Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹33.7 LAdmitted-Finance | -25.11% | ₹33.7 L | L1 | Admitted-Finance |
| 2 | L2₹35.2 LAdmitted-Finance | -21.77% | ₹35.2 L | L2 | Admitted-Finance |
| 3 | L3₹36.4 LAdmitted-Finance DAULPURA MANDALGARH | BHILWARA | RAJASTHAN | 305625 | -18.99% | ₹36.4 L | L3 | Admitted-Finance |
| 4 | L4₹45.0 LAdmitted-Finance | +0.00% | ₹45.0 L | L4 | Admitted-Finance |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
10 Feb 2026, 1:00 pmClosed
Dy. Conservator of Forest Bhilwara
Dy. Conservator of Forest Bhilwara
Range Kshetra mandalgarh ke Adhin Vankhando me Varsh 2025-26 me Khai ki Bad avm Bandh/Tatband ke liye Mitti ka Karya Yantrik / Machinery se
2026_FORES_533047_1
NIT-14/2025-26 FOREST BHILWARA
Open Tender
Civil Works
60 days
Bhilwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Egrass Challan Deposit
₹90,000
Yes
11 Feb 2026
29 Jan 2026
10 Feb 2026
29 Jan 2026
10 Feb 2026
29 Jan 2026
1. Ditch Fencing Work 3.29 For the following works carried out by mechanical means (JCB) rates will be as: 3.29.1.5 Hard clayey soil in kankar murad 3.29.1 New ditch fencing excavation:-1.2 meter deep, 1.5 meter wide at top and 0.90 wide at bottom (1.44 cum) dug out of soil and making the bun *
3.29 For the following works carried out by mechanical means (JCB) rates will be as: 3.29.1.6 In soft rock 3.29.1 New ditch fencing excavation:-1.2 meter deep, 1.5 meter wide at top and 0.90 wide at bottom (1.44 cum) dug out of soil and making the bun
2.Earth work for bund/ embankment Work Earth work for bund/ embankment in dry or moist soil with the help of tractor attached with scraper including laying in layers of 15 cm breaking of clods, sorting of grasses, pebbles etc. And dressing in required profile when compacted manually* within initial lead of 30 m and lift of 1.50 m rate of tractor (35-40 Hp) with POL & scraper (Excluding charges of watering & compaction) In hard soil
Earth work for bund/ embankment in dry or moist soil with the help of tractor attached with scraper including laying in layers of 15 cm breaking of clods, sorting of grasses, pebbles etc. And dressing in required profile when compacted manually within initial lead of 30 m and lift of 1.50 m rate of tractor (35-40 Hp) with POL & scraper (Excluding charges of watering & compaction) 7.1 In soft/ordinary soil
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
TENDER-FROM-14.pdf
Tender Documents • 1.00 MB
BOQ_950086.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid