| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.3 LAccepted-Finance | L1 | Accepted-Finance Low | |
| 2 | L2₹18.4 L+₹17,058.89 (0.93%)Accepted-Finance | L2 | Accepted-Finance High |
Tender Value
₹19.1 L
EMD Value
₹20,000
Closing Date
16 Apr 2025, 3:00 pmClosed
BDO VP
KNR Union at Padappai
Providing Improvements to Village Burial Ground Cremation Shed , Compound wall , CC Pavement at Vattambakkam Panchayat
2025_RDTN_539395_1
DRDAKPM 249 / A10 / No . 2 / 2024 / Dated 02.04.2025
Open Tender
Civil Works - Others
Works
120 days
Vattambakkam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹20,000
18 Apr 2025
7 Apr 2025
16 Apr 2025
7 Apr 2025
16 Apr 2025
7 Apr 2025
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Cement concrete 1 :2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying & Erecting centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle Upto base
Supplying & Erecting centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle Above base
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering Upto Base
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering above Base
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications. Upto Base
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications. Above Base
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.
Plastering with CM 1:5, 12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Roof finshed with one course of pressed tiles of size 23x23x2cm mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Emulsion Paint Finish two coats using best Quality Plastic emulsion in all the floors using best quality & approved variety of colouring pigments including cost of Materials & scaffolding charges etc., complete complying with standard specifications and as directed
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting butinclusive of shoring, strutting and bailing out water wherever necessaryand refilling the sides of foundation with excavated earth in layers of notmore than 15cm.thick well rammed and consolidated
Filling of M sand From Approved quarry for Foundation including watering whenever necessary and laid in layers not more than 15 cm thick.compacting etc., complete complying within standard specification and as directed
Cement Concrete 1:4:8 (one cement , five sand, and Ten hard broken stone) Using 40 mm gauge Hand Broken Granite stone jelly for Foundation including watering whenever necessary and laid in layers not more than 15 cm thick.compacting etc., complete complying within standard specification and as directed
Supplying, fabricating and placing in position mild steel or ribbed tor steel and all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc. complete complying with standard specification (MS rods or RTS bars will be supplied departmentally at section stores and cost will be recovered at issue rate) . The binding wire shall be supplied by the contractor.
Cement Concrete 1:1.5:3 (one cement , two sand, and four hard broken stone) using 20 mm , gauge machine broken hard granite stones jelly for RCC items of works upto GL
Cement Concrete 1:1.5:3 (one cement , two sand, and four hard broken stone) using 20 mm , gauge machine broken hard granite stones jelly for RCC items of works Above GL
Brick work in Cement Mortar 1:5 (One cement and five sand) using Country Bricks ground moulded of size 23 x11 x7cm. For the following including curing etc., complete complying with standard specification.
Plastering with CEMENT MORTAR 1:5 (one cement and five sand)12 mm. thick in all floor including curing etc.Complete complying with standard specification.
Emulsion Colour washing Two coats with freshly burnt shell lime in all floors using best quality and approved variety of colour pigments including cost of all materials, brushes,and scaffolding charges etc.. Complete
Supply & Erecting centring for Sides & Soffits of CC Works including cost and conveyance of all materials to site and all labour charges etc complete
Drilling of borewells of size 6" to 8" dia. in sedimentary formation using hand boreset including insertion of casing pipe etc., and supplying and packing of pebbles , Conveyance of hand bore set including loading and unloading to be done by the contractor)
Reaming of 150mm to 300mm dia bore ,etc
Supply & delivery of 150mm Dia PVC Plain Casing pipe
Supply & delivery of 150mm Dia PVC Slotted Casing pipe
Charges for developing the borewell with air compressor of 300 CFM capacity (Minimum 8 Hours) including transportation labour and On fuel charges for compressor as directed by TWAD Board Officers and conducting yield test by ‘V’ notch method.
Supply & Delivery of India Mark II Deep Borewell handpump with 30m (10x 3m) connecting rods , Cylinders & telecscopic Stand
Supply & fixing of 32mm GI Pipe in RM including cost & Conveyance of all materials & Labour charges,etc
Supply & fixing of 32mm GI Socket in Nos
Erection Charges of India Mark II Deep Borewell handpump
Construction of Platform as per TWAD Board Type Design
Construction of Soak Pit to Drain waste water including cost & Conveyance of all materials,etc
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications
Plain Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Plain Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all Materials and all Labour charges ,etc complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Supply & Erecting centring for Sides & Soffits of CC Works Including cost & conveyance of all Materials and all Labour charges
Plain Cement concrete 1:1 1/2:3 mix using 20mm ISS metal including cost and conveyance of all Materials and all Labour charges ,etc complete
Supply & Fixing of Bitumen pad in CC Pavement Including cost & conveyance of all Materials and all Labour charges, etc complete
Supply & Filling of Good Gritty Gravel from Approved Quarry & Laid in Layers including cost of Materials & all labour charge etc.,complete
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_642291.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .