges etc.,completed.
Cement concrete 1 : 3 :6 mix using 40 mm gauge hand broken granite stone jelly for foundation
BATHING GHAT
Earth work excavation and for foundation in all soils and sub-soils to full depth as may be directed wherever necessary and refilling the sides of foundation
Supplying and filling in foundation and basement with filling sand in layers not more than 15 cm thick well rammed, watered and compacted complete
Cement concrete 1 : 4 : 8 mix using 40 mm gauge hand broken granite stone jelly for foundation
Providing Centering charges for C.C works including material all labour charges etc.,completed.
Cement concrete 1 : 3 :6 mix using 40 mm gauge hand broken granite stone jelly for foundation
RETAINING WALL
Earth work excavation and for foundation in all soils and sub-soils to full depth as may be directed wherever necessary and refilling the sides of foundation
Supplying and filling in foundation and basement with filling sand in layers not more than 15 cm thick well rammed, watered and compacted complete
Cement concrete 1 : 4 : 8 mix using 40 mm gauge hand broken granite stone jelly for foundation
Providing Centering charges for C.C works including material all labour charges etc.,completed.
Cement concrete 1 : 3 :6 mix using 40 mm gauge hand broken granite stone jelly for foundation
Deepening And Improvements Of Ambeni Oorani In Amaravathi Pudhur Village & Panchayat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation and for foundation in all soils and sub-soils to full depth as may be directed wherever necessary and refilling the sides of foundation
INNER BOND
Earth work excavation and for foundation in all soils and sub-soils to full depth as may be directed wherever necessary and refilling the sides of foundation
Supplying and filling in foundation and basement with filling sand in layers not more than 15 cm thick well rammed, watered and compacted complete
Cement concrete 1 : 4 : 8 mix using 40 mm gauge hand broken granite stone jelly for foundation
Providing Centering charges for C.C works including material all labour charges etc.,completed.
Cement concrete 1 : 3 :6 mix using 40 mm gauge hand broken granite stone jelly for foundation
BATHING GHAT
Earth work excavation and for foundation in all soils and sub-soils to full depth as may be directed wherever necessary and refilling the sides of foundation
Supplying and filling in foundation and basement with filling sand in layers not more than 15 cm thick well rammed, watered and compacted complete
Cement concrete 1 : 4 : 8 mix using 40 mm gauge hand broken granite stone jelly for foundation
Providing Centering charges for C.C works including material all labour charges etc.,completed.
Cement concrete 1 : 3 :6 mix using 40 mm gauge hand broken granite stone jelly for foundation
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
R.V.K.VENKATACHALAPATHY
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .