| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-AOC | ₹2.1 Cr | L1 | Accepted-AOC LOWEST |
| 2 | L2₹2.6 CrRejected-Finance | ₹2.6 Cr | L2 | Rejected-Finance HIGH RATE BIDDER |
| 3 | L3₹2.6 CrRejected-Finance VILLAGE GOBINDAPUR POST SONHA DISTRICT BASTI | BASTI | UTTAR PRADESH | ₹2.6 Cr | L3 | Rejected-Finance HIGH RATE BIDDER |
| 4 | L4₹2.8 CrRejected-Finance | ₹2.8 Cr | L4 | Rejected-Finance HIGH RATE BIDDER |
| 5 | L5₹2.8 CrRejected-Finance | ₹2.8 Cr | L5 | Rejected-Finance HIGH RATE BIDDER |
| Sl No | Description | Qty | Unit | M/S BABY SHAHI L7 | M/S BALA JI ENTERPRISES L3 | M/S RADHIKA CONSTRUCTION COMPANY L4 | Mohammad Abdulla L8 | M P Traders L9 | M/s Shail Devi L6 | M/s Shrinet Traders L1 | M/S PRABHAT TRADERS L2 | BALENDRA SINGH L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by hydraulic excavator in all type of soil with proper disposal including lead up to 30m & lift up to 1.5m with levelling, dressing to profile and manual compaction etc required for proper completion of work as per direction of Engineer-In-Charge But excluding Cost of GST. | 12,233.72 | Cum. | 50 ₹6.1 L | 39 ₹4.8 L | 45.12 ₹5.5 L | 27 ₹3.3 L | 30 ₹3.7 L | 100 ₹12.2 L | 48.88 ₹6.0 L | 28.73 ₹3.5 L | 38 ₹4.6 L |
| 2.00 | Supplying & Dumping of Nylon crate of size 1MX1MX1M having mesh size 200mmX200mm weight not less then 165 gm/nos. packed with RBM filled new EC bag sewed with machine for making plateform including colletion of R.B.M. with mud pump and cost of all material, labour, T&P etc required for proper completion of work as per direction of Engineer-In-Charge. But excluding Cost of GST. | 6,308 | Nos. | 799 ₹50.4 L | 560 ₹35.3 L | 500 ₹31.5 L | 795 ₹50.1 L | 796 ₹50.2 L | 700 ₹44.2 L | 688 ₹43.4 L | 500 ₹31.5 L | 750 ₹47.3 L |
| 3.00 | Supplying & Laying of high performance woven Geo bag of Size 1.00MX0.75M (filling volume 0.125cum) filled with R.B.M., sewed with machine, placed in polypropylene rope Gabion size 1.8MX1.8MX0.5M having mesh size 15cmX15cm with lids and slings, polypropylene with adequate U.V stabilizer 9.00mX4 strand having a weight of 42gm/M, 1560kg breaking strength rope and woven joint at intersection of rope net 1000Kg/M breaking strength, laid over R.B.M. platform including collection of R.B.M. with mud pump and cost of all material, labour, T&P etc. required for proper completion of work as per direction of Engineer-In-Charge But excluding Cost of GST. | 7,722 | Cum. | 2,600 ₹2.0 Cr | 2,360 ₹1.8 Cr | 2,345 ₹1.8 Cr | 2,715 ₹2.1 Cr | 2,716 ₹2.1 Cr | 2,300 ₹1.8 Cr | 1,565 ₹1.2 Cr | 2,342 ₹1.8 Cr | 2,400 ₹1.9 Cr |
| 4.00 | Supplying & Laying Geotextile sheet 200 GSM woven multifilament polypropylene yarn on slope of bank with pegs including preparation of sub-grade and cost of all material, labour, T&P etc required for proper completion of work. But excluding Cost of GST. | 5,010.75 | Sqm. | 95 ₹4.8 L | 112 ₹5.6 L | 85 ₹4.3 L | 104.8 ₹5.3 L | 105 ₹5.3 L | 120 ₹6.0 L | 118 ₹5.9 L | 97.1 ₹4.9 L | 89 ₹4.5 L |
| 5.00 | Supplying & Laying of high performance woven Geo Bag of size 1.00MX0.75M (filling volume 0.125cum) filled with R.B.M., sewed with machine laid for slope pitching, covered with earth upto 30 cm thickness including collection of RBM with mud pump and cost of all material, labour, T&P etc required for proper completion of work as per direction of Engineer-In-Charge. But excluding Cost of GST. | 2,254.84 | Cum. | 1,600 ₹36.1 L | 1,360 ₹30.7 L | 2,345 ₹52.9 L | 1,889 ₹42.6 L | 1,890 ₹42.6 L | 2,500 ₹56.4 L | 1,448 ₹32.7 L | 1,602 ₹36.1 L | 1,500 ₹33.8 L |
Tender Value
Refer Docs
EMD Value
₹6.9 L
Closing Date
9 Apr 2026, 3:00 pmClosed
SUPERINTENDING ENGINEER
IX CIRCLE IRRIGATION WORKS BAHRAICH
Anti-Erosion Work for protection of Village group Narayanpur, Kasiyapur, Bedaura on Right Bank of Rapti River in District Shrawasti. (LOT-03)
2026_UPIDC_1122208_12
01/SE-IX/2025-26
Open Tender
Civil Works
90 days
BHINGA, SHRAWASTI
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,075
₹6.9 L
IX CIRCLE IRRIGATION WORKS BAHRAICH
20 Apr 2026
3 Apr 2026
9 Apr 2026
3 Apr 2026
9 Apr 2026
3 Apr 2026
3 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation by hydraulic excavator in all type of soil with proper disposal including lead up to 30m & lift up to 1.5m with levelling, dressing to profile and manual compaction etc required for proper completion of work as per direction of Engineer-In-Charge But excluding Cost of GST. | - | Cum. | - | - |
| 0.0 | Supplying & Dumping of Nylon crate of size 1MX1MX1M having mesh size 200mmX200mm weight not less then 165 gm/nos. packed with RBM filled new EC bag sewed with machine for making plateform including colletion of R.B.M. with mud pump and cost of all material, labour, T&P etc required for proper completion of work as per direction of Engineer-In-Charge. But excluding Cost of GST. | - | Nos. | - | - |
| 0.0 | Supplying & Laying of high performance woven Geo bag of Size 1.00MX0.75M (filling volume 0.125cum) filled with R.B.M., sewed with machine, placed in polypropylene rope Gabion size 1.8MX1.8MX0.5M having mesh size 15cmX15cm with lids and slings, polypropylene with adequate U.V stabilizer 9.00mX4 strand having a weight of 42gm/M, 1560kg breaking strength rope and woven joint at intersection of rope net 1000Kg/M breaking strength, laid over R.B.M. platform including collection of R.B.M. with mud pump and cost of all material, labour, T&P etc. required for proper completion of work as per direction of Engineer-In-Charge But excluding Cost of GST. | - | Cum. | - | - |
| 0.0 | Supplying & Laying Geotextile sheet 200 GSM woven multifilament polypropylene yarn on slope of bank with pegs including preparation of sub-grade and cost of all material, labour, T&P etc required for proper completion of work. But excluding Cost of GST. | - | Sqm. | - | - |
| 0.0 | Supplying & Laying of high performance woven Geo Bag of size 1.00MX0.75M (filling volume 0.125cum) filled with R.B.M., sewed with machine laid for slope pitching, covered with earth upto 30 cm thickness including collection of RBM with mud pump and cost of all material, labour, T&P etc required for proper completion of work as per direction of Engineer-In-Charge. But excluding Cost of GST. | - | Cum. | - | - |
stage.html
html • 0.07 MB
technical_2114784.pdf
techsummary_2114784.pdf
finance_2114784.pdf
BOQ Comparative Chart
xlsx
finsummary_2114784.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
TENDERLOT03.pdf
Tender Documents • 6.53 MB
BOQ_2114784.xls
BOQ • 0.27 MB